HousePrecheckCheck an address

1051 Progress AveToronto · zoning, lot size and permit records

≈ 105.2 × 159.0 m10,116 m²on Rosebank Drcorner, also on Progress Ave

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
N50 m
≈ 105.2 m frontage≈ 159.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • By-law investigation26 251314 ELS 00 IRClosed

      Election Signs

      Oct 7, 2026 · 1051 PROGRESS AVE

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    10,116 m²
    Frontage
    105.2 mestimated, irregular lot
    Depth
    159 mestimated, irregular lot
    Street
    Rosebank Dr
    Corner lot
    Yes, also on Progress Ave159 m along it
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: oak, english pyramidal (30 cm), oak, english pyramidal (25 cm), oak, english pyramidal (25 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a one-storey rear addition to the existing dwelling and the removal of the existing rear deck.

      15 RAYWARD CRT · Nov 4, 2026 · 378 m away
    • Minor varianceApproved

      To permit a vehicle depot use on the subject property, whereas the By-law prohibits a Vehicle Depot within 70m of a residential zone.

      415 MILNER AVE · Aug 23, 2023 · 318 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to permit the already constructed 105 stacked townhouse units in phase 1 site, municipally known as 80 Orchid Place Drive, 90 Orchid Place and 1070 Progress Avenue.

      1088 PROGRESS AVE · Sep 7, 2017 · 185 m away
    • Minor varianceRefused

      This application is for variances for a proposed residential development with four 3-storey stacked townhouse buildings and three 6-storey apartment buildings, connected by one level of underground parking on vacant land on the east side of Markham Road, between Sheppard Avenue E. and Orchid Place Drive. The proposed development would include a range of unit sizes, including family-sized units. This proposed development is also subject to Site Plan Control by the City of Toronto (File No. 16 153771 ESC 42 SA).

      5131 SHEPPARD AVE E · Mar 16, 2017 · 308 m away
    • Minor varianceApproved

      The applicant is proposing to develop the land for mixed use purposes to include two 16 storey condominium apartment buildings, a row of townhouses and a 4 storey commercial building, all over a 3 storey level underground garage. In April 2007, the Committee of Adjustment approved a variance to exclude the parking structure and the mechanical penthouse/utility room from being included in the height calculation for the two 16-storey apartment buildings. The same variance is needed to exclude the underground garage and the rooftop stair enclosures and architectural element in the calculation of height for the 4-storey commercial building. There are also other variances needed for gross floor area, setbacks for the townhouses, and the parking calculations.

      18 ROSEBANK DR · Jul 25, 2007 · 275 m away

    Latest activity nearby

    • Building permit

      Project proposal for additional parking (75 parking spaces) in northeast corner of Cynthia Lai Park.

      5183 SHEPPARD AVE E · Apr 21, 2026 · 178 m away
    • Zoning review

      Closed

      8 ROSEBANK DR · Jan 26, 2026 · 271 m away
    • Zoning review

      Application On Hold

      5183 SHEPPARD AVE E · Oct 6, 2025 · 178 m away
    • Building permit

      Proposal to disconnect and cap existing FDC. Supply and install new FDC

      100 BURROWS HALL BLVD · Sep 10, 2025 · 161 m away
    • Building permit

      Proposal to disconnect and cap existing FDC. Supply and install new FDC

      100 BURROWS HALL BLVD · Jun 3, 2025 · 161 m away
    • Zoning review

      Closed

      1088 PROGRESS AVE · May 26, 2025 · 185 m away
    • Building permit

      Providing a walkout stair to the basement on the rear side of the building. No changes in first floor and second floor

      22 ROSEBANK DR · Apr 4, 2024 · 251 m away
    • Zoning review

      Closed

      47 SUNBURST SQ · Dec 13, 2023 · 247 m away
    • Building permit

      Proposed isolated repairs to underground garage slabs/column bases.

      150 BURROWS HALL BLVD · Jun 2, 2022 · 295 m away
    • Building permit

      Fire alarm control panel and replacement and elevator modernization

      90 BURROWS HALL BLVD · Feb 22, 2021 · 108 m away

    Neighbourhood: Malvern East

    About the area around the lot, not the lot itself.

    Nearest station
    McCowan Rt Station41 min walk
    Nearest TTC stop
    Progress Ave at Rosebank Dr North Side1 min walk
    Nearest traffic count
    11,590 vehicles in 14 hProgress Ave / Orchid Place Dr, 90 m away, Jun 23, 2026
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Cynthia Lai Park1 min walk
    Burrows Hall Park6 min walk
    Pinetree Park8 min walk

    Schools within 1 km

    • BURROWS HALL JR PUBLIC SCHOOL English Public 6 min walk
    • VEDIC ROOTS Private 7 min walk
    • MALVERN JR PUBLIC SCHOOL English Public 9 min walk
    • ST BARNABAS CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
    • ISLAMIC FOUNDATION SCHOOL Private 14 min walk
    • GIBRALTAR LEADERSHIP ACADEMY SCHOOL Private 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMalvern EastMedian neighbourhood
    Median household income (2020)$85,000$84,500
    Households that own their home70%54%
    Population (2021)26,09516,813
    Homes built in 1960 or before4%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMalvern EastCity median
    Assault505.9636.3
    Robbery80.869.5
    Auto theft224.8192.6
    Theft over $5,00035.146.1
    Break and enter80.8172.8
    Theft from vehicles186.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.