Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 103 Abbott Ave
103 Abbott Ave is on a 9.1 m by 30.2 m lot on Abbott Ave in High Park North. The zoning is R. A site-specific exception, 900.2.10(737), changes some of the usual rules for this address.
The City has 9 records on this lot since 2017. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Revision - the design has been revised to incorporate a split-system approach for enhanced efficiency and climate control. the basement and main floor will now…". Status: closed. In 2025, a building permit was filed: "Proposed demolition of existing 1 storey sfd". Status: closed. In 2022, a Committee of Adjustment application was filed: "To construct a new detached dwelling with an attached garage and new second and third storey rear decks". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open. Keele station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- No permit for a second unit on fileLowFree check
- The back yard may be too tight for a garden suiteLowFree check
- House demolished in 2025, no new house permit on fileLow
- 1 development application open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- 3 Committee of Adjustment files on this lotLowFree check
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
9 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-08-22 | Building permit23 129984 | Revision - The design has been revised to incorporate a split-system approach for enhanced efficiency and climate control. The basement and main floor will now be conditioned, concealed HP unit. Second and Third Floor will be similarly conditioned.HVAC - Proposal to demolish existing dwelling to construct new three (3) storey Single Family Dwelling with finished walkout basement, integral garage, rear deck and second/third storey deck | Closed | |
| 2025-03-07 | Building permit23 129483 | Proposed demolition of existing 1 storey SFD | Closed | |
| 2022-10-27 | Minor varianceA0851/22TEY | To construct a new detached dwelling with an attached garage and new second and third storey rear decks. | Approved | |
| 2022-06-01 | Zoning review22 155429 ZAP | No description on file | Closed | |
| 2021-06-16 | Consent (lot split)B0049/20TEY | To obtain consent for a technical severance to re-establish two residential lots which merged on title. | Approved | |
| 2020-10-19 | Zoning review20 207936 ZZC | No description on file | Cancelled | |
| 2020-09-25 | Zoning review20 198941 ZPR | No description on file | Closed | |
| 2020-07-09 | Minor varianceSYS 4779323 | No description on file | Pending | |
| 2017-06-28 | Building permit17 188334 | Proposal to underpin and finish the basement | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Exception 900.2.10(737) does not apply to this address
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Exception 900.2.10(737) does not apply to this address
Nothing to doNothing to do: this does not apply to the house.
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: needs a closer look
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x737)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m
- In the Keele station area
- 45 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 7 of 8 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
High Park North neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Keele StationNearest station8 min walk
- Keele St at Glenlake AveNearest TTC stop4 min walk
- West Toronto Rail Path TrlNearest cycling route7 min walk
- Indian Road Crescent Jr Public SchoolSchool5 min walk
- Keele St Jr SchoolSchool5 min walk
- Tamarack West Outdoor SchoolSchool7 min walk
- Lucy McCormick Sr SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3677.9
- Robberycity median 69.543.1
- Homicidecity median 5.33.9
- Shootingscity median 10.53.9
- Auto theftcity median 192.674.5
- Theft over $5,000city median 46.127.4
- Break and entercity median 172.8133.2
- Theft from vehiclescity median 188.1152.8
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist