Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 open orders or by-law investigations
Needs a closer lookNot resolved in the City's records: 26 225697 PRS 00 IV (Notice Issued Prop Standards: The property is not maintained and/or kept clean in accor..., 2026, status Notice Issued); 26 200879 PRS 00 IR (Property Standards, 2026, status Notice Issued).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations8 development applications open within 300 m
Good to know8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
33 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 206170 GRA 00 IRClosed
Graffiti
Jul 21, 2026 · 1011 DUFFERIN ST - By-law investigation26 225697 PRS 00 IVNotice Issued
Notice Issued Prop Standards: The property is not maintained and/or kept clean in accordance with the standards.; The yards and /or other part of property is not being kept clean and free from accumulation of junk, rubbish, brush, refuse, litter, garbage and/or other debris
Jul 13, 2026 · 1011 DUFFERIN ST - By-law investigation26 200879 PRS 00 IRNotice Issued
Property Standards
Jul 13, 2026 · 1011 DUFFERIN ST - By-law investigation26 166357 GRA 00 IRNotice Issued
Graffiti
May 25, 2026 · 1011 DUFFERIN ST - By-law investigation25 250697 WST 00 IRClosed
Waste
Nov 6, 2025 · 1011 DUFFERIN ST - By-law investigation25 173571 WST 00 IRClosed
Waste
Jun 7, 2025 · 1011 DUFFERIN ST - By-law investigation25 211513 GRA 00 IVClosed
Notice Issued Graffiti
Apr 10, 2025 · 1011 DUFFERIN ST - By-law investigation25 143024 GRA 00 IRClosed
Graffiti
Apr 10, 2025 · 1011 DUFFERIN ST
Show 25 older records
- By-law investigation25 108802 WST 00 IRClosed
Waste
Jan 24, 2025 · 1011 DUFFERIN ST - Zoning review24 201457 LTOClosedAug 21, 2024 · 1011 DUFFERIN ST
- Zoning review24 189899 LTOClosedJul 30, 2024 · 1011 DUFFERIN ST
- Zoning review19 107839 LPRClosedJan 23, 2019 · 1011 DUFFERIN ST
- Zoning review16 147997 LPRClosedApr 29, 2016 · 1011 DUFFERIN ST
- Building permit15 160342Closed
Install 1 1/2" back flow preventer
May 22, 2015 · 1011 DUFFERIN ST - Zoning review14 212860 LTOClosedAug 27, 2014 · 1011 DUFFERIN ST
- Zoning review12 283229 LPRClosedNov 22, 2012 · 1011 DUFFERIN ST
- Building permit11 265347Cancelled
To erect and display two overhanging structure signs and one wall sign, all static copy, in conjunction with an existing dollar store operating on the premises.**Buck or Two**
Aug 29, 2011 · 1011 DUFFERIN ST - Zoning review11 243170 LTOClosedJul 21, 2011 · 1011 DUFFERIN ST
- Building permit10 114525Closed
This is for the construction activity related to the underground passageway up to the extent of the existing concourse of the station. This also includes the construction of a canopy on the east side of Dufferin Street and modernization of the TTC entrance and underground passageway. There will be new second exits from each platform to Russett Avenue and increasing the safety of the station operations.
Jul 7, 2010 · 1011 DUFFERIN ST - Zoning review10 175393 LTOClosedMay 14, 2010 · 1011 DUFFERIN ST
- Zoning review08 113523 LTOClosedFeb 25, 2008 · 1011 DUFFERIN ST
- Zoning review07 252007 LTOClosedAug 10, 2007 · 1011 DUFFERIN ST
- Zoning review06 108366 ZPUClosedFeb 8, 2006 · 1011 DUFFERIN ST
- Zoning review02 141676 LTOClosedJun 3, 2002 · 1011 DUFFERIN ST
- Zoning review02 140713 LTOClosedMay 30, 2002 · 1011 DUFFERIN ST
- Zoning review01 013001 LTOClosedJul 23, 2001 · 1011 DUFFERIN ST
- Zoning review99 021881 LTOClosedFeb 4, 1999 · 1011 DUFFERIN ST
- Building permit94 021060Closed
CONSTRUCT ONE STOREY ADDITION (TTC KIOSK) ON EAST SIDE FOR TAKEOUT PURPOSES AT GROUND FLOOR LEVEL LP
Mar 6, 1995 · 1011 DUFFERIN ST - Zoning review94 025660 LTOClosedNov 29, 1994 · 1011 DUFFERIN ST
- Zoning review92 025070 LTOClosedJan 15, 1992 · 1126 BLOOR ST W
- Zoning review90 028661 LTOClosedJul 18, 1990 · 1122 BLOOR ST W
- Zoning review84 026848 LTOClosedSep 19, 1984 · 1122 BLOOR ST W
- Zoning review83 025962 LTOClosedJun 16, 1983 · 1130 BLOOR ST W
Check before you build
Site-specific exception 900.11.10(1579)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86.
- Older by-law A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86.
Lot facts
- Area
- 1,170 m²
- Frontage
- 34.1 m
- Depth
- 34.7 m
- Street
- Dufferin St
- Corner lot
- Yes, also on Bloor St W34.7 m along it
- Public lane
- Ln N Bloor E Dufferin, 43 m along it
- House footprint
- 823 m²roof up to 16 m
- Back yard
- 0.7 mhouse to rear lot line
- Side yards
- 0.3 m and 2.7 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 16 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dufferin. The lot is inside the Dufferin Major Transit Station Area approved by the Province (Site and Area Specific Policy 658). Source
- Zone CR 3.0 (c1.0; r2.0) SS2 (x1579) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm, homestead (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 90%45 of 50 decisions
- Garden suite permits
- 6
- Laneway suite permits
- 19
- Multiplex permits
- 20
- Development applications
- 17
Within 300 m, last 10 years. 45 suite and multiplex permits: more than at 98% of Toronto houses (median 3). 50 variance decisions: more than at 85% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for a mixed-use building (as approved under Site Specific Zoning By-law 604-2022 ), by increasing the overall building height, density, and number of storeys from 11 to 13 storeys. Also, to reduce the development standards for required amenity space from 468 m2 to 453 m2, to reduce the required number of resident parking spaces from 52 to 42, and to alter the required dimensions of bicycle parking spaces.
980 BLOOR ST W · Mar 27, 2024 · 452 m away - Minor varianceApproved
To alter the development standards under Site Specific Zoning By-Law 700-2021 (OLT) for the approved mixed-use redevelopment, with respect to the above-grade building permits, as well as the construction of the development block, public street, and municipal services.
1141 BLOOR ST W · Dec 13, 2023 · 152 m away - Minor varianceApproved
To permit the existing parking deficiency and to permit a north side yard setback deficiency for the existing commercial building (Dufferin Mall).
900 DUFFERIN ST · Feb 23, 2022 · 488 m away - Minor varianceApproved
To permit the existing parking deficiency and to permit a rear yard setback deficiency for the existing commercial building (Dufferin Mall).
900 DUFFERIN ST · Feb 23, 2022 · 488 m away - Minor varianceApproved
To construct a detached double car garage at the rear of the existing two-storey mixed-use building.
1190 BLOOR ST W · Mar 17, 2021 · 242 m away
Latest activity nearby
- Building permit
Proposed reinstate the existing decrepit concrete steps below grade
1108 DUFFERIN ST · Nov 24, 2026 · 255 m away - Zoning review
Closed
1084 BLOOR ST W · Nov 6, 2026 · 107 m away - Building permit
Interior alterations for a proposed new take out restaurant.
980 DUFFERIN ST · Nov 4, 2026 · 155 m away - Building permit
Revision No.1:PROPOSED RESIDENTIAL SIXPLEX(BASEMENT+3 STOREY)
999 DUFFERIN ST · Nov 2, 2026 · 102 m away - Zoning review
Closed
1108 BLOOR ST W · Oct 27, 2026 · 27 m away - Zoning review
Notice Sent
1101 BLOOR ST W · Oct 23, 2026 · 91 m away - Building permit
Proposed multiple projects including interior alterations for load-bearing wall removal at ground floor, kitchen & second-floor, and underpinning.
1106 DUFFERIN ST · Oct 23, 2026 · 250 m away - Zoning review
Notice Sent
53 BARTLETT AVE · Oct 22, 2026 · 258 m away - Zoning review
Closed
1106 BLOOR ST W · Oct 15, 2026 · 29 m away - Building permit
Proposal for two Maglocks
1141 BLOOR ST W · Oct 8, 2026 · 152 m away
Neighbourhood: Dovercourt Village
About the area around the lot, not the lot itself.
- Nearest station
- Dufferin Station1 min walk
- Nearest TTC stop
- Dufferin St at Bloor St West - Dufferin Station1 min walk
- Nearest cycling route
- Bloor St WCycle Track, 1 min walk
- Nearest traffic count
- 24,884 vehicles in 14 hDufferin St / Bloor St W, 40 m away, Oct 27, 2026
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 3 with cyclists
- Parks
- Salem Parkette5 min walk
- Susan Tibaldi Parkette5 min walk
- Dufferin Grove Park6 min walk
Schools within 1 km
- BLOOR C.I. & ALPHA II ALTERNATIVE English Public 2 min walk
- ST MARY CATHOLIC ACADEMY SECONDARY SCHOOL English Separate 6 min walk
- ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
- PAULINE JR PUBLIC SCHOOL English Public 7 min walk
- ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
- DOVERCOURT JR PUBLIC SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Dovercourt Village | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $87,000 | $84,500 |
| Households that own their home | 55% | 54% |
| Population (2021) | 12,380 | 16,813 |
| Homes built in 1960 or before | 70% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Dovercourt Village | City median |
|---|---|---|
| Assault | 974.9 | 636.3 |
| Robbery | 68.6 | 69.5 |
| Auto theft | 129.5 | 192.6 |
| Theft over $5,000 | 22.9 | 46.1 |
| Break and enter | 236.1 | 172.8 |
| Theft from vehicles | 144.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.