HousePrecheckCheck an address

1049 Military TrlToronto · zoning, lot size and permit records

Also 1053 Military Trl, 1065 Military Trl, 1095 Military Trl

≈ 149.8 × 327.7 m37,279 m²on Pan Am Drcorner, also on Military Trl

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 24 231734 (To connect a new water line from existing water supplies to exterior irrigation system..., 2024); 16 209876 ESC 44 OZ (Official Plan Amendment application to adopt a Secondary Plan for the University of Tor..., 2016). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 6 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N50 m
≈ 149.8 m frontage≈ 327.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (7% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (4% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (14% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 231734 (To connect a new water line from existing water supplies to exterior irrigation system..., 2024); 16 209876 ESC 44 OZ (Official Plan Amendment application to adopt a Secondary Plan for the University of Tor..., 2016).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 6 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 244124Closed

    HVAC - Replace the exisintg front counter millwork with new counter. Extend existing ground floor food prep space, adjust HVAC to layout.

    Dec 10, 2024 · 1095 MILITARY TRL
  • Building permit24 231734Permit Issued

    To connect a new water line from existing water supplies to exterior irrigation system and add backflow preventer

    Dec 2, 2024 · 1095 MILITARY TRL
  • Building permit24 232965Cancelled

    Replace the exisintg front counter millwork with new counter. Extend existing ground floor food prep space, adjust HVAC to layout.

    Oct 30, 2024 · 1095 MILITARY TRL
  • Building permit18 171801Closed

    Proposed Interior alterations of Unitersity of Toronto - Business Analytic & Intelllgence Centre

    Jul 25, 2018 · 1095 MILITARY TRL
  • Building permit18 155137Cancelled

    Interior alterations - Unitersity of Toronto - business Analytic & Intelllgence Centre

    May 8, 2018 · 1095 MILITARY TRL
  • Development application16 209876 ESC 44 OZUnder Review

    Official Plan Amendment application to adopt a Secondary Plan for the University of Toronto Scarborough Campus.

    Aug 19, 2016 · 1049 MILITARY TRL · City file
  • Building permit15 140506Closed

    Revision - 1 additional maglock added Permit to install 14 Electromagnetic Locks within the existing 5 storey Enviromental Science & Chemistry Building - UTSC.

    Jul 13, 2015 · 1065 MILITARY TRL
  • Development application14 131315 ESC 44 OZClosed

    The application proposes to amend the Zoning By-law to permit reduced vehicular parking rates requirement for institutional uses, establish vehicular parking rate requirements for student residences and establish bicycle parking standards for the University of Toronto Scarborough Campus.

    Mar 20, 2014 · 1049 MILITARY TRL
Show 4 older records
  • Development application13 155021 ESC 44 OZClosed

    To remove the Holding zone to permit the development of a approximately 10 500 m² Environmental Sciences and Chemistry Building.

    Apr 22, 2013 · 1049 MILITARY TRL
  • Building permit12 234757Closed

    interior alterations to PPSA & Humanities building ground floor

    Oct 25, 2012 · 1095 MILITARY TRL
  • Development application09 149918 ESC 44 SAClosed

    Site plan approval for UTSC Instructional Centre at 1049 Military Trail (north-west corner of Military Trail and Ellesmere Rd).

    Jun 15, 2009 · 1049 MILITARY TRL
  • Building permit02 119666Closeddemolition

    DEMOLISH SINGLE FAMILY DWELLING

    Mar 22, 2002 · 1049 MILITARY TRL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
37,279 m²
Frontage
149.8 mestimated, irregular lot
Depth
327.7 mestimated, irregular lot
Street
Pan Am Dr
Corner lot
Yes, also on Military Trl327.7 m along it
Public lane
None
House footprint
3,817 m²roof up to 25.7 m
Back yard
13.5 mhouse to rear lot line
Side yards
8 m and 66.4 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm, american valley forge (8 cm), oak, red (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
12

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a front porch, rear basement walkout, rear ground floor deck and rear second floor balcony. The existing two-storey detached dwelling and detached garage will be demolished. Also, to construct a new oversized driveway on the east side of the lot. There will be a total of two dwelling units on the lot. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on April 9, 2025.

    3325 ELLESMERE RD · Nov 5, 2025 · 458 m away
  • Minor varianceApproved

    To permit the construction of a 26-storey (plus mezzanine and mechanical penthouse) building with retail at grade and 246 residential units. Cross Reference Zoning By-law Amendment 21 110357 ESC 24 OZ and Site Plan Control Application 21 110357 ESC 24 OZ. NOTE: This Revised Public Hearing Notice provides a more detailed description of the project to include the mezzanine and mechanical penthouse levels of the proposed building.

    3070 ELLESMERE RD · Jun 2, 2022 · 382 m away
  • Minor varianceApproved

    To permit building retrofits including: exterior envelope work, interior common/amenity space accessibility upgrades and renovations, exterior accessibility upgrades to circulation routes, drop-off and parking, mechanical and electrical systems upgrades.

    90 MORNELLE CRT · Jan 13, 2022 · 404 m away
  • Minor varianceApproved

    The purpose of this minor variance application is to obtain a temporary reduction in the number of required parking spaces for the University of Toronto, Scarborough Campus (UTSC).

    1050 MILITARY TRL · Mar 11, 2021 · 115 m away
  • Minor varianceApproved

    This application is for a proposal to develop the site with a 26-storey residential condominium building with 339 residential suites and commercial uses at grade.

    3070 ELLESMERE RD · Dec 11, 2014 · 382 m away

Latest activity nearby

  • Zoning review

    Not Started

    840 MILITARY TRL · Nov 6, 2026 · 285 m away
  • Zoning review

    Not Started

    40 PAN AM DR · Nov 3, 2026 · 243 m away
  • Zoning review

    Not Started

    1050 MILITARY TRL · Oct 28, 2026 · 115 m away
  • Building permit

    2 ground signs.***UNIVERSITY OF TORONTO***

    1050 MILITARY TRL · Sep 1, 2026 · 115 m away
  • Building permit

    4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING COMMONS -- BOOKSTORE -- UTSC RETAIL AND PARKING COMMONS **

    1050 MILITARY TRL · Jul 29, 2026 · 115 m away
  • Building permit

    1 GROUND SIGN**UNIVERITY OF TORONTO GARRON HEATH SCIENCES COMPLEX**

    1050 MILITARY TRL · Jun 19, 2026 · 115 m away
  • Building permit

    Proposal for interior alterations to a newly constructed building. Work is limited to ground floor rooms 187,193 & installation of new interior finishes, millwork, equipment & lighting. No structural modifications are proposed.

    1050 MILITARY TRL · Jun 5, 2026 · 115 m away
  • Zoning review

    Closed

    755 MORNINGSIDE AVE · May 5, 2026 · 202 m away
  • Zoning review

    Closed

    1050 MILITARY TRL · Apr 23, 2026 · 115 m away
  • Building permitnew building

    REV 02: Revision to finish mercantile space on the ground floor.Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    1050 MILITARY TRL · Apr 16, 2026 · 115 m away

Neighbourhood: Highland Creek

About the area around the lot, not the lot itself.

Nearest TTC stop
Military Trail at Pan Am Dr1 min walk
Nearest cycling route
Conlins RdBike Lane - Buffered, 10 min walk
Nearest traffic count
2,707 vehicles in 8 hMilitary Trl / Pan Am Dr, 70 m away, Dec 17, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Morningside Park5 min walk
Ellesmere Ravine Park9 min walk
Bonspiel Park11 min walk

Schools within 1 km

  • CENTENNIAL COLLEGE SCHOOL - MORNINGSIDE CAMPUS College 3 min walk
  • MILITARY TRAIL PUBLIC SCHOOL English Public 8 min walk
  • ROUGE VALLEY EDUCATION CENTRE Private 9 min walk
  • ST JOHN PAUL II CATHOLIC SECONDARY SCHOOL English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHighland CreekMedian neighbourhood
Median household income (2020)$120,000$84,500
Households that own their home86%54%
Population (2021)12,62516,813
Homes built in 1960 or before9%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHighland CreekCity median
Assault575.6636.3
Robbery44.369.5
Homicide7.45.3
Shootings7.410.5
Auto theft243.5192.6
Theft over $5,00095.946.1
Break and enter118.1172.8
Theft from vehicles214188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.