HousePrecheckCheck an address

1012 Gerrard St EToronto · zoning, lot size and permit records

Also 1014 Gerrard St E, 1016 Gerrard St E, 1018 Gerrard St E

28.7 × 33.2 m944 m²on Gerrard St Ecorner, also on Marjory Ave

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.1 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
28.7 m frontage33.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    25 records on file: more than at 100% of Toronto houses (median 0).

    • By-law investigation26 161609 GRA 00 IVClosed

      Notice Issued Graffiti

      May 11, 2026 · 1012 GERRARD ST E
    • By-law investigation26 161335 GRA 00 IVClosed

      Notice Issued Graffiti

      May 11, 2026 · 1012 GERRARD ST E
    • By-law investigation26 158940 GRA 00 IRClosed

      Graffiti

      May 11, 2026 · 1012 GERRARD ST E
    • By-law investigation26 158938 GRA 00 IRClosed

      Graffiti

      May 11, 2026 · 1012 GERRARD ST E
    • By-law investigation26 109654 WST 00 IRClosed

      Waste

      Jan 27, 2026 · 1012 GERRARD ST E
    • Zoning review24 241879 PRZClosed
      Aug 18, 2025 · 1012 GERRARD ST E
    • By-law investigation25 115810 GRA 00 IVClosed

      Notice Issued Graffiti

      Jan 26, 2025 · 1012 GERRARD ST E
    • By-law investigation25 108916 GRA 00 IRClosed

      Graffiti

      Jan 26, 2025 · 1012 GERRARD ST E
    Show 17 older records
    • By-law investigation24 250398 GRA 00 IRClosed

      Graffiti

      Dec 13, 2024 · 1012 GERRARD ST E
    • Development application24 241879 STE 14 OZClosed

      Zoning By-law Amendment application to permit a 14-storey mixed use building containing 112 residential units and 7,899 square metres of gross floor area including 291 square metres of non-residential gross floor area, 9 vehicular parking spaces and 136 bicycle parking spaces underground.

      Nov 21, 2024 · 1012 GERRARD ST E · City file
    • Zoning review19 214509 ZPRClosed
      Aug 31, 2019 · 1012 GERRARD ST E
    • Zoning review19 182672 ZPRClosed
      Jul 4, 2019 · 1012 GERRARD ST E
    • Zoning review06 178702 LTOClosed
      Sep 26, 2006 · 1012 GERRARD ST E
    • Building permit06 154400Closed

      HVAC - Interior alterations to existing retail to convert to restauarnt with 80 seats. Convenience address 1018 Gerrard St E<<

      Aug 8, 2006 · 1012 GERRARD ST E
    • Building permit02 104043Closed

      make interior alteations for designated smoking area under mc chapter 709 for 8 occupants

      Feb 14, 2002 · 1012 GERRARD ST E
    • Zoning review98 026152 LTOClosed
      May 15, 1998 · 1018 GERRARD ST E
    • Zoning review97 025863 LTOClosed
      Jan 27, 1997 · 1012 GERRARD ST E
    • Zoning review95 024690 LTOClosed
      Feb 24, 1995 · 1014 GERRARD ST E
    • Zoning review92 025890 LTOClosed
      Aug 26, 1992 · 1018 GERRARD ST E
    • Zoning review91 026970 LTOClosed
      Oct 16, 1991 · 1016 GERRARD ST E
    • Zoning review89 029876 LTOClosed
      Mar 15, 1989 · 1014 GERRARD ST E
    • Zoning review86 028430 LTOClosed
      Oct 15, 1986 · 1012 GERRARD ST E
    • Zoning review86 028291 LTOClosed
      Aug 6, 1986 · 1012 GERRARD ST E
    • Zoning review86 028009 LTOClosed
      Apr 10, 1986 · 1012 GERRARD ST E
    • Zoning review81 030273 LTOClosed
      May 12, 1981 · 1014 GERRARD ST E

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    944 m²
    Frontage
    28.7 m
    Depth
    33.2 m
    Street
    Gerrard St E
    Corner lot
    Yes, also on Marjory Ave33.2 m along it
    Public lane
    None
    House footprint
    495 m²roof up to 6.8 m
    Back yard
    0.1 mhouse to rear lot line
    Side yards
    0 m and 0.2 mhouse to side lot lines; 0 is a shared wall
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: ash, white autumn applause (34 cm), ash, white autumn applause (32 cm), elm (8 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    88%38 of 43 decisions
    Garden suite permits
    0
    Laneway suite permits
    6
    Multiplex permits
    9
    Development applications
    1

    Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 43 variance decisions: more than at 78% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit and maintain the existing front porch enclosure of the three-storey semi-detached dwelling, which was constructed beyond the limits of the approved building permit (24 150571 BLD 03 SR). There is a total of two residential dwelling units on this lot (one unit occupying the basement and first levels, and one unit occupying the second and third levels).

      22 BADGEROW AVE · Oct 21, 2026 · 365 m away
    • Minor varianceApproved

      To alter the existing two-storey detached dwelling by constructing a complete third storey addition, and a rear three-storey addition with a front covered porch, a rear basement walkout, a rear ground floor deck with stairs, and two rear juliet balconies. Also, to construct a new rear one-storey ancillary building (one-car garage), abutting Dundas Street East. There will be a total of two residential dwelling units on this lot (one unit occupying the basement level, and one unit occupying the first, second, and third levels).

      99 DAGMAR AVE · Oct 7, 2026 · 364 m away
    • Minor varianceRefused

      To construct a new six-storey apartment building (cantilevered at the northwest corner and rear (south) portions of the building) with a front covered porch, ground floor front and rear entrance landings with stairs (located at the west side of the building), front balconies on the second to fifth storeys, and a mechanical penthouse with equipment screening on the roof of the sixth storey. There will be one vehicular visitor parking space and seven long-term bicycle parking spaces provided in the rear yard (located below the cantilevered portion of the building abutting the laneway). There will be a total of seven residential dwelling units on this lot.

      1111 GERRARD ST E · Sep 9, 2026 · 336 m away
    • Minor varianceApproved

      To alter the existing one-storey detached dwelling by constructing a rear ground floor addition and a rear deck with stairs.

      12 AUDLEY AVE · Aug 5, 2026 · 402 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (above the rear two-storey portion of the dwelling) and underpinning the basement. Also, to install a ground-mounted air-conditioning device in the front yard.

      77 GALT AVE · Jul 22, 2026 · 152 m away

    Latest activity nearby

    • Building permit

      Proposal to replace the existing interior basement stairs.

      11 EGAN AVE · Nov 20, 2026 · 262 m away
    • Building permit

      Proposal for Interior Alterations

      955 GERRARD ST E · Nov 20, 2026 · 176 m away
    • Building permit

      Proposed interior alterations to an existing townhouse to create a bathroom and laundry/mechanical room in the basement and construction of a new front porch roof. Load-bearing walls removal, new kitchen on main floor, etc.

      23 EGAN AVE · Nov 12, 2026 · 295 m away
    • Building permitdemolition

      Proposal to demolish existing dwelling and construct a new three storey four unit dwelling.

      14 BUSHELL AVE · Nov 12, 2026 · 298 m away
    • Building permit

      Interior alteration to existing restaurant to convert it to Nightclub LLC

      1045 GERRARD ST E · Nov 2, 2026 · 135 m away
    • Building permit

      PROPOSED PARTY WALL ADMIN PERMIT RELATED TO 35 GALT AVE

      33 GALT AVE · Oct 22, 2026 · 243 m away
    • Building permitmultiplex, new building, new house

      Proposal to construct a new three storey four unit dwelling complete with a basement walkout, rear yard deck and balconies.

      14 BUSHELL AVE · Oct 14, 2026 · 298 m away
    • Building permit

      REV 01: Revision to permit to include garage relocation and overhang changes, as bubbledNEW DETACHED GARAGE IN REAR YARD

      6 BUSHELL AVE · Oct 1, 2026 · 295 m away
    • Building permit

      Fire alarm system.

      1045 GERRARD ST E · Sep 24, 2026 · 135 m away
    • Building permitmultiplex, secondary suite

      Basement underpinning - new basement apartment - rear 2nd and 3rd floor additions over existing 1 storey, interior alterations, new front walkout- CONVERTING TO A DUPLEX

      293 PAPE AVE · Sep 24, 2026 · 289 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    Pape Station21 min walk
    Nearest TTC stop
    Gerrard St East at Marjory Ave1 min walk
    Nearest cycling route
    Jones AveBike Lane, 3 min walk
    Nearest traffic count
    8,796 vehicles in 8 hGerrard St E / Marjory Ave, 40 m away, May 15, 2017
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 1 with cyclists
    Parks
    Matty Eckler Playground1 min walk
    Badgerow Parkette7 min walk
    Hideaway Park7 min walk

    Schools within 1 km

    • RIVERDALE COLLEGIATE INSTITUTE English Public 4 min walk
    • BLAKE ST JR & EAST ALTERNATIVE English Public 5 min walk
    • PAPE AVENUE JR PUBLIC SCHOOL English Public 6 min walk
    • BON BERGER CATHOLIC ELEMENTARY SCHOOL French Separate 7 min walk
    • LESLIEVILLE JR PUBLIC SCHOOL English Public 8 min walk
    • ST JOSEPH CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.