HousePrecheckCheck an address

101 Charles St EToronto · zoning, lot size and permit records

≈ 36.5 × 78.3 m1,726 m²on Jarvis Stcorner, also on Charles St E

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 19 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 36.5 m frontage≈ 78.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards, Zoning): 26 168298 PRS 00 IR (Property Standards, 2026); 26 144581 ZON 00 IR (Zoning, 2026); 26 190089 PRS 00 IV (Order Issued Property Standards: The floor and every appurtenance, surface cover and fi..., 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 19 development applications open within 300 m

    Good to know

    19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 168298 PRS 00 IRClosed

    Property Standards

    May 27, 2026 · 101 CHARLES ST E
  • By-law investigation26 144581 ZON 00 IRClosed

    Zoning

    Apr 15, 2026 · 101 CHARLES ST E
  • By-law investigation26 190089 PRS 00 IVClosed

    Order Issued Property Standards: The floor and every appurtenance, surface cover and finish is not maintained.

    Apr 14, 2026 · 101 CHARLES ST E
  • By-law investigation26 143777 PRS 00 IRClosed

    Property Standards

    Apr 14, 2026 · 101 CHARLES ST E
  • By-law investigation25 128289 ZON 00 IRClosed

    Zoning

    Mar 12, 2025 · 101 CHARLES ST E
  • Building permit16 127467Closed

    In conjunction with a multi-storey building on the premises with retail on the first storey, proposal to erect and display five illuminated wall signs displaying static copy on the first storey north and east elevations. The proposed signs are 0.31 metres vertically by 3.76 metres horizontally at a height of 3.6 metres above grade. **RABBA**

    Mar 30, 2016 · 101 CHARLES ST E
  • Building permit16 102493Closed

    Canopy EXTENT ION

    Feb 1, 2016 · 101 CHARLES ST E
  • Building permit09 179133Closeddemolition

    Demolition of this semi detached building. Refer to folder no. 08 177631 for more information on the proposed structure. Refer to demolition folder no. 09 179150 for more information.

    Nov 23, 2009 · 101 CHARLES ST E
Show 1 older records
  • Development application08 111493 STE 27 OZClosed

    Rezoning application for demolition of existing non residential buildings for one 44-storey mixed use development containing 465 residential dwelling units, (285 one bedroom ,180 two bedroom) and retail uses at grade, complete with 373 parking spaces in levels of parking below grade

    Feb 14, 2008 · 101 CHARLES ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,726 m²
Frontage
36.5 mestimated, irregular lot
Depth
78.3 mestimated, irregular lot
Street
Jarvis St
Corner lot
Yes, also on Charles St E78.3 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 11 City trees in front of this lot. The City's street tree inventory lists 11 trees at this address: elm (14 cm), elm (12 cm), elm (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
85%11 of 13 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
7
Development applications
32

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 193 m away
  • Minor varianceApproved

    To permit 30 undersized/partially obstructed vehicular parking spaces within the existing underground parking garage (Parking Levels 1 to 5) of the 53-storey mixed-use building, which is currently under construction.

    603 SHERBOURNE ST · Nov 26, 2025 · 408 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1529-2019), for a new 56-storey mixed-use building (which is currently under construction), by increasing the gross floor area, the total number of dwelling units, and the building height(s) for Building E (145.5 m to 159 m). There will be a total of 600 residential dwelling units on this lot.

    591 SHERBOURNE ST · Sep 3, 2025 · 397 m away
  • Minor varianceApproved

    To facilitate the redevelopment of this site for a 51-storey mixed-use building, including the Parkland dedication requirement. This application is necessitated to modify Sections 4, 7, 16, and 24 under Appendix 1, Site Specific Zoning By-law 1528-2019, and Sections 4, 7, 15, and 23 under Schedule A, Site Specific Zoning By-law 1529-2019, which relates to the timing of conveyance and lease of the parklands and the construction for park improvements.

    601 SHERBOURNE ST · Jun 11, 2025 · 400 m away
  • Minor varianceApproved

    To permit the replacement of 4 new mechanical units.

    1 MOUNT PLEASANT RD · Apr 9, 2025 · 130 m away

Latest activity nearby

  • Building permit

    Proposal for interior alterations to replace existing indoor diesel life-safety generator with new rooftop natural gas life safety generator.

    77 HUNTLEY ST · Nov 18, 2026 · 274 m away
  • Building permit

    Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.

    1 MOUNT PLEASANT RD · Nov 18, 2026 · 130 m away
  • Building permit

    Proposal for interior alterations to an existing office space

    121 BLOOR ST E · Nov 10, 2026 · 289 m away
  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 193 m away
  • Building permit

    REV 01: Revision to permit to include two risers Proposal to replace heating riser.

    110 CHARLES ST E · Oct 20, 2026 · 59 m away
  • Building permit

    Office new fit out to accommodate new tenant. HVAC to reflect new ceiling.

    175 BLOOR ST E · Oct 15, 2026 · 200 m away
  • Building permit

    PROPOSED EXTERIOR WALL REPAIRS

    620 CHURCH ST · Oct 5, 2026 · 182 m away
  • Building permit

    Maglock Installation

    100 HAYDEN ST · Sep 9, 2026 · 138 m away
  • Building permit

    1 ILLUMINATED WALL SIGN ** ST. ANDREWS UNITED CHURCH **

    117 BLOOR ST E · Aug 28, 2026 · 288 m away
  • Building permit

    Proposed interior alterations to unit 1101 to expand existing boardroom and add two (2) small offices.

    175 BLOOR ST E · Aug 27, 2026 · 200 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station7 min walk
Nearest TTC stop
Bloor St East at Jarvis St3 min walk
Nearest cycling route
Bloor St ECycle Track, 4 min walk
Nearest traffic count
10,913 vehicles in 8 hMount Pleasant Rd / Jarvis St / Ted Rogers Way / Charles St E, 70 m away, Dec 10, 2022
Serious collisions within 500 m
132021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 6 with cyclists
Parks
Charles Street Parkette1 min walk
Barbara Hall Park4 min walk
Rosedale Ravine Lands5 min walk

Schools within 1 km

  • THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 4 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 5 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 5 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 7 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.