HousePrecheckCheck an address

1015 Jane StToronto · zoning, lot size and permit records

Open space · OR≈ 36.4 × 202.7 m4,574 m²on Jane Stcorner, also on Eglinton Ave W

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
N50 m
≈ 36.4 m frontage≈ 202.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
4,574 m²
Frontage
36.4 mestimated, irregular lot
Depth
202.7 mestimated, irregular lot
Street
Jane St
Corner lot
Yes, also on Eglinton Ave W202.7 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Mount Dennis Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a TTC Access Hub on the northeast corner of Jane Street and Eglinton Avenue West.

    3650 EGLINTON AVE W · Apr 11, 2019 · 238 m away

Latest activity nearby

  • Development application

    Proposed standalone facility designed to accommodate critical equipment required to supplytraction power to the transit line. At street level, the building is conceived as a single-storey structure.

    3650 EGLINTON AVE W · Jul 31, 2026 · 163 m away · City file
  • Building permit

    Proposal for a temporary air supported structure over existing Tennis Court from Oct 1, 2026 to May 31, 2027

    3601 EGLINTON AVE W · Jul 21, 2026 · 231 m away
  • Building permit

    Alternative solution for a Standpipe System as it exceed the maximum area of 2,500sqm

    3601 EGLINTON AVE W · Jun 12, 2026 · 231 m away
  • Building permitnew building

    REV 01: Approxiately 70m^2 maintenance shed. 1.2m foundations to support modular steel struture, pre-finished metal panel and 2430mm fence enclosed yard.Proposal to construct a new maintenance shed Ferge Brown Park

    3700 EGLINTON AVE W · Mar 9, 2026 · 81 m away
  • Building permit

    The proposed work involves the size-for-size relocation and replacement of an existing 150mm diameter water service for Fergy Brown Park. This relocation is required to eliminate conflicts with the proposed caisson installation associated with the Crosstown LRT project. The scope of work is limited to approximately 60 metres of the service line and does not include any upgrades or modifications to the existing facility or the remainder of the water service. The new segment will be installed to closely match the existing alignment while ensuring compliance with municipal design standards and maintaining uninterrupted service during construction.

    3700 EGLINTON AVE W · Oct 1, 2025 · 81 m away
  • Building permitnew building

    Workshop and transfer station will be used by contractor STRABAG Eglinton Project for AdvanceTunnel Contract 2 for the Eglinton Crosstown West Extension. Both structures are temporary and willbe constructed within site premisses (Metrolinx Land).

    3650 EGLINTON AVE W · Mar 7, 2025 · 238 m away
  • Zoning review

    Notice Sent

    3650 EGLINTON AVE W · Aug 17, 2023 · 238 m away
  • Building permitnew building

    Replace the existing shelter with a new Wheel-Trans Mobility Transit Hub Shelter

    3650 EGLINTON AVE W · Nov 1, 2019 · 238 m away
  • Minor varianceApproved

    To construct a TTC Access Hub on the northeast corner of Jane Street and Eglinton Avenue West.

    3650 EGLINTON AVE W · Apr 11, 2019 · 238 m away
  • Building permitnew building

    Construct a new air supported structure over existing tennis courts.

    3651 EGLINTON AVE W · Jun 16, 2008 · 156 m away

Neighbourhood: Mount Dennis

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station13 min walk
Nearest TTC stop
Eglinton Ave West at Jane St East Side1 min walk
Nearest cycling route
Eglinton Ave West TrlMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
38,671 vehicles in 14 hJane St / Eglinton Ave W, 140 m away, Jul 3, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Fergy Brown Park1 min walk
Eglinton Flats1 min walk
Pearen Park4 min walk

Schools within 1 km

  • ROSELANDS JR PUBLIC SCHOOL English Public 7 min walk
  • BALA AVENUE COMMUNITY SCHOOL English Public 8 min walk
  • OUR LADY OF VICTORY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • YORK HUMBER HIGH SCHOOL English Public 13 min walk
  • DENNIS AVENUE COMMUNITY SCHOOL (CLOSED LOCATION) English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount DennisMedian neighbourhood
Median household income (2020)$70,500$84,500
Households that own their home48%54%
Population (2021)13,05516,813
Homes built in 1960 or before30%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount DennisCity median
Assault562.1636.3
Robbery83.369.5
Homicide6.95.3
Shootings13.910.5
Auto theft152.7192.6
Theft over $5,00013.946.1
Break and enter124.9172.8
Theft from vehicles180.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.