HousePrecheckCheck an address

105 Wingold AveToronto · zoning, lot size and permit records

≈ 92.8 × 124.0 m6,920 m²on Wingold Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 213689 (Proposal to convert an existing vacant unit into a showroom, manufacture and warehouse, 2026); 26 146984 (REVISION - REVISED CHANGE ROOM AND STAFF WASHROOM LOCATIONSINTERIOR ALTERATIONS / FIT-O..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N50 m
≈ 92.8 m frontage≈ 124.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 213689 (Proposal to convert an existing vacant unit into a showroom, manufacture and warehouse, 2026); 26 146984 (REVISION - REVISED CHANGE ROOM AND STAFF WASHROOM LOCATIONSINTERIOR ALTERATIONS / FIT-O..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 213689Inspection

    Proposal to convert an existing vacant unit into a showroom, manufacture and warehouse.

    Oct 21, 2026 · 105 WINGOLD AVE
  • Building permit26 146984Revision Issued

    REVISION - REVISED CHANGE ROOM AND STAFF WASHROOM LOCATIONSINTERIOR ALTERATIONS / FIT-OUT OF EXISTING VACANT UNIT 1 FOR CHOCOLATE FACTORY WITH ACCESSORY RESTAURANT.

    Oct 6, 2026 · 105 WINGOLD AVE
  • Building permit25 262426Closed

    PROPOSE INTERIOR ALTERATIONS TO DEMISE UNITS

    Dec 9, 2025 · 105 WINGOLD AVE
  • Zoning review25 253827 ZZUCancelled
    Nov 14, 2025 · 105 WINGOLD AVE
  • Building permit16 121156Closed

    Install a two inch backflow preventor at water main

    Mar 18, 2016 · 105 WINGOLD AVE
  • Zoning review11 203290 ZZCCancelled
    May 26, 2011 · 105 WINGOLD AVE
  • Building permit10 127827Closed

    Install backflow device

    Mar 16, 2010 · 105 WINGOLD AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,920 m²
Frontage
92.8 mestimated, irregular lot
Depth
124 mestimated, irregular lot
Street
Wingold Ave
Corner lot
No
Public lane
None
House footprint
3,519 m²roof up to 8.2 m
Back yard
24.1 mhouse to rear lot line
Side yards
7.9 m and 11.4 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm, accolade (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a three-storey detached houseplex (fourplex) with a two-storey garden suite in the rear yard.

    1223 GLENCAIRN AVE · Oct 15, 2026 · 440 m away
  • Minor varianceApproved

    To permit the lot frontage of the proposed residential lot. File Nos. B0008/26NY, A0133/26NY and A0134/26NY will be jointly considered.

    1197 GLENCAIRN AVE · Jul 23, 2026 · 415 m away
  • Minor varianceApproved

    To permit the lot frontage of the proposed residential lot. File Nos. B0008/26NY, A0133/26NY and A0134/26NY will be jointly considered.

    1197 GLENCAIRN AVE · Jul 23, 2026 · 415 m away
  • Minor varianceApproved

    To facilitate in the construction of a new five-storey commercial office building, and to permit the reduction of parking spaces provided. Cross-reference Site Plan Control Application 22 240925 NNY 08 SA.

    165 TYCOS DR · Nov 21, 2024 · 330 m away
  • Minor varianceApproved

    To construct a one-storey addition to the rear of the existing industrial building.

    115 RONALD AVE · Feb 15, 2024 · 202 m away

Latest activity nearby

  • Building permit

    FS - Sprinkler Shop Drawing - Proposed interior alterations for new Tenant (unit 2)

    117 TYCOS DR · Nov 18, 2026 · 241 m away
  • Zoning review

    Closed

    1272 CASTLEFIELD AVE · Nov 3, 2026 · 257 m away
  • Building permit

    Proposal to convert an existing vacant unit into a showroom, manufacture and warehouse.

    105 WINGOLD AVE · Oct 21, 2026 · 19 m away
  • Building permit

    REVISION - REVISED CHANGE ROOM AND STAFF WASHROOM LOCATIONSINTERIOR ALTERATIONS / FIT-OUT OF EXISTING VACANT UNIT 1 FOR CHOCOLATE FACTORY WITH ACCESSORY RESTAURANT.

    105 WINGOLD AVE · Oct 6, 2026 · 19 m away
  • Building permit

    Interior renovation of existing sales space (leasehold improvement):- Modify/remove existing partition walls,- Remove existing lavatory and toilet.- Construct new partition walls - Install new utility tub sink,- Provide power for tenant's parts-washer machine.

    1300 CASTLEFIELD AVE · Sep 28, 2026 · 217 m away
  • Building permit

    Proposed installation of one temporary tent, TENT CERT#25 137538Installation Date: September 15, 2026Removal Date: September 17, 2026

    125 TYCOS DR · Sep 11, 2026 · 214 m away
  • Building permit

    Installation of temporary tent - ONE- 20'x45' TENT CERT#25 135948 .Anchored with weights. Informal rest stop area for attendees of the Tycos Dr. Trade Day event, providing treat samples and water. Install is Sept 15th. Event is Sept 16th. Removal is Sept 17th, 2026

    125 TYCOS DR · Sep 8, 2026 · 214 m away
  • Building permit

    2 Wall Sign

    117 TYCOS DR · Aug 4, 2026 · 241 m away
  • Building permit

    Proposal for minor alteration in men's washroom - urinal replacement into a toilet stall

    825 CALEDONIA RD · Jul 15, 2026 · 197 m away
  • Building permit

    Proposal to install a backflow prevention device in an existing warehouse.

    119 RONALD AVE · Feb 23, 2026 · 182 m away

Neighbourhood: Yorkdale-Glen Park

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station18 min walk
Nearest TTC stop
Lansdowne Ave at Tycos Dr5 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 6 min walk
Nearest traffic count
1,846 vehicles in 8 hWingold Ave / Lansdowne Ave, 110 m away, Dec 14, 2009
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park5 min walk
Glen Park Parkette9 min walk
Dufferin Hill Park11 min walk

Schools within 1 km

  • REGINA MUNDI CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
  • JOYCE PUBLIC SCHOOL English Public 16 min walk
  • DANTE ALIGHIERI ACADEMY - CLOSED TIL 2026 English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYorkdale-Glen ParkMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home54%54%
Population (2021)16,62516,813
Homes built in 1960 or before27%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYorkdale-Glen ParkCity median
Assault1212.6636.3
Robbery146.869.5
Homicide4.75.3
Shootings28.410.5
Auto theft492.6192.6
Theft over $5,000274.746.1
Break and enter341.1172.8
Theft from vehicles360188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.