HousePrecheckCheck an address

101 Marlee AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x546)36.3 × 51.0 m1,828 m²on Hopewell Avecorner, also on Marlee Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 58 rental units, built 1955More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 3 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 83 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Eglinton WestThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
36.3 m frontage51.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 145141 PRS 00 IR (Property Standards, 2026); 25 251505 HEA 00 IR (Adequate Heat, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 83 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 58 units, built 1955).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation26 145141 PRS 00 IRClosed

    Property Standards

    Apr 16, 2026 · 101 MARLEE AVE
  • By-law investigation25 251505 HEA 00 IRClosed

    Adequate Heat

    Nov 9, 2025 · 101 MARLEE AVE

Check before you build

  • Site-specific exception 900.2.10(546)

    Needs a closer look

    2 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(546)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, the replacement of any building existing as of February 28, 1977 having a height exceeding the height prescribed by this By-law is permitted, if the height of the new building does not exceed the height of the building being replaced; [TO: 438-86; 12 (1) 320]

  2. Rule B

    On the lands, an office of a physician or dentist is permitted, subject to the conditions that: (i) it is located in the basement or on the first floor of a detached dwelling that such physician or dentist uses as their private residence; and (ii) the principal entrance is from Bathurst St. [TO: 438-86; 12(2) 274]

By-law 569-2013, Chapter 900

Lot facts

Area
1,828 m²
Frontage
36.3 m
Depth
51 m
Street
Hopewell Ave
Corner lot
Yes, also on Marlee Ave51 m along it
Public lane
None
House footprint
820 m²roof up to 29.8 m
Back yard
4.2 mhouse to rear lot line
Side yards
4.9 m and 5.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Eglinton West. The lot is inside the Eglinton West Major Transit Station Area approved by the Province (Site and Area Specific Policy 716). Source
  • Zone R (d2.0) (x546) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, norway (28 cm), maple, norway (24 cm), catalpa, northern (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%25 of 27 decisions
Garden suite permits
7
Laneway suite permits
0
Multiplex permits
11
Development applications
5

Within 300 m, last 10 years. 18 suite and multiplex permits: more than at 86% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey detached dwelling with an integral garage, front porch and rear deck.

    118 WEMBLEY RD · Nov 12, 2026 · 441 m away
  • Minor varianceApproved

    To permit a home occupation - personal service shop use within the existing detached garage in the rear yard of the property.

    391 WHITMORE AVE · Oct 29, 2026 · 380 m away
  • Minor varianceApproved

    To construct a three-storey detached fourplex in conjunction with a two-storey laneway suite at the rear of the property.

    101 LIVINGSTONE AVE · Oct 15, 2026 · 478 m away
  • Minor varianceApproved

    To legalize and maintain the existing detached garage as re-constructed.

    405 WHITMORE AVE · Sep 3, 2026 · 431 m away
  • Minor varianceRefused

    To construct a new detached house with a rear terrace.

    416 RIDELLE AVE · Aug 20, 2026 · 337 m away

Latest activity nearby

  • Building permitgarden suite

    REV01: Proposed revision to existing permit 25 216635 BLD 00 SRPROPOSED NEW GARDEN SUITE (38.626m2 ABOVE GRADE, 38.626m2 BELOW GRADE)

    69 MARLEE AVE · Nov 20, 2026 · 140 m away
  • Building permit

    SECOND FLOOR ADDITION OVER EXISTING BUNGALOW AND ATTACHED GARAGE & REAR DECK

    57 FAIRLEIGH CRES · Nov 4, 2026 · 110 m away
  • Building permit

    To upgrade water service line from property to City's portion

    367 HOPEWELL AVE · Oct 1, 2026 · 282 m away
  • Zoning review

    Notice Sent

    22 BELGRAVIA AVE · Sep 25, 2026 · 212 m away
  • Building permit

    Proposal to demolish existing garage and construct a new detached 1 storey garage.

    35 PARK HILL RD · Sep 25, 2026 · 267 m away
  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing a second storey addition.

    57 FAIRLEIGH CRES · Aug 6, 2026 · 110 m away
  • Building permit

    Install outside Backwater Valve, no sump pump

    54 FAIRLEIGH CRES · Jun 12, 2026 · 57 m away
  • Zoning review

    Closed

    57 FAIRLEIGH CRES · May 14, 2026 · 110 m away
  • Building permitdemolition

    PROPOSED 3 STOREY SFD (GFA 414.32 m2; H=12M)

    56 PARK HILL RD · May 13, 2026 · 154 m away
  • Building permitnew building, new house

    PROPOSED 3 STOREY SFD (GFA 414.32 m2; H=12M)

    56 PARK HILL RD · May 13, 2026 · 154 m away

Neighbourhood: Forest Hill North

About the area around the lot, not the lot itself.

Nearest station
Cedarvale Station7 min walk
Nearest TTC stop
Marlee Ave at Roselawn Ave1 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
9,150 vehicles in 14 hMarlee Ave / Beltline Trl, 40 m away, May 29, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
Newgate Parkette5 min walk
Walter Saunders Memorial Park7 min walk

Schools within 1 km

  • WEST PREPARATORY JR PUBLIC SCHOOL English Public 10 min walk
  • STS COSMAS AND DAMIAN CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • THE VILLAGE SHUL SYNAGOGUE & SUPPLMENTARY SCHOOL Private 12 min walk
  • ST THOMAS AQUINAS CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • J R WILCOX COMMUNITY SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureForest Hill NorthMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home35%54%
Population (2021)12,29016,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleForest Hill NorthCity median
Assault412.3636.3
Robbery7.269.5
Auto theft72.3192.6
Theft over $5,00050.646.1
Break and enter159.1172.8
Theft from vehicles79.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.