HousePrecheckCheck an address

101 Lawton BlvdToronto · zoning, lot size and permit records

Residential · R (d2.0) (x906)≈ 37.4 × 70.3 m1,747 m²on Lawton Blvd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 5 storeys, 46 rental units, built 1934More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 19 256397 (Renovation of existing apartments 06 and 07 to combine the 2 units on floors 2-5, 2020, status Inspection); 11 105495 (This is for the removal of two structural columns within the courtyard area of this apa..., 2011, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 43 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 88 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 37.4 m frontage≈ 70.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 19 256397 (Renovation of existing apartments 06 and 07 to combine the 2 units on floors 2-5, 2020, status Inspection); 11 105495 (This is for the removal of two structural columns within the courtyard area of this apa..., 2011, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards, Zoning): 26 208497 ZON 00 IR (Zoning, 2026); 25 233962 PRS 00 IV (Order Issued Property Standards: Height of the guard for the exit stairs are less than..., 2025); 25 233955 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 43 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 88 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (5 storeys, 46 units, built 1934).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 208497 ZON 00 IRClosed

    Zoning

    Jul 24, 2026 · 101 LAWTON BLVD
  • By-law investigation25 233962 PRS 00 IVClosed

    Order Issued Property Standards: Height of the guard for the exit stairs are less than 1,070 millimetres around landings.; Height of the guard for the exit stairs are less than 920 millimetres measured vertically to the top of the guard from a line drawn through the outside edges of; Required guard does not prevent the passage of a sphere having a diameter more than 100 millimetres.; Required handrails on stairs or ramps are less than 865mm or more than 965mm high; The guard is designed that a member, attachment or opening located between 140 millimetres and 900 millimetres above the level being protected facilitates climb

    Oct 2, 2025 · 101 LAWTON BLVD
  • By-law investigation25 233955 PRS 00 IRClosed

    Property Standards

    Oct 2, 2025 · 101 LAWTON BLVD
  • Building permit19 256397Inspection

    Renovation of existing apartments 06 and 07 to combine the 2 units on floors 2-5

    Sep 15, 2020 · 101 LAWTON BLVD
  • Building permit11 105495Inspection

    This is for the removal of two structural columns within the courtyard area of this apartment building. The columns will be removed and structurally reinforced as per the structural drawings. architectural drawings have been provided for reference.

    Feb 3, 2011 · 101 LAWTON BLVD

Check before you build

  • Site-specific exception 900.2.10(906)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(906)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    A maximum of three attached dwelling units are permitted in a townhouse building . [TO: 438-86; 12(2) 142]

  2. Older by-law A

    Section 12(2) 262 of former City of Toronto By-law 438-86

1 part for other addresses
  • B On the odd numbered addresses of 111-145 Lawton Blvd., former City of Toronto by-law 574-79.
By-law 569-2013, Chapter 900

Lot facts

Area
1,747 m²
Frontage
37.4 mestimated, irregular lot
Depth
70.3 mestimated, irregular lot
Street
Lawton Blvd
Corner lot
No
Public lane
None
House footprint
751 m²roof up to 23.2 m
Back yard
24.6 mhouse to rear lot line
Side yards
0.2 m and 0.7 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x906) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: linden, littleleaf (68 cm), oak, white (3 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%29 of 31 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
5

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new front porch with canopy, a rear two-storey addition (with a rear second storey balcony), and a rear third storey rooftop deck. A rear portion of the existing third storey will be demolished.

    57 GORMLEY AVE · Nov 4, 2026 · 261 m away
  • Minor varianceApproved

    To permit additional uses within the existing two-storey non-residential detached building.

    8 LAWTON BLVD · Sep 9, 2026 · 331 m away
  • Minor varianceRefused

    To alter the existing three-storey detached dwelling (basement level is considered the first storey) by constructing a three-storey east side addition with a seven-car integral garage (four spaces on the basement level, and three spaces on the main level), a rear widened ground floor deck with stairs, a rear second floor covered balcony, and a new widened driveway. The existing driveway will be replaced with sod.

    85 GORMLEY AVE · Aug 12, 2026 · 365 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by reconstructing the rear first floor deck (balcony) with stairs, and to construct a rear at-grade stone patio.

    48 HEATH ST E · Jul 15, 2026 · 469 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a front two-storey addition (above existing garage located at the basement level), and to replace the existing rear deck with a new covered deck and stairs (including new stairs for the basement walkout).

    23 LONSDALE RD · Jun 10, 2026 · 242 m away

Latest activity nearby

  • Building permit

    Proposed rear patio and stairs.

    51 GORMLEY AVE · Nov 16, 2026 · 243 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new front porch with canopy, a rear two-storey addition (with a rear second storey balcony), and a rear third storey rooftop deck. A rear portion of the existing third storey will be demolished.

    57 GORMLEY AVE · Nov 4, 2026 · 261 m away
  • Building permit

    Proposed Renovations to an Existing Driveway and Front Yard Landscaping to an Existing Single Family Dwelling

    42 WALMSLEY BLVD · Oct 21, 2026 · 181 m away
  • Building permitnew building, new house, secondary suite

    REV01: EXISTING WEST SIDE FOUNDATION WALL TO REMAIN AND BE UNDERPINNED. ALL CHANGES HAVE BEEN BUBBLED AND ONLY REVISED PAGES HAVE BEEN INCLUDED.NEW 3 STOREY SFD W/ SECOND SUITE, NEW COVERED FRONT PORCH AND REAR DECK.SEE ALSO 26 178464 DEM and 26 152683 ZAP

    38 WALMSLEY BLVD · Oct 16, 2026 · 172 m away
  • Building permitdemolition

    Proposal to demolish the existing 2 storey SFD-detached dwelling.

    38 WALMSLEY BLVD · Oct 16, 2026 · 172 m away
  • Building permit

    Proposed interior alterations for interior cosmetic upgrades including washer/ dryer addition.No changes to existing HVAC system - no HVA permit required

    111 LAWTON BLVD · Oct 8, 2026 · 44 m away
  • Building permit

    Reivison Proposed construction of a second-storey addition over the existing garage.

    23 LONSDALE RD · Sep 29, 2026 · 242 m away
  • Building permit

    Proposed Vehicular Ramp Repairs.

    19 LASCELLES BLVD · Sep 23, 2026 · 195 m away
  • Building permit

    Rev 01 - addition of landscape stairs to original permit # 26-131632 BLD 00 SR New Porch in existing location

    5 DUGGAN AVE · Sep 16, 2026 · 64 m away
  • Building permit

    EXISTING REAR PATIO AND NEW STAIRS

    51 GORMLEY AVE · Sep 9, 2026 · 243 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
Davisville Station7 min walk
Nearest TTC stop
Yonge St at Merton St5 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
782 vehicles in 8 hLawton Blvd / Duggan Ave, 40 m away, Aug 11, 2022
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Lawton Parkette2 min walk
Kay Gardner Beltline Park3 min walk
Yorkminster Park Baptist Church Park5 min walk

Schools within 1 km

  • THE YORK SCHOOL - JR CAMPUS Private 4 min walk
  • UPPER CANADA COLLEGE SCHOOL Private 8 min walk
  • DAVISVILLE & SPECTRUM SCHOOL English Public 10 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 10 min walk
  • UPPER CANADA PREP SCHOOL Private 11 min walk
  • THE STUDY ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.