HousePrecheckCheck an address

1050 The QueenswayToronto · zoning, lot size and permit records

Also 1060 The Queensway, 1062 The Queensway, 1064 The Queensway, 1066 The Queensway, 1068 The Queensway

40.8 × 68.9 m2,691 m²on Ramsbury Rdcorner, also on The Queenswaybacks onto Ln N The Queensway W Islington

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 21 250433 (repair fire damage to units 605, 606, 607 and 704, 705, 706, 2021, status Inspection); 08 206210 (HVAC - Interior alterations to Units # 2 & 3, to create Mortgage Investment Office, to..., 2008, status Inspection); 04 199478 (PHASE II - Proposed new 10 storey residential condominium development (ground floor mix..., 2006, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 93% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
40.8 m frontage68.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2006

    Needs a closer look

    Still open in the City's records: 21 250433 (repair fire damage to units 605, 606, 607 and 704, 705, 706, 2021, status Inspection); 08 206210 (HVAC - Interior alterations to Units # 2 & 3, to create Mortgage Investment Office, to..., 2008, status Inspection); 04 199478 (PHASE II - Proposed new 10 storey residential condominium development (ground floor mix..., 2006, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 109692 PRS 00 IR (Property Standards, 2026); 25 222950 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 109692 PRS 00 IRClosed

    Property Standards

    Jan 27, 2026 · 1050 THE QUEENSWAY
  • By-law investigation25 222950 ZON 00 IRClosed

    Zoning

    Sep 9, 2025 · 1050 THE QUEENSWAY
  • Building permit21 250433Inspection

    repair fire damage to units 605, 606, 607 and 704, 705, 706.

    Dec 23, 2021 · 1050 THE QUEENSWAY
  • Building permit15 233352Closed

    Install a 3" backflow prevention device.

    Oct 23, 2015 · 1050 THE QUEENSWAY
  • Building permit14 122347Closed

    Proposal for interior alterations to vacant commercial unit on the ground floor for new fitness studio - "Bodhi Tree Yoga Studio". Convenience address is 1066-1068 The Queensway

    Apr 11, 2014 · 1066 THE QUEENSWAY
  • Zoning review13 125280 LPRClosed
    Feb 26, 2013 · 1060 THE QUEENSWAY
  • Building permit08 196502Closed

    Plumbing - Interior alterations to units 4 & 5 for a dental office within vacant space and new demising wall between units 3 & 4

    Dec 18, 2008 · 1050 THE QUEENSWAY
  • Building permit08 201323Closed

    HVAC - Phase 2 - Interior alterations - New demising wall, and partition walls.

    Nov 20, 2008 · 1050 THE QUEENSWAY
Show 15 older records
  • Building permit08 206210Inspection

    HVAC - Interior alterations to Units # 2 & 3, to create Mortgage Investment Office, to ground floor of Commercial/Residential Apartment Condominium Building.

    Nov 7, 2008 · 1050 THE QUEENSWAY
  • Building permit08 188410Closed

    Interior alterations for a new restaurant-cafe within vacant space - "Spin Desserts Cafe"

    Aug 15, 2008 · 1050 THE QUEENSWAY
  • Zoning review08 183893 ZPRClosed
    Jul 18, 2008 · 1050 THE QUEENSWAY
  • Zoning review08 150977 ZALCancelled
    Apr 24, 2008 · 1050 THE QUEENSWAY
  • Building permit08 112335Closed

    Proposed interior alterations to an existing vacant commercial unit for a nail salon **MOD Nail**.

    Mar 25, 2008 · 1050 THE QUEENSWAY
  • Building permit07 242162Closed

    Installation of two new maglocks at the ground-floor lobby of phase one and phase two buildings.

    Jul 16, 2007 · 1050 THE QUEENSWAY
  • Building permit04 199478Inspectionnew building

    PHASE II - Proposed new 10 storey residential condominium development (ground floor mixed use, residential & commercial, 9 floors residential)

    Mar 30, 2006 · 1050 THE QUEENSWAY
  • Building permit05 203789Closed

    Conditional application related to Part Permit for framing Phase 2 ( see 04-199478 STR 00 PP )

    Nov 25, 2005 · 1050 THE QUEENSWAY
  • Building permit05 203782Cancelled

    Conditional application related to Part Permit for framing phase one (see 04-171406 STR 00 PP)

    Nov 25, 2005 · 1050 THE QUEENSWAY
  • Building permit04 171406Closed - Dormant

    Part Permit - FOUNDATION - PHASE I - Proposed new 10 storey residential condominium development (ground floor mixed use, residential & commercial, 9 floors residential) c/w 2 U/G parking garage levels - New Building

    Jul 18, 2005 · 1050 THE QUEENSWAY
  • Building permit05 101023Closeddemolition

    Proposed demolition of exist. retail food store

    Mar 21, 2005 · 1050 THE QUEENSWAY
  • Zoning review04 183802 000Closed
    Oct 22, 2004 · 1050 THE QUEENSWAY
  • Building permit03 192043Closed

    Interior alterations to existing building to create temporary sales centre (for future resd. condominiums)

    Jun 29, 2004 · 1050 THE QUEENSWAY
  • Zoning review01 155357 000Closed
    Jul 5, 2001 · 1050 THE QUEENSWAY
  • Zoning review01 134271 LTOClosed
    May 7, 2001 · 1050 THE QUEENSWAY

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,691 m²
Frontage
40.8 m
Depth
68.9 m
Street
Ramsbury Rd
Corner lot
Yes, also on The Queensway68.9 m along it
Public lane
Ln N The Queensway W Islington, 64.1 m along it
Max height
—
Max lot coverage
—
  • 10 City trees in front of this lot. The City's street tree inventory lists 10 trees at this address: maple, red (34 cm), maple, red (29 cm), maple, red (23 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%12 of 13 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
1
Development applications
8

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the existing temporary sales office.

    1045 THE QUEENSWAY · Oct 8, 2026 · 123 m away
  • Minor varianceApproved

    To construct a new twelve-storey mixed-use building that will consist of residential units, amenity space and retail uses at grade and residential units above.

    1156 THE QUEENSWAY · Apr 23, 2026 · 291 m away
  • Minor varianceApproved

    To construct a one-storey rear addition, a one-storey partial west side addition, and to permit interior alterations to the existing dwelling to accommodate an additional dwelling unit. A total of 2 dwelling units will be provided.

    75 NORDIN AVE · Apr 23, 2026 · 302 m away
  • Minor varianceApproved

    To alter the development standards as outlined in By-law 1286-2023 to accommodate a 33-storey residential building.

    10 ZORRA ST · Dec 4, 2025 · 464 m away
  • Minor varianceApproved

    To construct a second storey addition above the existing detached dwelling.

    31 NORDIN AVE · Dec 4, 2025 · 381 m away

Latest activity nearby

  • Building permit

    Proposal to repair fire separation walls at corridors damaged by water from level 5 to 8

    1007 THE QUEENSWAY · Nov 2, 2026 · 151 m away
  • Building permitsecondary suite

    Proposal for second suite in basement.

    20 WOOLGAR AVE · Oct 26, 2026 · 269 m away
  • Building permit

    Proposal for interior alterations for a dental office

    1011 THE QUEENSWAY · Oct 22, 2026 · 129 m away
  • Minor varianceApproved

    To legalize and to maintain the existing temporary sales office.

    1045 THE QUEENSWAY · Oct 8, 2026 · 123 m away
  • Building permitsecondary suite

    Basement Suite

    20 WOOLGAR AVE · Oct 7, 2026 · 269 m away
  • Building permit

    Proposed interior fit-up to convert existing vacant unit to a dental clinic at (1039 &1041THE QUEENSWAY)

    1037 THE QUEENSWAY · Sep 22, 2026 · 73 m away
  • Zoning review

    Closed

    972 THE QUEENSWAY · Sep 16, 2026 · 278 m away
  • Building permit

    Proposal for the demolition of the existing accessory building and replacement of the area with soft landscaping

    8 CROWN CRT · Sep 9, 2026 · 164 m away
  • Zoning review

    Closed

    1116 A THE QUEENSWAY · Jul 22, 2026 · 127 m away
  • Zoning review

    Closed

    1007 THE QUEENSWAY · Jul 3, 2026 · 151 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station27 min walk
Nearest TTC stop
The Queensway at St Lawrence Ave2 min walk
Nearest traffic count
17,818 vehicles in 8 hThe Queensway / Dorchester Ave, 70 m away, Nov 21, 2005
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Market Garden Mews6 min walk
Senator Marian Maloney Park6 min walk
Queensland Park7 min walk

Schools within 1 km

  • HOLY ANGELS CATHOLIC ELEMENTARY English Separate 9 min walk
  • CASTLEBAR JR SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.