Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 25 121849 (For the construction of a new concrete pedestrian tunnel which will connect the existin..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications8 development applications open within 300 m
Good to know8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
2 records on file: more than at 72% of Toronto houses (median 0).
- Building permit25 121849Under Review
For the construction of a new concrete pedestrian tunnel which will connect the existing Dufferin TTC Station to the proposed development at 1141 Bloor St. W Block CMain Permit file - 22-218700 BLD NB
Feb 26, 2025 · 1006 DUFFERIN ST - Building permit17 280123Closed
Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - TTC Subway Station
Jan 29, 2018 · 1006 DUFFERIN ST
Check before you build
Site-specific exception 900.11.10(1746)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86
- Older by-law A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86
4 parts for other addresses
- B On the lands municipally known as 1140 Bloor St. W in 1980, section 12(1) 134 (viii) of former City of Toronto By-law 438-86
- C On 1140 Bloor St. W., 1 Dundas St. W., former City of Toronto by-law 294-79.
- B On the lands municipally known as 1140 Bloor St. W in 1980, section 12(1) 134 (viii) of former City of Toronto By-law 438-86
- C On 1140 Bloor St. W., 1 Dundas St. W., former City of Toronto by-law 294-79.
Lot facts
- Area
- 662 m²
- Frontage
- 35.9 mestimated, irregular lot
- Depth
- 79.5 mestimated, irregular lot
- Street
- Dufferin St
- Corner lot
- Yes, also on Bloor St W79.5 m along it
- Public lane
- Ln N Bloor W Dufferin, 87.3 m along it
- House footprint
- 96 m²roof up to 52.7 m
- Back yard
- 61.3 mhouse to rear lot line
- Side yards
- 9.9 m and 12.5 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- 16 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 92%44 of 48 decisions
- Garden suite permits
- 5
- Laneway suite permits
- 14
- Multiplex permits
- 13
- Development applications
- 18
Within 300 m, last 10 years. 32 suite and multiplex permits: more than at 95% of Toronto houses (median 3). 48 variance decisions: more than at 83% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards under Site Specific Zoning By-Law 700-2021 (OLT) for the approved mixed-use redevelopment, with respect to the above-grade building permits, as well as the construction of the development block, public street, and municipal services.
1141 BLOOR ST W · Dec 13, 2023 · 91 m away - Minor varianceApproved
To permit the existing parking deficiency and to permit a rear yard setback deficiency for the existing commercial building (Dufferin Mall).
900 DUFFERIN ST · Feb 23, 2022 · 479 m away - Minor varianceApproved
To permit the existing parking deficiency and to permit a north side yard setback deficiency for the existing commercial building (Dufferin Mall).
900 DUFFERIN ST · Feb 23, 2022 · 479 m away - Minor varianceApproved
To alter an existing two-storey mixed-use building, containing one dwelling unit, into a three-storey mixed-use building containing two dwelling units by constructing: a third storey addition, a rear three-storey addition, and a rooftop terrace. Two rear parking spaces are proposed.
1245 BLOOR ST W · Aug 4, 2021 · 432 m away - Minor varianceApproved
To construct a detached double car garage at the rear of the existing two-storey mixed-use building.
1190 BLOOR ST W · Mar 17, 2021 · 141 m away
Latest activity nearby
- Building permit
Proposed reinstate the existing decrepit concrete steps below grade
1108 DUFFERIN ST · Nov 24, 2026 · 239 m away - Building permit
Proposal to construct an attached roof above an existing deck in rear yard.
661 BROCK AVE · Nov 18, 2026 · 221 m away - Building permit
Interior renovation for a noodle restaurant, including building plumbing and HVAC work
90 CROATIA ST · Nov 12, 2026 · 243 m away - Zoning review
Closed
1084 BLOOR ST W · Nov 6, 2026 · 211 m away - Building permit
Interior alterations for a proposed new take out restaurant.
980 DUFFERIN ST · Nov 4, 2026 · 156 m away - Zoning review
Closed
634 BROCK AVE · Nov 2, 2026 · 232 m away - Building permit
Revision No.1:PROPOSED RESIDENTIAL SIXPLEX(BASEMENT+3 STOREY)
999 DUFFERIN ST · Nov 2, 2026 · 143 m away - Zoning review
Closed
1108 BLOOR ST W · Oct 27, 2026 · 131 m away - Zoning review
Notice Sent
1101 BLOOR ST W · Oct 23, 2026 · 189 m away - Building permit
Proposed multiple projects including interior alterations for load-bearing wall removal at ground floor, kitchen & second-floor, and underpinning.
1106 DUFFERIN ST · Oct 23, 2026 · 234 m away
Neighbourhood: Junction-Wallace Emerson
About the area around the lot, not the lot itself.
- Nearest station
- Dufferin Station1 min walk
- Nearest TTC stop
- Bloor St West at Dufferin St West Side1 min walk
- Nearest cycling route
- Bloor St WCycle Track, 1 min walk
- Nearest traffic count
- 24,884 vehicles in 14 hDufferin St / Bloor St W, 90 m away, Oct 27, 2026
- Serious collisions within 500 m
- 82021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
- Parks
- Susan Tibaldi Parkette4 min walk
- Dufferin Grove Park6 min walk
- Salem Parkette6 min walk
Schools within 1 km
- BLOOR C.I. & ALPHA II ALTERNATIVE English Public 1 min walk
- PAULINE JR PUBLIC SCHOOL English Public 6 min walk
- ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
- ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
- ST MARY CATHOLIC ACADEMY SECONDARY SCHOOL English Separate 7 min walk
- DOVERCOURT JR PUBLIC SCHOOL English Public 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Junction-Wallace Emerson | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $84,000 | $84,500 |
| Households that own their home | 50% | 54% |
| Population (2021) | 23,180 | 16,813 |
| Homes built in 1960 or before | 40% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Junction-Wallace Emerson | City median |
|---|---|---|
| Assault | 720 | 636.3 |
| Robbery | 36 | 69.5 |
| Shootings | 3.6 | 10.5 |
| Auto theft | 108 | 192.6 |
| Theft over $5,000 | 32.4 | 46.1 |
| Break and enter | 230.4 | 172.8 |
| Theft from vehicles | 201.6 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.