HousePrecheckCheck an address

1050 Military TrlToronto · zoning, lot size and permit records

Also 3290 Ellesmere Rd, 3300 Ellesmere Rd, 40 Pan Am Dr

≈ 482.9 × 293.8 m79,425 m²on Military Trl

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 191282 (4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING C..., 2026); 26 188744 (Install a new dishwasher condensate exhaust system and associated makeup air, including..., 2026); 26 184888 (1 GROUND SIGN**UNIVERITY OF TORONTO GARRON HEATH SCIENCES COMPLEX**, 2026); and 5 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 11 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
N50 m
≈ 482.9 m frontage≈ 293.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Ravine and natural feature protection (12% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (12% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Zoning): 26 137590 ZON 00 IR (Zoning, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 191282 (4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING C..., 2026); 26 188744 (Install a new dishwasher condensate exhaust system and associated makeup air, including..., 2026); 26 184888 (1 GROUND SIGN**UNIVERITY OF TORONTO GARRON HEATH SCIENCES COMPLEX**, 2026); and 5 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. B0030/23SC (This application is for consent to permit a lease for a period in excess of 21 years. T..., 2023); A0039/21SC (The purpose of this minor variance application is to obtain a temporary reduction in th..., 2021).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 11 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

58 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 264659 LPRNot Started
    Nov 3, 2026 · 40 PAN AM DR
  • Zoning review26 261524 ZPRNot Started
    Oct 28, 2026 · 1050 MILITARY TRL
  • Building permit26 229522Cancelled

    2 ground signs.***UNIVERSITY OF TORONTO***

    Sep 1, 2026 · 1050 MILITARY TRL
  • Building permit26 191282Permit Issued

    4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING COMMONS -- BOOKSTORE -- UTSC RETAIL AND PARKING COMMONS **

    Jul 29, 2026 · 1050 MILITARY TRL
  • Building permit26 188744Permit Issued

    Install a new dishwasher condensate exhaust system and associated makeup air, including electric heater.

    Jul 29, 2026 · 3300 ELLESMERE RD
  • Building permit26 184888Permit Issued

    1 GROUND SIGN**UNIVERITY OF TORONTO GARRON HEATH SCIENCES COMPLEX**

    Jun 19, 2026 · 1050 MILITARY TRL
  • Building permit26 165359Permit Issued

    Proposal for interior alterations to a newly constructed building. Work is limited to ground floor rooms 187,193 & installation of new interior finishes, millwork, equipment & lighting. No structural modifications are proposed.

    Jun 5, 2026 · 1050 MILITARY TRL
  • Zoning review26 148611 LTOClosed
    Apr 23, 2026 · 1050 MILITARY TRL
Show 50 older records
  • Building permit21 138093Closednew building

    REV 02: Revision to finish mercantile space on the ground floor.Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Apr 16, 2026 · 1050 MILITARY TRL
  • By-law investigation26 137590 ZON 00 IRClosed

    Zoning

    Apr 1, 2026 · 1050 MILITARY TRL
  • Building permit26 117844Permit Issued

    Proposal for interior modifications of entrance/exit through main floor severy at Harmony Commons Residence Building.

    Feb 19, 2026 · 3300 ELLESMERE RD
  • Building permit25 186883Cancelled

    1 wall sign**CAFE DEPOT**

    Jul 2, 2025 · 1050 MILITARY TRL
  • Building permit25 149349Cancelled

    HVAC - This permit application pertains solely to the alteration of an existing photovoltaic (PV) canopy system located on the roof of a 5-storey, open-air, precast concrete parking structure. The scope of work is limited to the infill of two sections within the current PV canopy array and minor drainage and electrical revisions to support the PV panel infill . No modifications to the structure are proposed.

    Apr 25, 2025 · 1050 MILITARY TRL
  • Building permit25 116196Cancelled

    Proposed alternative solution to protect the gas line serving the emergency generator withCL4FIRE Red Fire Protection Thermal Insulation wrap in lieu of locating the gas pipe in a fire enclosure or a service room.

    Feb 12, 2025 · 1050 MILITARY TRL
  • Building permit24 246103Approved

    The Ontario Building Code (OBC) requires that a standpipe system be installed in buildings exceeding three storeys or 14 meters in height. Specifically, for buildings over 4000 m2 area or 25 meter height, both 38 mm and 65 mm diameter hose connections must be provided on each floor. These systems must comply with NFPA 14 standards. Hose stations, equipped with fire hoses, nozzles, and extinguishers, must be located within 5 meters of every exit, ensuring full coverage so that every part of the building can be reached by a hose stream within 33 meters. The proposed alternative solution suggests a standpipe system will be provided in conformance with the requirements in the NBC 2020 and OBC 2024. For the subject building, hose stations will not be provided in the floor area; instead, 64 mm hose connections will be located in the exits. As specified in OBC 2024, Sentence 3.2.5.10(2), hose connections are not required within a floor area, and standpipe connections on the first storey will be installed in exit stairs that provide access to the floor area. The solution will ensure that to undertake firefighting activities, responding fire fighters carry their own 65-mm-diameter hoses and equipment when attending to a fire. The fire hoses carried by the firefighters are maintained and tested on a regular basis to ensure the hoses are functioning and available when required. The larger 65 mm hose will provide more coverage and flow rate, which in turn will enhance the firefighting capability and facilitate emergency response.  Thus, the omission of the 38 mm diameter fire hose hose, locating the 64 mm fire hose valve connections in exits, and excluding the additional hose connections in floor areas in accordance with the OBC 2024 and NBC 2020 is considered to meet the intent of the Objectives and Functional Statements and the required level of performance expected by the OBC.

    Dec 3, 2024 · 1050 MILITARY TRL
  • Building permit24 155923Closed

    2 WALL SIGNS + GROUND SIGN**SAM IBRAHIM BUILDING**

    Jun 4, 2024 · 1050 MILITARY TRL
  • Building permit23 221612Superseded

    Part Permit - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Feb 2, 2024 · 1050 MILITARY TRL
  • Building permit20 230161Closednew building

    REV01: Proposed revision as per drawings - for updated space on Level 2Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Dec 19, 2023 · 1050 MILITARY TRL
  • Building permit23 225887Approved

    Proposal for Alternative Solution for StandPipeSTRUCTURE ADDRESS - 840 MILITARY TRAIL

    Nov 14, 2023 · 1050 MILITARY TRL
  • Zoning review23 206998 LPRClosed
    Sep 25, 2023 · 3300 ELLESMERE RD
  • Consent (lot split)B0030/23SCApproved

    This application is for consent to permit a lease for a period in excess of 21 years. This application is in support of a 750-bed Student Residence at the University of Toronto Scarborough Campus. Any lease that has the effect of granting the use of or right in land for a period exceeding 21 years requires the consent of the Committee of Adjustment.

    Sep 20, 2023 · 3300 ELLESMERE RD
  • Building permit20 162564Closednew building

    REV02: Proposed revision to eliminate the windscreen along second floor green roof parapetRevision 01 - This revision converts areas previously identified as shell space to finished areas.(Level one and three) Proposal to construct a new 9 storey above grade student residence with partial basement for University of Toronto students.

    Sep 13, 2023 · 3300 ELLESMERE RD
  • Building permit23 191914Closed

    Application for a permit to erect and display one non-illuminated, double-sided ground sign.*****UNIVERSITY OF TORONTO*****

    Aug 23, 2023 · 3300 ELLESMERE RD
  • Zoning review23 172944 PSPClosed
    Aug 1, 2023 · 1050 MILITARY TRL
  • Building permit23 180272Cancelled

    Application for a permit to erect and display one non-illuminated, double-sided ground sign.*****UNIVERSITY OF TORONTO*****

    Jul 26, 2023 · 3300 ELLESMERE RD
  • Development application23 172944 ESC 25 SANOAC Issued

    Site Plan Approval for the Scarborough Academy of Medicine and Integrated Health (SAMIH), a 6-storey, 15,177m2 institutional building, at the University of Toronto Scarborough Campus (UTSC).

    Jul 11, 2023 · 1050 MILITARY TRL · City file
  • Development application23 172933 ESC 25 SAClosed

    Site Plan Approval for a temporary surface parking lot.

    Jul 11, 2023 · 1050 MILITARY TRL · City file
  • Zoning review23 140607 PRZClosed
    May 5, 2023 · 1050 MILITARY TRL
  • Development application23 140607 ESC 25 OZClosed

    Zoning By-law Amendment for a proposed 7,422 m2 temporary surface parking lot.

    May 2, 2023 · 1050 MILITARY TRL · City file
  • Development application22 152202 ESC 25 OZClosed

    OPA and Rezoning for proposed 6-storey, 15, 117m2 institutional building, known as the Scarborough Academy of Medicine and Integrated Health ("SAMIH")

    May 26, 2022 · 1050 MILITARY TRL · City file
  • Zoning review21 125115 PSPClosed
    Mar 31, 2022 · 1050 MILITARY TRL
  • Zoning review21 125114 PRZClosed
    Mar 31, 2022 · 1050 MILITARY TRL
  • Building permit21 246975Approved

    Minimum Separation Distances between Truck Dock and Air Intake Opening

    Dec 9, 2021 · 3300 ELLESMERE RD
  • Building permit21 170089Cancelled

    Proposed alternative solution to Fire Damper and Smoke damper waiver

    Jun 14, 2021 · 3300 ELLESMERE RD
  • Building permit21 169950Refused

    Alternative solution for OBC Fire Damper and Smoke Damper Waiver - For the hvac permit 20 162564

    Jun 14, 2021 · 3300 ELLESMERE RD
  • Building permit21 147605Approved

    This document aims to clarify that the use of Mass Timber is permitted by the S413 and can be designed and built to meet the overarching principles and performance objectives outlined in OBC and the CSA S413.

    Apr 29, 2021 · 1050 MILITARY TRL
  • Building permit21 147589Approved

    Compensatory measures are proposed for the alternative solutions in order to achieve the minimum level of the performance set out by the OBC acceptable solutions.

    Apr 29, 2021 · 1050 MILITARY TRL
  • Zoning review20 145777 PSPClosed
    Apr 12, 2021 · 1050 MILITARY TRL
  • Minor varianceA0039/21SCApproved

    The purpose of this minor variance application is to obtain a temporary reduction in the number of required parking spaces for the University of Toronto, Scarborough Campus (UTSC).

    Mar 11, 2021 · 1050 MILITARY TRL
  • Development application21 125114 ESC 25 OZClosed

    Development comprising of a 5-storey parking structure with a retail use and cafe on the ground floor.

    Mar 10, 2021 · 1050 MILITARY TRL · City file
  • Development application21 125111 ESC 25 OZClosed

    Zoning bylaw amendment to lift holding provision concurrently with zoning bylaw amendment application 21 125114 ESC 25 OZ to facilitate a new building containing a parking structure, cafe and bookstore.

    Mar 10, 2021 · 1050 MILITARY TRL · City file
  • Development application21 125115 ESC 25 SANOAC Issued

    Development comprising of a 5-storey parking structure with a retail use and cafe on the ground floor.

    Mar 10, 2021 · 40 PAN AM DR · City file
  • Building permit21 118927Approved

    Proposal for an alternative solution to provide an opening between Level 2 and 3 in lieu of terminating at vertical fire separations.

    Feb 22, 2021 · 1050 MILITARY TRL
  • Zoning review20 145765 PRZClosed
    Nov 18, 2020 · 1050 MILITARY TRL
  • Building permit20 189436Approved

    Proposal for alternative solution for fire hose cabinet

    Sep 3, 2020 · 3300 ELLESMERE RD
  • Zoning review19 193396 PSPClosed
    Aug 26, 2020 · 3300 ELLESMERE RD
  • Building permit20 185646Cancelled

    Alternative solution relative to fire protection and life safety, as they relate to the University of Toronto Scarborough Campus Student Residence.The purpose of this alternative solution is to address the OBC requirements to install fire hose cabinets within the floor areas that are located not more than 5 m from every required exit serving this project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas, rather, 65mm hose connection will be installed within the exit stair shafts as required for this project in accordance with the 2015 Nation Building Code Canada (NBC) sentence 3.2.5.10 (1) and NFPA 14-2010 "Installation of standpipe and hose systems"

    Aug 26, 2020 · 3300 ELLESMERE RD
  • Development application20 145777 ESC 25 SAClosed

    Proposed 5-storey institutional building, known as the Instructional Centre Phase 2 at the University of Toronto Scarborough campus. The proposed building will be located on the north corner of Military Trail and Pan Am Drive on the south portion of the existing Parking Lot H.

    May 15, 2020 · 1050 MILITARY TRL · City file
  • Development application20 145765 ESC 25 OZClosed

    Application to lift the Holding Symbol "H" for a proposed 5-storey institutional building, known as the Instructional Centre Phase 2 at the University of Toronto Scarborough campus. The proposed building will be located on the north corner of Military Trail and Pan Am Drive on the south portion of the existing Parking Lot H.

    May 15, 2020 · 1050 MILITARY TRL · City file
  • Development application19 193396 ESC 25 SAClosed

    Proposed Student Residence at the University of Toronto Scarborough. The proposed building includes 750 beds and ancillary student uses. The overall building height is 32.85 metres (9 storeys) plus mechanical penthouse. 4 short term accessible vehicular visitor parking spaces are proposed at grade. 90 indoor bicycle parking spaces and 30 outdoor bicycle parking spaces are proposed on the ground floor level. Loading spaces and access to garbage staging areas are proposed along the east facade of the building. Driveway access to the site is from Ellesmere Road at the east end of the site.

    Jul 22, 2019 · 3300 ELLESMERE RD · City file
  • Zoning review17 239225 PRZClosed
    Oct 2, 2017 · 3300 ELLESMERE RD
  • Development application17 239225 ESC 44 OZClosed

    Proposed Zoning By-law Amendment application for a student residence building at the University of Toronto Scarborough. The application is to allow for a 9-storey (32.85 m) building with a total Gross Floor Area (GFA) of 23,660 square metres. The proposal includes 312 two-bedroom dormitory suites and one residential unit (approx 750 beds in total) along with 120 bicycle parking spaces (90 long term and 30 short term), 4 vehicle parking spaces and 2 loading spaces.

    Sep 26, 2017 · 1050 MILITARY TRL · City file
  • Development application16 209876 ESC 44 OZUnder Review

    Official Plan Amendment application to adopt a Secondary Plan for the University of Toronto Scarborough Campus.

    Aug 19, 2016 · 3290 ELLESMERE RD · City file
  • Building permit15 126159Closed

    HVAC - Proposal to erect temporary interior partitions for Camera Room. PAN AM Games. May 15 - Sept 15/2015.

    Apr 2, 2015 · 3290 ELLESMERE RD
  • Zoning review15 128776 PSPClosed
    Mar 20, 2015 · 3290 ELLESMERE RD
  • Development application15 128776 ESC 44 SAClosed

    Temporary installation for Modern Pentathalon event for the 2015 Pan Am Games. The proposal includes an asphalt track, temporary fencing, tents with a total area of 600 m2, trailers, seating bleachers for 944 seats and shipping containers. All components are intended to be removed by September 30, 2015.

    Mar 17, 2015 · 3290 ELLESMERE RD
  • Development application14 131315 ESC 44 OZClosed

    The application proposes to amend the Zoning By-law to permit reduced vehicular parking rates requirement for institutional uses, establish vehicular parking rate requirements for student residences and establish bicycle parking standards for the University of Toronto Scarborough Campus.

    Mar 20, 2014 · 1050 MILITARY TRL
  • Development application11 175883 ESC 44 SAClosed

    Proposed Aquatic Facility for the 2015 Para Pan/Pan Am Games. Revised submission: The facility will be co-owned by the City of Toronto and the University of Toronto. This 28,930 sq. m. (311,410 sq. ft.) facility will house two 50 metre swimming pools, a dive tank, a field house with gymnasium/courts, and a variety of recreational, office and ancillary retail and food service uses. A total of 434 parking spaces are proposed on-site.

    Apr 15, 2011 · 3290 ELLESMERE RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
79,425 m²
Frontage
482.9 mestimated, irregular lot
Depth
293.8 mestimated, irregular lot
Street
Military Trl
Corner lot
No
Public lane
None
House footprint
2,350 m²
Back yard
118.1 mhouse to rear lot line
Side yards
9.5 m and 382.8 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    14

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new two-storey detached dwelling with a front porch, rear basement walkout, rear ground floor deck and rear second floor balcony. The existing two-storey detached dwelling and detached garage will be demolished. Also, to construct a new oversized driveway on the east side of the lot. There will be a total of two dwelling units on the lot. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on April 9, 2025.

      3325 ELLESMERE RD · Nov 5, 2025 · 318 m away
    • Minor varianceApproved

      To construct a new two storey detached dwelling with an attached garage.

      203 CONLINS RD · Apr 4, 2023 · 483 m away
    • Minor varianceApproved

      The purpose of this minor variance application is to obtain a temporary reduction in the number of required parking spaces for the University of Toronto, Scarborough Campus (UTSC).

      1050 MILITARY TRL · Mar 11, 2021 · 141 m away
    • Minor varianceApproved

      To construct a new two-storey detached dwelling on Part 2 (194A).

      194 CONLINS RD · Feb 13, 2020 · 410 m away
    • Minor varianceApproved

      To construct a new two-storey detached dwelling on Part 1 (194B).

      194 CONLINS RD · Feb 13, 2020 · 410 m away

    Latest activity nearby

    • Zoning review

      Not Started

      40 PAN AM DR · Nov 3, 2026 · 219 m away
    • Zoning review

      Not Started

      1050 MILITARY TRL · Oct 28, 2026 · 141 m away
    • Zoning review

      Closed

      3307 ELLESMERE RD · Sep 25, 2026 · 261 m away
    • Building permit

      2 ground signs.***UNIVERSITY OF TORONTO***

      1050 MILITARY TRL · Sep 1, 2026 · 141 m away
    • Development application

      A Site Plan Application to facilitate an 11-storey mixed use building consisting of 166 rental dwelling units and 167 sqm of commercial use at grade. Proposed gross floor area is 18,162 sqm including 45 vehicular parking spaces, a type G loading space, and 135 bicycle parking spaces.

      3307 ELLESMERE RD · Aug 7, 2026 · 253 m away · City file
    • Development application

      Proposal of an 11-storey mixed use building consisting of 166 rental dwelling units and 167 sqm of commercial use at grade. Proposed gross floor area is 18,162 sqm including 45 vehicular parking spaces, a type G loading space, and 135 bicycle parking spaces.

      3307 ELLESMERE RD · Aug 7, 2026 · 253 m away · City file
    • Zoning review

      Notice Sent

      3307 ELLESMERE RD · Jul 31, 2026 · 261 m away
    • Building permit

      4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING COMMONS -- BOOKSTORE -- UTSC RETAIL AND PARKING COMMONS **

      1050 MILITARY TRL · Jul 29, 2026 · 141 m away
    • Building permit

      Install a new dishwasher condensate exhaust system and associated makeup air, including electric heater.

      3300 ELLESMERE RD · Jul 29, 2026 · 205 m away
    • Building permit

      1 GROUND SIGN**UNIVERITY OF TORONTO GARRON HEATH SCIENCES COMPLEX**

      1050 MILITARY TRL · Jun 19, 2026 · 141 m away

    Neighbourhood: Highland Creek

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Military Trail at Pan Am Dr2 min walk
    Nearest cycling route
    Conlins RdBike Lane - Buffered, 7 min walk
    Nearest traffic count
    2,707 vehicles in 8 hMilitary Trl / Pan Am Dr, 140 m away, Dec 17, 2022
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Morningside Park9 min walk
    Highland Creek Community Park11 min walk
    Ellesmere Ravine Park12 min walk

    Schools within 1 km

    • CENTENNIAL COLLEGE SCHOOL - MORNINGSIDE CAMPUS College 7 min walk
    • ROUGE VALLEY EDUCATION CENTRE Private 7 min walk
    • MILITARY TRAIL PUBLIC SCHOOL English Public 11 min walk
    • ST JOHN PAUL II CATHOLIC SECONDARY SCHOOL English Separate 14 min walk
    • MORRISH PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHighland CreekMedian neighbourhood
    Median household income (2020)$120,000$84,500
    Households that own their home86%54%
    Population (2021)12,62516,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHighland CreekCity median
    Assault575.6636.3
    Robbery44.369.5
    Homicide7.45.3
    Shootings7.410.5
    Auto theft243.5192.6
    Theft over $5,00095.946.1
    Break and enter118.1172.8
    Theft from vehicles214188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.