HousePrecheckCheck an address

1012 O'Connor DrToronto · zoning, lot size and permit records

Residential multiple · RM (f15.0; a930; d0.75) (x100)16.4 × 77.3 m1,206 m²on O'Connor Dr

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 12 rental units, built 1954More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 m, up to 10 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • City upkeep score: 90 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
16.4 m frontage77.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 222121 PRS 00 IR (Property Standards, 2026); 26 206963 PRS 00 IR (Property Standards, 2026); 26 206038 PRS 00 IV (Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 m..., 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 10 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 90 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 12 units, built 1954).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 222121 PRS 00 IRClosed

    Property Standards

    Aug 18, 2026 · 1012 O'CONNOR DR
  • By-law investigation26 206963 PRS 00 IRClosed

    Property Standards

    Jul 22, 2026 · 1012 O'CONNOR DR
  • By-law investigation26 206038 PRS 00 IVClosed

    Order Issued Property Standards: In a dwelling unit, a window located more than 2,000 millimetres above grade opens within 1,500 millimetres of the floor not leading to a balcony does not emplo

    Jul 21, 2026 · 1012 O'CONNOR DR
  • By-law investigation26 205766 PRS 00 IRClosed

    Property Standards

    Jul 21, 2026 · 1012 O'CONNOR DR
  • By-law investigation26 179026 PRS 00 IRClosed

    Property Standards

    Jun 5, 2026 · 1012 O'CONNOR DR
  • By-law investigation26 171424 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 1012 O'CONNOR DR
  • By-law investigation26 171423 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 1012 O'CONNOR DR

Check before you build

  • Site-specific exception 900.6.10(100)

    Needs a closer look

    6 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(100)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum lot coverage is 40% for an apartment building

  2. Rule B

    The maximum height is 3 storeys for an apartment building

  3. Rule C

    The minimum front yard setback is 7.0 metres for an apartment building

  4. Rule D

    The minimum rear yard setback is 12.0 metres for an apartment building

  5. Rule E

    The minimum side yard setback is 3.0 metres for an apartment building

  6. Rule F

    The minimum on-site parking rate is 1.25 parking spaces per dwelling unit for an apartment building .

By-law 569-2013, Chapter 900

Lot facts

Area
1,206 m²
Frontage
16.4 m
Depth
77.3 m
Street
O'Connor Dr
Corner lot
No
Public lane
None
House footprint
261 m²roof up to 11.1 m
Back yard
49.8 mhouse to rear lot line
Side yards
1.4 m and 2.5 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 15 m. Frontage is about 16.4 m: meets the zone minimum. Source
  • Minimum lot area 930 m². Lot area is 1,206 m²: meets the minimum. Source
  • Zone RM (f15.0; a930; d0.75) (x100) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
100%12 of 12 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
2

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Back water valve installation

    22 JOANITH DR · Nov 12, 2026 · 293 m away
  • Building permit

    Proposed interior alterations for egress window modification.

    1143 O'CONNOR DR · Nov 3, 2026 · 289 m away
  • Building permit

    Renovate the existing one-and-one-half-storey detached dwelling by constructing a full second storey addition (cantilevered at the front and rear), main floor open concept and box window, a new front porch with stairs, and a rear main floor deck with stairs.

    24 GARDENS CRES · Oct 21, 2026 · 243 m away
  • Building permit

    Proposal to demolish the existing deck and construct a new deck in the rear yard

    11 BARRETT RD · Oct 13, 2026 · 217 m away
  • Building permit

    Proposed replacement of the existing single zone fire alarm system with an upgrade to three zones.

    1016 O'CONNOR DR · Sep 16, 2026 · 23 m away
  • Building permitmultiplex, secondary suite

    Revision No.1: REVISION TO CONVERT ALL EXTERIOR EXISTING BASEMENT AND MAIN FLOOR WALLS TO NEW WALLSProposal for a rear 2 storey addition, 2nd floor addition, rear deck, underpinning and interior alterations to create a duplex

    14 JOANITH DR · Sep 9, 2026 · 293 m away
  • Zoning review

    Closed

    37 GARDENS CRES · Aug 21, 2026 · 294 m away
  • Minor varianceApproved

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition (cantilevered at the front and rear), a front ground floor one-storey addition (bay window), a new front porch with stairs, and a rear ground floor deck with stairs.

    24 GARDENS CRES · Aug 19, 2026 · 243 m away
  • Zoning review

    Closed

    24 GARDENS CRES · May 26, 2026 · 243 m away
  • Zoning review

    Closed

    971 O'CONNOR DR · May 25, 2026 · 142 m away

Neighbourhood: O'Connor-Parkview

About the area around the lot, not the lot itself.

Nearest station
Sloane Station29 min walk
Nearest TTC stop
O'Connor Dr at Dohme Ave2 min walk
Nearest cycling route
Northline RdSigned Route (No Pavement Markings), 10 min walk
Nearest traffic count
13,329 vehicles in 8 hO'Connor Dr / Dohme Ave, 140 m away, Jun 15, 2017
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Topham Park4 min walk
Parkview Gardens9 min walk
Charles Sauriol Conservation Area10 min walk

Schools within 1 km

  • SELWYN ELEMENTARY SCHOOL English Public 6 min walk
  • ABACUS MONTESSORI Private 7 min walk
  • GORDON A BROWN MDL SCHOOL English Public 8 min walk
  • PRESTEIGN HEIGHTS ELEMENTARY SCHOOL English Public 12 min walk
  • O'CONNOR PUBLIC SCHOOL English Public 15 min walk
  • IMAM ALI ISLAMIC CENTRE AND AL HAADI ACADEMY SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureO'Connor-ParkviewMedian neighbourhood
Median household income (2020)$77,000$84,500
Households that own their home46%54%
Population (2021)18,40516,813
Homes built in 1960 or before48%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleO'Connor-ParkviewCity median
Assault755.6636.3
Robbery43.669.5
Shootings4.810.5
Auto theft179.2192.6
Theft over $5,00038.746.1
Break and enter77.5172.8
Theft from vehicles193.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.