HousePrecheckCheck an address

1024 Dufferin StToronto · zoning, lot size and permit records

Also 1030 Dufferin St, 1040 Dufferin St

90.3 × 36.6 m3,224 m²on Dufferin Stbacks onto Ln N Bloor W Dufferin

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 18 242896 (Provide stainless steel pipes and fittings for main domestic water service in lieu of d..., 2018). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N50 m
90.3 m frontage36.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 18 242896 (Provide stainless steel pipes and fittings for main domestic water service in lieu of d..., 2018).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit22 100336Closed

    Proposal to replace the existing chiller and cooling tower.

    Jan 18, 2022 · 1040 DUFFERIN ST
  • Building permit18 242896Application Received

    Provide stainless steel pipes and fittings for main domestic water service in lieu of ductile-iron pipes and fittings.New stainless steel pipes shall confirm to ASTM A 269, "Seamless and welded autenitic stainless tubing for general service", schedule 40, and type 304. Connections shall be butt welded and/or flanged. Pipe fittings shall be made of a material that matches the grade of the pipe material.For additional information refer to attached Ontario Ministry of Municipal Affairs, "Proposed Change to The 2012 Building Code O. Reg. 332/12 as Amended". Change Number B-07-02-07, Ontario-NPC, Code Reference Division B/7.2.6.

    Oct 15, 2018 · 1030 DUFFERIN ST
  • Building permit18 152131Closed

    Proposal to replace existing incoming domestic cold water main and install backflow prevention device in existing office.

    May 23, 2018 · 1030 DUFFERIN ST
  • Building permit15 255792Closed

    Install backflow preventer at ground floor sprinkler room

    Nov 26, 2015 · 1040 DUFFERIN ST
  • Building permit07 266364Closed

    Bell Central Office/Equiptment Building. Install 2 electromagnetc locks in BSMT Office

    Oct 29, 2007 · 1040 DUFFERIN ST
  • Building permit07 100869Closed - Dormant

    HVAC - Make interior alterations to second floor of telecomminications building (Bell Canada).

    Jan 12, 2007 · 1040 DUFFERIN ST
  • Building permit04 117935Closed - Dormant

    HVAC - Interior alterations - upgrade standby power genset., mobile power connection, swithcboard upgrade and genset room alteration. - Interior Alterations

    Jun 23, 2005 · 1024 DUFFERIN ST
  • Building permit02 166392Closed

    Bell switch building. Install 17 maglocks 2 in basement; 3 maglocks on 4rth; 1 maglock on 3rd; 4 maglocks on 2nd;7maglocks on 1st floor

    Aug 22, 2002 · 1024 DUFFERIN ST
Show 3 older records
  • Building permit99 015577Closed

    MAKE INTERIOR ALTERATIONS TO PORTION OF 1ST FLOOR FOR CLASSROOMS FEE$ 875.58

    May 17, 1999 · 1030 DUFFERIN ST
  • Building permit99 012136Closed

    ALTER EXISTING H.V.A.C. SYSTEM ON THE 2ND AND 3RD FLOORS. SEE 420258 /LM

    Feb 4, 1999 · 1030 DUFFERIN ST
  • Building permit98 024646Closed

    MAKE INTERIOR ALTERATIONS TO 2ND AND 3RD FLOOR FOR TRAINING CENTRE USE TENANT: BELL CANADA JNB

    Dec 7, 1998 · 1030 DUFFERIN ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,224 m²
Frontage
90.3 m
Depth
36.6 m
Street
Dufferin St
Corner lot
No
Public lane
Ln N Bloor W Dufferin, 5.2 m along it
House footprint
819 m²roof up to 31.7 m
Back yard
0.2 mhouse to rear lot line
Side yards
2.1 m and 52.7 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    90%45 of 50 decisions
    Garden suite permits
    5
    Laneway suite permits
    13
    Multiplex permits
    17
    Development applications
    17

    Within 300 m, last 10 years. 35 suite and multiplex permits: more than at 96% of Toronto houses (median 3). 50 variance decisions: more than at 85% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new three-storey detached building (houseplex) with a front basement walkout, a front porch with stairs, three side (south) covered entrances with stairs, a rear entrance with stairs, and front and rear third storey balconies. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite) with a corner (northeast) patio. There will be a total of seven residential dwelling units on this lot (six dwelling units within the main building, and one dwelling unit within the ancillary building).

      529 GLADSTONE AVE · Sep 9, 2026 · 234 m away
    • Minor varianceApproved

      To construct a new rear one-storey detached ancillary building (garage containing one parking space and storage) and driveway in the rear yard, abutting the laneway.

      991 DUFFERIN ST · Aug 5, 2026 · 202 m away
    • Minor varianceApproved

      To alter the existing two-storey townhouse dwelling by constructing extensions to the upper and lower ground floor decks, and a new rooftop access staircase (within the attic space). Also, to permit the existing rooftop deck which was constructed without an authorized building permit. The existing rear one-storey addition (vestibule leading to the basement level) and rooftop access stairs will be demolished.

      45 ARMSTRONG AVE · Jul 22, 2026 · 482 m away
    • Minor varianceApproved

      To construct a new one-storey ancillary building (sitting area/workshop and sauna), with a covered porch (located at the southwest corner of the building), in the rear yard. The existing one-storey ancillary detached building (garage) will be demolished.

      57 EMERSON AVE · Jul 22, 2026 · 425 m away
    • Minor varianceApproved

      To construct a new one-storey detached ancillary building (two-car garage with two undersized parking spaces with a storage/workshop space) in the rear yard, abutting the laneway. The existing rear one-storey detached ancillary building (one-car garage) in the rear yard will be demolished.

      963 DUFFERIN ST · Jul 15, 2026 · 269 m away

    Latest activity nearby

    • Building permit

      Proposed reinstate the existing decrepit concrete steps below grade

      1108 DUFFERIN ST · Nov 24, 2026 · 183 m away
    • Building permit

      Proposal to construct an attached roof above an existing deck in rear yard.

      661 BROCK AVE · Nov 18, 2026 · 240 m away
    • Zoning review

      Closed

      1084 BLOOR ST W · Nov 6, 2026 · 183 m away
    • Building permit

      Interior alterations for a proposed new take out restaurant.

      980 DUFFERIN ST · Nov 4, 2026 · 205 m away
    • Zoning review

      Closed

      634 BROCK AVE · Nov 2, 2026 · 266 m away
    • Building permitmultiplex, new building, new house

      Revision No.1:PROPOSED RESIDENTIAL SIXPLEX(BASEMENT+3 STOREY)

      999 DUFFERIN ST · Nov 2, 2026 · 172 m away
    • Zoning review

      Closed

      1108 BLOOR ST W · Oct 27, 2026 · 114 m away
    • Zoning review

      Notice Sent

      1101 BLOOR ST W · Oct 23, 2026 · 179 m away
    • Building permit

      Proposed multiple projects including interior alterations for load-bearing wall removal at ground floor, kitchen & second-floor, and underpinning.

      1106 DUFFERIN ST · Oct 23, 2026 · 178 m away
    • Zoning review

      Notice Sent

      53 BARTLETT AVE · Oct 22, 2026 · 273 m away

    Neighbourhood: Junction-Wallace Emerson

    About the area around the lot, not the lot itself.

    Nearest station
    Dufferin Station1 min walk
    Nearest TTC stop
    Dufferin Station - Westbound Platform1 min walk
    Nearest cycling route
    Bloor St WCycle Track, 2 min walk
    Nearest traffic count
    24,884 vehicles in 14 hDufferin St / Bloor St W, 100 m away, Oct 27, 2026
    Serious collisions within 500 m
    82021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
    Parks
    Susan Tibaldi Parkette4 min walk
    Salem Parkette6 min walk
    Dufferin Grove Park7 min walk

    Schools within 1 km

    • BLOOR C.I. & ALPHA II ALTERNATIVE English Public 3 min walk
    • PAULINE JR PUBLIC SCHOOL English Public 5 min walk
    • ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • ST MARY CATHOLIC ACADEMY SECONDARY SCHOOL English Separate 7 min walk
    • DOVERCOURT JR PUBLIC SCHOOL English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureJunction-Wallace EmersonMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home50%54%
    Population (2021)23,18016,813
    Homes built in 1960 or before40%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleJunction-Wallace EmersonCity median
    Assault720636.3
    Robbery3669.5
    Shootings3.610.5
    Auto theft108192.6
    Theft over $5,00032.446.1
    Break and enter230.4172.8
    Theft from vehicles201.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.