HousePrecheckCheck an address

1045 Leslie StToronto · zoning, lot size and permit records

Open space · O≈ 160.8 × 39.8 m4,536 m²on Leslie St

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 3 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • Major Transit Station Area: Sunnybrook ParkThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 160.8 m frontage≈ 39.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
4,536 m²
Frontage
160.8 mestimated, irregular lot
Depth
39.8 mestimated, irregular lot
Street
Leslie St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Site and Area Specific Policy 092. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Sunnybrook Park. The lot is inside the Sunnybrook Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 640). Source
  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
7

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed temporary stage for Terry Fox Run. Setup date: Sept 19, 2026 and Removal date Sept 20, 2026

    1100 LESLIE ST · Sep 17, 2026 · 176 m away
  • Building permit

    Proposal for interior alterations to second floor of car dealership to construct an office space.

    1075 LESLIE ST · Jul 15, 2026 · 54 m away
  • Building permit

    2 WALL SIGNS**HONEY SMILE DENTISTRY****HONEY AESTHETIC CLINIC**

    12 INN ON THE PARK DR · Jul 3, 2026 · 92 m away
  • Building permit

    2 WALL SIGNS**HONEY SMILE DENTISTRY****HONEY AESTHETIC CLINIC**

    12 INN ON THE PARK DR · Jun 23, 2026 · 92 m away
  • Building permit

    Proposal for removal of exterior retaining wall for new retaining wall and new reinforced slab on grade for fire truck outrigger.

    1109 LESLIE ST · Feb 6, 2026 · 267 m away
  • Building permit

    Proposal to restore retaining wall and site features.

    1109 LESLIE ST · Nov 5, 2025 · 267 m away
  • Building permit

    Proposed alterations for residential washer & dryer, purchased by the Toronto Fire Services for Fire Station #125.

    1109 LESLIE ST · Jun 3, 2025 · 267 m away
  • Building permit

    ERECT TEMPORARY STRUCTURE FOR TERRY FOX RUN. SET UP BEGINS: 14 SEP 2024; TEAR DOWN 15 SEPT 2024.

    1100 LESLIE ST · Sep 12, 2024 · 176 m away
  • Consent (lot split)Approved

    To obtain consent to the creation of an easement/right of way for pedestrian access to a retaining wall and adjoining landscaping for maintenance and repair purposes. (Related File#: ZBA 15 108593 NNY 25OZ, Draft Plan of Subdivision 15 108578 NNY 25SB, Site Plan 16 193617 NNY 25 SA/19 137676 NNY 16 SA)

    1075 LESLIE ST · Oct 2, 2023 · 54 m away
  • Development application

    Draft Plan of Standard Condominium to permit 250 residential condominium units within a 39-storey building inclusive of 281 parking spaces located within 5 levels of below-grade. 2 stand-alone retail spaces are also proposed. Tower A, third and final application of a 3-tower development. Associated File Nos.: 15 108593 NNY 25 OZ, Draft Plan of Subdivision 15 108578 NNY 25 SB; Site Plan Approval 19 137676 NNY 16 SA

    1091 LESLIE ST · Mar 17, 2023 · 85 m away · City file

Neighbourhood: Banbury-Don Mills

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station3 min walk
Nearest TTC stop
Leslie St at Eglinton Ave East North Side1 min walk
Nearest cycling route
Sunnybrook Park TrlPark Road, 1 min walk
Nearest traffic count
15,026 vehicles in 8 hLeslie St / Sunnybrook Park Trl, 50 m away, Aug 4, 1993
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Wilket Creek Park1 min walk
Don-Leslie Park1 min walk
E.T. Seton Park4 min walk

2021 Census

FigureBanbury-Don MillsMedian neighbourhood
Median household income (2020)$91,000$84,500
Households that own their home60%54%
Population (2021)27,15516,813
Homes built in 1960 or before24%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBanbury-Don MillsCity median
Assault404.9636.3
Robbery101.269.5
Shootings9.210.5
Auto theft220.9192.6
Theft over $5,00067.546.1
Break and enter248.5172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.