HousePrecheckCheck an address

101 Thorncliffe Park DrToronto · zoning, lot size and permit records

65.5 × 42.7 m2,794 m²on Thorncliffe Park Dr

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 10 268712 (FS - Sprinkler Shop Drawing - Int. Alt. to Office - Sisters of St. Joseph of Toronto, 2011). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N20 m
65.5 m frontage42.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 10 268712 (FS - Sprinkler Shop Drawing - Int. Alt. to Office - Sisters of St. Joseph of Toronto, 2011).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit11 246826Closed

    Water service for new sprikler system - Sisters of St Joseph of Toronto.

    Aug 23, 2011 · 101 THORNCLIFFE PARK DR
  • Building permit11 193149Closed

    To erect and display one non-illuminated overhanging structure sign with static copy on the easterly facing building wall in conjunction with **Sister of St. Joseph**

    Aug 5, 2011 · 101 THORNCLIFFE PARK DR
  • Building permit11 189515Closed

    Sprinklers shop drawings for interconnected floor space within existing building.- Sisters of St. Josephs

    May 25, 2011 · 101 THORNCLIFFE PARK DR
  • Building permit10 268712Application On Hold

    FS - Sprinkler Shop Drawing - Int. Alt. to Office - Sisters of St. Joseph of Toronto

    Jan 11, 2011 · 101 THORNCLIFFE PARK DR
  • Building permit01 117141Closed

    Install fire alarm system.

    Mar 19, 2001 · 101 THORNCLIFFE PARK DR
  • Building permit01 110627Closed

    Make interior alterations to existing office bldg.

    Mar 1, 2001 · 101 THORNCLIFFE PARK DR

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,794 m²
Frontage
65.5 m
Depth
42.7 m
Street
Thorncliffe Park Dr
Corner lot
No
Public lane
None
House footprint
793 m²roof up to 7.6 m
Back yard
15.3 mhouse to rear lot line
Side yards
6.4 m and 7.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust (37 cm), honey locust (33 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a religious institution.

    45 OVERLEA BLVD · Nov 9, 2023 · 405 m away
  • Minor varianceApproved

    To construct a new Wheel Trans Access Hub Shelter.

    45 OVERLEA BLVD · Aug 1, 2019 · 405 m away
  • Minor varianceApproved

    To construct a new Wheel Trans Access Hub Shelter.

    60 OVERLEA BLVD · Jun 20, 2019 · 124 m away
  • Minor varianceApproved

    To introduce the following uses to existing shopping centre: Clinic, Business and Professional Office, Government Office, and Place of Assembly.

    45 OVERLEA BLVD · May 16, 2018 · 405 m away
  • Minor varianceApproved

    To construct interior alterations to Unit #2 of the existing building to permit a medical clinic use.

    45 OVERLEA BLVD · Sep 22, 2016 · 405 m away

Latest activity nearby

  • Building permit

    1 ground sign**MACEDONIAN ORTHODOX CATHEDRAL**

    76 OVERLEA BLVD · Nov 16, 2026 · 213 m away
  • Zoning review

    Closed

    60 OVERLEA BLVD · Oct 30, 2026 · 124 m away
  • Development application

    OPA & Rezoning Application proposes the development of a 50-storey mixed-use building providing residential, and commercial use at grade. The building will provide a total of 1,261 residential units, being a mix of bachelor - 3-bedroom units. The building will also provide non-res and a daycare at grade. A paved access from Thorncliffe Park Dr along the north property line will be provided, leading to 2 levels of below-grade parking, providing a total of 238 parking spaces; as well as 694 bicycle parking spaces. The proposed development provides a total GFA of 83,337.83 square metres and a FSI of 14.27. Additionally, the proposed development provides 2,810.79 square metres of indoor amenity space and 2,258.63 square metres of outdoor amenity space.

    60 OVERLEA BLVD · Oct 13, 2026 · 137 m away · City file
  • Building permit

    A proposal to erect and display 9 wall signs all displaying static copy.***WALMART***

    6 WILLIAM MORGAN DR · Sep 17, 2026 · 116 m away
  • Zoning review

    Closed

    62 OVERLEA BLVD · Aug 26, 2026 · 103 m away
  • Building permit

    Proposed underground parking garage repairs. Full overburden and waterproofing at the garage roof deck; ramp topping replacement; and targeted interior mastic asphalt repairs; replacing existing drains within the work areas; targeted injection waterproofing at leaking foundation wall cracks; andre-painting concrete surfaces and replacing traffic markings where affected by repairs.

    65 OVERLEA BLVD · Jun 26, 2026 · 173 m away
  • Zoning review

    Closed

    85 THORNCLIFFE PARK DR · Jun 3, 2026 · 266 m away
  • Building permit

    Proposal to erect a temporary tent on church property for festival.Date Erect: June 5th, 2026Date Tear Down: June 7th, 2026

    76 OVERLEA BLVD · Jun 1, 2026 · 213 m away
  • Building permit

    One third party ground sign for the JOLT charging station**JOLT**

    60 OVERLEA BLVD · Apr 16, 2026 · 124 m away
  • Building permit

    3 WALL SIGNS**DAWAT / TEHZEEB**

    60 OVERLEA BLVD · Mar 31, 2026 · 124 m away

Neighbourhood: Thorncliffe Park

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station17 min walk
Nearest TTC stop
Overlea Blvd at Thorncliffe Park Dr (East) West Side2 min walk
Nearest cycling route
Thorncliffe Park DrCycle Track, 2 min walk
Nearest traffic count
5,107 vehicles in 8 hPat Moore Dr / Thorncliffe Park Dr / Beth Nealson Dr, 90 m away, Jan 17, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
E.T. Seton Park3 min walk
R.V. Burgess Park7 min walk
Leaside Park10 min walk

Schools within 1 km

  • FRASER MUSTARD EARLY LEARNING ACADEMY English Public 6 min walk
  • THORNCLIFFE PARK PUBLIC SCHOOL English Public 6 min walk
  • VALLEY PARK MDL SCHOOL English Public 11 min walk
  • MARC GARNEAU COLLEGIATE INSTITUTE English Public 12 min walk
  • OVERLEA LINC English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThorncliffe ParkMedian neighbourhood
Median household income (2020)$67,000$84,500
Households that own their home14%54%
Population (2021)20,40016,813
Homes built in 1960 or before21%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThorncliffe ParkCity median
Assault638636.3
Robbery83.969.5
Auto theft377.7192.6
Theft over $5,00054.646.1
Break and enter104.9172.8
Theft from vehicles226.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.