Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2004
Needs a closer lookStill open in the City's records: 04 162059 (Interior alterations to 2nd. floor vacant space for Ryerson University School of Psycho..., 2004, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)6 development applications open within 300 m
Good to know6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 105 GERRARD ST E · City file - Building permit12 286021Closed
Proposal for interior alterations to ground floor in existing building "Ryerson University - GER B 01" (105.40m2).
Nov 30, 2012 · 105 GERRARD ST E - Building permit11 326371Closed
Permit for interior alterations to create new office space in room 306 of existing Ryerson Building.
Dec 20, 2011 · 105 GERRARD ST E - Building permit10 128240Closed
Backflow prevention device (2") to be installed within the Research/Graduates Studies building of Ryerson University.
Mar 11, 2010 · 105 GERRARD ST E - Building permit10 128246Closed
Backflow prevention device (2") to be installed within the Cooperative Education and Internship building of Ryerson University.
Mar 11, 2010 · 105 GERRARD ST E - Building permit06 159348Closed - Dormant
HVAC - Make interior alterations to ground floor unit for retail store.
Aug 8, 2006 · 105 GERRARD ST E - Building permit05 173055Closed
Interior alterations to offices on 3rd floor of Modern Culture Media Centre/Psychology labs.
Sep 8, 2005 · 105 GERRARD ST E - Building permit04 162059Inspection
Interior alterations to 2nd. floor vacant space for Ryerson University School of Psychology. Actual address of work is 111 Gerrards st e
Aug 13, 2004 · 105 GERRARD ST E
Show 2 older records
- Zoning review97 025995 LTOClosedFeb 26, 1997 · 111 GERRARD ST E
- Zoning review87 029929 LTOClosedMar 18, 1987 · 111 GERRARD ST E
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 771 m²
- Frontage
- 21.2 m
- Depth
- 36.5 m
- Street
- Gerrard St E
- Corner lot
- No
- Public lane
- Ln S Gerrard E Mutual, 63.8 m along it
- House footprint
- 702 m²roof up to 13.4 m
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 92%12 of 13 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 1
- Multiplex permits
- 4
- Development applications
- 17
Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.
185 GERRARD ST E · Oct 14, 2026 · 310 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 365 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 410 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 204 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 367 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 224 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 111 m away - Building permit
1 Wall Sign***** T-DOT DENTAL*****
306 JARVIS ST · Nov 17, 2026 · 185 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 186 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 186 m away - Building permit
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
355 CHURCH ST · Oct 30, 2026 · 161 m away - Building permit
Proposal to install a maglock in existing office space.
355 CHURCH ST · Oct 28, 2026 · 161 m away - Building permit
Proposal to construct pedestrian ramp.
117 PEMBROKE ST · Oct 27, 2026 · 299 m away - Building permit
Proposed storage addition on the parking area in the building
105 CARLTON ST · Oct 15, 2026 · 226 m away - Building permit
Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.
330 JARVIS ST · Oct 13, 2026 · 282 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- College Station8 min walk
- Nearest TTC stop
- Carlton St at Jarvis St4 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 1 min walk
- Nearest traffic count
- 12,199 vehicles in 8 hJarvis St / Gerrard St E, 70 m away, Dec 3, 2022
- Serious collisions within 500 m
- 192021–2026, killed or seriously injured: 2 fatal, 13 with pedestrians, 4 with cyclists
- Parks
- Allan Gardens2 min walk
- Toronto Metropolitan University Square6 min walk
- Montague Parkette6 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 4 min walk
- TAIE INTERNATIONAL INSTITUTE SCHOOL Private 4 min walk
- LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
- NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.