HousePrecheckCheck an address

103 Chelsea AveToronto · zoning, lot size and permit records

Open space · OR20.9 × 33.2 m610 m²on Chelsea Ave

Not a home

Chelsea Avenue Playground

The City of Toronto's real estate inventory lists Chelsea Avenue Playground here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 6 development applications open within 300 m, up to 42 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • Major Transit Station Area: Dundas WestThe City plans more homes around the station: good for transit, and more building over time.
N10 m
20.9 m frontage33.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 42 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
610 m²
Frontage
20.9 m
Depth
33.2 m
Street
Chelsea Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Dundas West. The lot is inside the Dundas West Major Transit Station Area approved by the Province (Site and Area Specific Policy 654). Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: maple, norway (33 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
80%39 of 49 decisions
Garden suite permits
3
Laneway suite permits
5
Multiplex permits
22
Development applications
11

Within 300 m, last 10 years. 30 suite and multiplex permits: more than at 94% of Toronto houses (median 3). 49 variance decisions: more than at 84% of Toronto houses (median 19).

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two residential lots and to create new easements/rights-of-way.

    579 INDIAN RD · Dec 16, 2026 · 87 m away
  • Minor variancePending

    To construct a new two-storey detached ancillary building, in the rear yard, abutting the laneway. The first level will contain an office/den, one-car garage, and two bicycle parking spaces, and the second level will contain one laneway suite. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

    33 DORVAL RD · Dec 16, 2026 · 104 m away
  • Minor variancePending

    To construct a new three-storey detached dwelling (houseplex) with front and rear porches, front and rear balconies on the second and third storeys, front and rear basement walkouts, and two side (south) entrances. The second storey will be cantilevered on the south side of the building. Also, to construct a new two-storey semi-detached ancillary building (to contain one garden suite) in the rear yard. One parking space will be provided in the rear yard, which will be accessed through the shared mutual driveway with the south abutting lot. There will be a total of seven residential dwelling units on this lot (six units within the main building and one unit within the ancillary building).

    579 INDIAN RD · Dec 16, 2026 · 87 m away
  • Minor variancePending

    To construct a new three-storey detached dwelling (houseplex) with front and rear porches, front and rear balconies on the second and third storeys, front and rear basement walkouts, and two side (north) entrances. The second storey will be cantilevered on the north side of the building. Also, to construct a new two-storey semi-detached ancillary building (to contain one garden suite) in the rear yard. One parking space will be provided in the rear yard, which will be accessed through the shared mutual driveway with the north abutting lot. There will be a total of seven residential dwelling units on this lot (six units within the main building and one unit within the ancillary building).

    579 INDIAN RD · Dec 16, 2026 · 87 m away
  • Minor variancePending

    To alter the existing two-storey detached dwelling by constructing a new one-storey side (south) addition (including a basement extension). The existing one-storey side (south) addition will be demolished.

    81 INDIAN ROAD CRES · Nov 25, 2026 · 272 m away
  • Building permitgarden suite

    Proposal for a 2 storey garden suite

    559 INDIAN RD · Nov 16, 2026 · 63 m away
  • Building permitgarden suite

    Proposal for a 2 storey garden suite

    559 INDIAN RD · Nov 16, 2026 · 63 m away
  • Zoning review

    Closed

    1539 BLOOR ST W · Nov 10, 2026 · 292 m away
  • Building permitmultiplex

    Proposal to undertake interior alterations and convert the existing dwelling into a triplex, including basement underpinning and associated structural modifications.

    12 GLEN GORDON RD · Nov 10, 2026 · 248 m away
  • Building permit

    Interior alteration - Hearing Life (Consultation)

    1646 BLOOR ST W · Nov 10, 2026 · 215 m away

Neighbourhood: High Park North

About the area around the lot, not the lot itself.

Nearest station
Dundas West Station4 min walk
Nearest TTC stop
Dundas West Station3 min walk
Nearest cycling route
Bloor St WCycle Track, 3 min walk
Nearest traffic count
403 vehicles in 8 hIndian Rd / Chelsea Ave, 60 m away, May 21, 2019
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Chelsea Avenue Playground1 min walk
West Toronto Railpath6 min walk
Perth Avenue Parkette8 min walk

Schools within 1 km

  • TAMARACK WEST OUTDOOR SCHOOL Private 5 min walk
  • BISHOP MARROCCO THOMAS MERTON CATHOLIC SECONDARY SCHOOL English Separate 6 min walk
  • KEELE ST JR SCHOOL English Public 8 min walk
  • INDIAN ROAD CRESCENT JR PUBLIC SCHOOL English Public 11 min walk
  • PERTH AVENUE JR PUBLIC SCHOOL English Public 11 min walk
  • WESTMINSTER CLASSICAL CHRISTIAN ACADEMY ELEMENTARY SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHigh Park NorthMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home33%54%
Population (2021)21,85516,813
Homes built in 1960 or before38%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHigh Park NorthCity median
Assault677.9636.3
Robbery43.169.5
Homicide3.95.3
Shootings3.910.5
Auto theft74.5192.6
Theft over $5,00027.446.1
Break and enter133.2172.8
Theft from vehicles152.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.