Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 26 104081 (Demolition of existing 4 storey commercial building, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications11 development applications open within 300 m
Good to know11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- Building permit26 104081Inspection
Demolition of existing 4 storey commercial building
Feb 2, 2026 · 104 BOND ST - Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 104 BOND ST · City file - Building permit09 170605Closed
Proposal to install one backflow prevention device
Oct 1, 2009 · 104 BOND ST
Check before you build
Site-specific exception 900.11.10(2201)
Needs a closer look5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 216 of former City of Toronto By-law 438-86
- Older by-law D
Former City of Toronto By-law 97-0194
- Older by-law E
Regulations (A) to (D) above do not apply to the lands municipally known as 104 Bond Street and 110 Bond Street in 2023.
Lot facts
- Area
- 692 m²
- Frontage
- 19.4 m
- Depth
- 36.1 m
- Street
- Bond St
- Corner lot
- No
- Public lane
- Victoria Street Lane, 19.2 m along it
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c0.5; r4.0) SS1 (x2201) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 93%14 of 15 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 30
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 250 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 453 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 478 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 340 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 352 m away
Latest activity nearby
- Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 192 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 117 m away - Building permit
Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.
260 YONGE ST · Nov 6, 2026 · 265 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.
1 DUNDAS ST W · Nov 5, 2026 · 236 m away - Building permit
Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.
332 YONGE ST · Nov 5, 2026 · 250 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 279 m away - Building permit
1 overhanging structure sign**SIMONS CHRISTMAS WREATH**
260 YONGE ST · Oct 27, 2026 · 265 m away - Zoning review
Closed
1 DUNDAS ST E · Oct 26, 2026 · 140 m away - Building permit
FS - Sprinkler Shop Drawing - Interior alterations - new office suite fit-out (tenant Improvements)
20 DUNDAS ST W · Oct 23, 2026 · 227 m away - Building permit
1 overhanging structure sign**SIMONS CHRISTMAS WREATH**
260 YONGE ST · Oct 15, 2026 · 265 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station3 min walk
- Nearest TTC stop
- Dundas St East at Church St2 min walk
- Nearest cycling route
- Shuter StBike Lane, 4 min walk
- Nearest traffic count
- 11,168 vehicles in 14 hDundas St E / Bond St, 60 m away, Aug 20, 2024
- Serious collisions within 500 m
- 182021–2026, killed or seriously injured: 1 fatal, 11 with pedestrians, 4 with cyclists
- Parks
- Toronto Metropolitan University Square1 min walk
- Arena Gardens4 min walk
- Trinity Square4 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 1 min walk
- TMU - HEASLIP HOUSE University 2 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 2 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 2 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 3 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.