Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register1 open by-law investigation
Needs a closer lookNot resolved in the City's records: 26 121093 PRS 00 IR (Property Standards, 2026, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations1 open by-law investigation may be at this address
Needs a closer lookThe City's records show 26 121093 PRS 00 IR (Property Standards, Rescheduled) at 65 CHURCH ST, an address that also exists in York. The record does not say which property it is about: this house or the other one.
What it means. If the file is about this house and the City issues an order, the order stays with the property, not the seller.
How to confirm. Ask the seller whether the City has an open file on the house. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 building permits open, the oldest since 2012
Needs a closer lookStill open in the City's records: 13 167674 (Proposal for exterior buried storm plus one catch basin (see also 09-197871 BLD), 2013, status Permit Issued); 12 170587 (Revise door swing, 2012, status Revision Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 by-law investigations closed in the last two years
Good to knowClosed files (Notice Issued Prop Standards, Property Standards): 25 137694 PRS 00 IV (Notice Issued Prop Standards: The tree, plant, limb or branch, which is located on the..., 2025); 25 119940 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 133767 (Repair localized roof damages, 2026); 09 197871 (FS - Sprinkler Shop Drawing - Proposal to construct three-storey addition with one base..., 2010).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications14 development applications open within 300 m
Good to know14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
19 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 133767Permit Issued
Repair localized roof damages.
Apr 28, 2026 · 65 CHURCH ST - By-law investigation26 121093 PRS 00 IRRescheduled
Property Standards
Feb 24, 2026 · 106 KING ST E - By-law investigation25 137694 PRS 00 IVClosed
Notice Issued Prop Standards: The tree, plant, limb or branch, which is located on the property is diseased, decayed or damaged and has not been removed or otherwise pruned to remove the dis
Feb 21, 2025 · 106 KING ST E - By-law investigation25 119940 PRS 00 IRClosed
Property Standards
Feb 21, 2025 · 106 KING ST E - Building permit23 151904Closed
To install one certified tent 10' x 50' A Frame tent (Cert #: 15-152028).
May 30, 2023 · 106 KING ST E - Building permit14 259199Closed
To install a backflow preventer.
Dec 12, 2014 · 135 ADELAIDE ST E - Building permit14 142188Closed
Proposal to install three certified tents at the Cathedral Church of St James Parish, 1) 40 ft x 130 ft Archtop Frame Tent (Certified #11 167179), 2) 30 ft x 60 ft Archtop Frame Tent (Certified #11 167176) and 2) 10ft x 40ft Std Pipe Frame Tent (Certified # 166654), tents to be install April 14th and be in operation till April 17th, 2014
Apr 14, 2014 · 106 KING ST E - Building permit13 246786Closed
REVISION: Change certified tent to 11-167389 and 11-167047 as per plans attached. Proposal to install 2 temporary certified tents at The Cathedral Church of St James Parish Hall. Tent 1 -15m X 15m (#11-167315), tent 2 10'x40'(# 11-166654). Dec 6/13 - Dec 8/13. Convenience address is 65 Church St.
Nov 4, 2013 · 106 KING ST E
Show 11 older records
- Building permit13 167674Permit Issued
Proposal for exterior buried storm plus one catch basin (see also 09-197871 BLD)
May 16, 2013 · 65 CHURCH ST - Building permit12 257580Closed
Proposal to install 1 temp cert tent at The Cathedral Church of St James Parish Hall. 10'x40'. Cert # 11 166997. Oct 9-Oct11/12.
Oct 11, 2012 · 65 CHURCH ST - Building permit12 170587Revision Issued
Revise door swing.
Jun 29, 2012 · 106 KING ST E - Building permit09 197871Application On Hold
FS - Sprinkler Shop Drawing - Proposal to construct three-storey addition with one basement level below (1400m2), and interior alterations (2500m2) to existing parish hall which contains ancillary uses "Cathedral Church of St. James Parish Hall".Also see site plan approval application 09-133350, zoning review application 09-140023, and partial demolition permit 09-197912.
Aug 13, 2010 · 65 CHURCH ST - Building permit09 197912Closed
Proposal for partial one-storey demolition to south-east corner of existing parish hall "The Cathedral Church of St James Parish Hall" (418m2). Also see related building permit 09-197871 BLD.
Mar 26, 2010 · 65 CHURCH ST - Zoning review09 140023 PSPClosedMay 21, 2009 · 65 CHURCH ST
- Development application09 133350 STE 28 SAClosed
The purpose of the application is to facilitate the redevelopment of the existing parish hall to a 3-storey, 4,000 square metre (44,000 square feet) development comprised of approximately 2,045 square metre (22,000 square feet) of renovations to the existing heritage structure, plus approximately 2,045 square metre (22,000 square feet) of contemporary building including 5 residences, offices and a variety of facilities to serve the Rector, visitors to the Cathedral and the community. The proposal includes 31 public parking spaces and 5 bicycle parking spaces.
May 4, 2009 · 106 KING ST E - Building permit08 168640Closed
Interior alterations to all levels BSMT to 3rd floor inclusive to existing Offices for Anglican Diocese Head office.
Jun 16, 2008 · 135 ADELAIDE ST E - Building permit05 110980Closed
Install Fire Suppression System in archive room in basement Note: Applicant will send key plan
Mar 2, 2005 · 106 KING ST E - Building permit04 139697Closed
Erect temporary tent 40' x 100' x 21'; Set up on June 5/04 & take down June 6/04.
Jun 1, 2004 · 106 KING ST E - Building permit00 120815Closed - Dormant
EMERGENCY DRAIN REPAIR BY REMOVING TRAP AND INSTALLING CLEANOUT. EDC
Jan 14, 2000 · 106 KING ST E
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 10,117 m²
- Frontage
- 80.3 m
- Depth
- 127.2 m
- Street
- King St E
- Corner lot
- Yes, also on Church St127.2 m along it
- Public lane
- None
- House footprint
- 1,594 m²roof up to 17.5 m
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 3.9 m and 14.5 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: ash, green (30 cm), ash, green (29 cm), ash, green (28 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 92%11 of 12 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 29
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
20 KING ST W · Jun 17, 2026 · 420 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 461 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 422 m away - Minor varianceApproved
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
89 CHURCH ST · Jan 15, 2025 · 196 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.
71 KING ST E · Dec 11, 2024 · 153 m away
Latest activity nearby
- Zoning review
Application On Hold
91 FRONT ST E · Nov 24, 2026 · 232 m away - Building permit
Revision No.1: New Fire Shutter Window
30 ADELAIDE ST E · Nov 20, 2026 · 240 m away - Building permit
Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.
19 TORONTO ST · Nov 16, 2026 · 168 m away - Building permit
Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.
124 CHURCH ST · Nov 16, 2026 · 236 m away - Building permit
Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.
47 COLBORNE ST · Nov 9, 2026 · 185 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 210 m away - Building permit
UNIT 301 INTERIOR NON-STRUCTURAL PARTITION DEMOLITION
47 COLBORNE ST · Nov 6, 2026 · 185 m away - Building permit
REV 01: Revision to permit to combine the two existing all gender washrooms into oneProposal for interior alterations for tenant fit out to existing unit. Unit 300
41 FRONT ST E · Nov 6, 2026 · 296 m away - Building permit
REVISION- 03Rev 02 - Scope clarified and simplified for future tenant (Back to Base project with plumbing rough-ins). Build out of future space by others (under separate future permit).REVISION 01:Interior alterations - back to base building - group A occupancy
71 FRONT ST E · Nov 5, 2026 · 226 m away - Building permit
Proposal for iInterior alterations to a group D office building - UNIT 400
47 COLBORNE ST · Nov 4, 2026 · 185 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- King Station6 min walk
- Nearest TTC stop
- King St East at Church St East Side1 min walk
- Nearest cycling route
- Adelaide St ECycle Track, 2 min walk
- Nearest traffic count
- 6,090 vehicles in 8 hKing St E / Church St, 70 m away, Jun 29, 2023
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 2 with cyclists
- Parks
- St. James Park1 min walk
- Toronto Sculpture Garden1 min walk
- Courthouse Square Park2 min walk
Schools within 1 km
- KEYSTONE INTERNATIONAL SCHOOLS Private 3 min walk
- VICTORIA STREET LINC English Public 5 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 5 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 7 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.