HousePrecheckCheck an address

105 Maitland StToronto · zoning, lot size and permit records

Also 113 Maitland St, 99 Maitland St

Residential · R (d1.0) (x801)41.7 × 56.6 m2,351 m²on Mutual Stcorner, also on Maitland Stbacks onto Alexander Pl

Not a home

National Ballet School - Maison Staines House & Salle Currie Hall

The City's school locations place National Ballet School - Maison Staines House & Salle Currie Hall on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelRecent records on this lot: 23 105690 (Proposal to repair and replace wood windows and storm doors for buildings C and D of "C..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 19 development applications open within 300 m, up to 63 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
41.7 m frontage56.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 105690 (Proposal to repair and replace wood windows and storm doors for buildings C and D of "C..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0185/04T (The National Ballet School is relocating its classrooms, ballet studios and administrat..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 19 development applications open within 300 m

    Good to know

    19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 63 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit23 105690Permit Issued

    Proposal to repair and replace wood windows and storm doors for buildings C and D of "Canada's National Ballet School"

    Feb 21, 2025 · 105 MAITLAND ST
  • Building permit22 125049Closed

    Proposal for localized structural repairs to the suspended courtyard of existing private school - National Ballet School, Currie Hall

    Apr 20, 2022 · 105 MAITLAND ST
  • Zoning review08 146037 ZSVClosed
    Apr 11, 2008 · 105 MAITLAND ST
  • Zoning review08 117470 ZPRClosed
    Mar 7, 2008 · 105 MAITLAND ST
  • Zoning review07 205992 ZPRClosed
    May 10, 2007 · 105 MAITLAND ST
  • Building permit05 152424Closed

    Sprinkler & standpipe systems to be installed in new addition & existing buildings. Refer to permit # 05 124440

    Feb 8, 2007 · 99-113 MAITLAND ST
  • Building permit05 124440Closed

    HVAC - Demolish part of existing building(s) & reconstruct new; make interior alterations to interior & exteriors. - Multiple Projects

    Jan 6, 2006 · 99-113 MAITLAND ST
  • Building permit05 123590Closed

    Underground mechanical services

    May 30, 2005 · 99-113 MAITLAND ST
Show 4 older records
  • Building permit05 124437Cancelled

    Demolish portion of existing building; reconstruct new & renovate existing interiors & exteriors.

    Apr 19, 2005 · 99-113 MAITLAND ST
  • Minor varianceA0185/04TApproved

    The National Ballet School is relocating its classrooms, ballet studios and administrative offices, which are located on the subject property, to a new facility on Jarvis Street. The subject property also currently houses student dormitories in a portion of the building. The applicant proposes to extend the student dormitories (with accessory facilities such as a kitchen, dining hall, and lounge areas) to the whole of the building. The subject property includes the lane to the rear of the building. The Proposal includes the renovation of the existing building and the extension and addition of one-storey to the existing four-storey Girls' Residence at the rear of the building, as well as, other minor additions. The highest portion of the building will be 18.6 metres at the rear of the site to accommodate mechanical rooftop equipment, which is 1.6 metres above what is permitted by the Zoning By-law's (438-86) general standards. The Proposal will have a density of 1.9 times the area of the subject property, while the existing density is approximately 1.4 times the area of the lot.

    Nov 17, 2004 · 99-113 MAITLAND ST
  • Zoning review04 185482 ZPRClosed
    Oct 27, 2004 · 99-113 MAITLAND ST
  • Zoning review04 167165 PSPClosed
    Aug 18, 2004 · 99-113 MAITLAND ST

Check before you build

  • Site-specific exception 900.2.10(801)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(801)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

  2. Older by-law A

    Section 12(5)(h) of former City of Toronto By-law 438-86

  3. Older by-law B

    On 105 Maitland St., former City of Toronto by-law 56-78.

By-law 569-2013, Chapter 900

Lot facts

Area
2,351 m²
Frontage
41.7 m
Depth
56.6 m
Street
Mutual St
Corner lot
Yes, also on Maitland St56.6 m along it
Public lane
Alexander Pl, 48.8 m along it
House footprint
1,856 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.3 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
10house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 160. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x801) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: planetree, london (65 cm), pear chanticleer (11 cm), pear chanticleer (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%10 of 10 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
33

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    97 GRANBY ST · Oct 15, 2025 · 378 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    344 JARVIS ST · Sep 21, 2022 · 250 m away
  • Minor varianceApproved

    To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.

    64 MCGILL ST · Jan 26, 2022 · 445 m away
  • Minor varianceApproved

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    92 ISABELLA ST · Jun 30, 2021 · 485 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.

    66 GLOUCESTER ST · Oct 8, 2020 · 395 m away

Latest activity nearby

  • Building permit

    Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

    43 WELLESLEY ST E · Oct 28, 2026 · 245 m away
  • Building permit

    Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

    330 JARVIS ST · Oct 13, 2026 · 289 m away
  • Building permit

    Proposal for installation of an art work on the front face of existing building. Weight 150kg

    519 CHURCH ST · Sep 25, 2026 · 252 m away
  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 104 m away
  • Zoning review

    Closed

    473 CHURCH ST · Sep 2, 2026 · 58 m away
  • Building permit

    Installation of one Electromagnetic Lock on ground floor.

    20 MAITLAND ST · Sep 1, 2026 · 295 m away
  • Building permit

    Proposed interior alterations to convert existing retail store to dental office.

    411 CHURCH ST · Aug 12, 2026 · 229 m away
  • Zoning review

    Closed

    66 WELLESLEY ST E · Jul 14, 2026 · 221 m away
  • Building permit

    Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

    43 WELLESLEY ST E · Jul 10, 2026 · 245 m away
  • Building permit

    Proposed Repair existing metal beam at top of Hydro vault box as required. Work to include removal of damaged/corroded material, preparation of surface, installation/repair of steel member, and protectivecoating/finish

    40 ALEXANDER ST · Jun 24, 2026 · 243 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station6 min walk
Nearest TTC stop
Wellesley St East at Church St3 min walk
Nearest cycling route
Maitland PlBike Lane - Contraflow, 2 min walk
Nearest traffic count
1,209 vehicles in 8 hMaitland St / Mutual St, 50 m away, Aug 27, 2007
Serious collisions within 500 m
112021–2026, killed or seriously injured: 1 fatal, 9 with pedestrians, 1 with cyclists
Parks
Barbara Hall Park3 min walk
Paul Kane House Parkette4 min walk
Alexander Street Parkette5 min walk

Schools within 1 km

  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 1 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 2 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 2 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 2 min walk
  • NATIONAL BALLET SCHOOL Private 3 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 3 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.