HousePrecheckCheck an address

1001 Arrow RdToronto · zoning, lot size and permit records

Employment · EH 1.099.4 × 262.4 m24,277 m²on Arrow Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Signet ArrowThe City plans more homes around the station: good for transit, and more building over time.
N50 m
99.4 m frontage262.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    2 records on file: more than at 72% of Toronto houses (median 0).

    • Building permit23 158873Closed

      Proposal for interior alterations to an existing storage facility due to fire damage.

      Jul 19, 2023 · 1001 ARROW RD
    • Building permit10 105392Closed

      Installation of (1) backflow prevention device.

      Feb 17, 2010 · 1001 ARROW RD

    Lot facts

    Area
    24,277 m²
    Frontage
    99.4 m
    Depth
    262.4 m
    Street
    Arrow Rd
    Corner lot
    No
    Public lane
    None
    House footprint
    2,730 m²roof up to 7.6 m
    Back yard
    24.1 mhouse to rear lot line
    Side yards
    15.6 m and 53.3 mhouse to side lot lines
    Buildings on the lot
    12house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Major Transit Station Area: Signet Arrow. The lot is inside the Signet Arrow Major Transit Station Area approved by the Province (Site and Area Specific Policy 700). Source
    • Zone EH 1.0 (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
    • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, norway (33 cm), horsechestnut, baumanii (8 cm), ginkgo (8 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%2 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a vehicle dealership. A previous Comittee of Adjustment application (A0034/17EYK) approved variances relating to the use and parking.

      150 DEERHIDE CRES · Feb 9, 2023 · 368 m away
    • Minor varianceApproved

      To permit a Vehicle Dealership.

      29 PEMICAN CRT · Nov 7, 2019 · 189 m away
    • Minor varianceApproved

      To convert the existing building into a vehicle dealership.

      150 DEERHIDE CRES · Feb 23, 2017 · 368 m away
    • Minor varianceApproved

      To convert the existing industrial building into a place of worship through interior alterations.

      323 DEERHIDE CRES · Oct 2, 2014 · 402 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alterations including a mezzanine. Unit 3.

      29 PEMICAN CRT · May 19, 2026 · 189 m away
    • Minor varianceApproved

      To permit the temporary outdoor storage of equipment, materials, products and vehicles.

      1111 ARROW RD · Dec 4, 2025 · 191 m away
    • Building permit

      Proposal for interior alterations for structural bracing modifications to enlarge an existing interior wall opening.

      1000 ARROW RD · Oct 28, 2025 · 276 m away
    • Zoning review

      Closed

      1111 ARROW RD · Aug 18, 2025 · 191 m away
    • Building permit

      Restoration of overhead garage door, block foundation wall and man door.

      29 PEMICAN CRT · Jul 4, 2025 · 189 m away
    • Building permit

      Proposal to replace existing backflow prevention device and associates

      1100 ARROW RD · Apr 16, 2025 · 279 m away
    • Minor variancePending

      Cancelled

      1111 ARROW RD · Feb 27, 2025 · 191 m away
    • Zoning review

      Closed

      800 ARROW RD · Nov 19, 2024 · 222 m away
    • Zoning review

      Application On Hold

      789 ARROW RD · Sep 27, 2024 · 239 m away
    • Zoning review

      Closed

      789 ARROW RD · Aug 8, 2024 · 239 m away

    Neighbourhood: Humbermede

    About the area around the lot, not the lot itself.

    Nearest station
    Signet Arrow Station7 min walk
    Nearest TTC stop
    Arrow Rd at Pemican Crt North Side2 min walk
    Nearest cycling route
    Humber River Recreational Trl extensionMulti-Use Trail, 13 min walk
    Nearest traffic count
    8,463 vehicles in 8 hArrow Rd / Deerhide Cres (North), 150 m away, Feb 12, 2020
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Habitant Park9 min walk
    Firgrove Park12 min walk
    Lindylou Park13 min walk

    Schools within 1 km

    • THE AMBASSADORS OF GOD ACADEMY Private 3 min walk
    • THE AMBASSADORS OF GOD ACADEMY Private 3 min walk
    • WESTVIEW CENTENNIAL HIGH SCHOOL English Public 10 min walk
    • EMERY C.I. & EMERY EDVANCE ADULT LEARNING CENTRE English Public 10 min walk
    • MONSIGNOR FRASER COLLEGE - NORFINCH CAMPUS English Separate 14 min walk
    • FIRGROVE PUBLIC SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHumbermedeMedian neighbourhood
    Median household income (2020)$77,500$84,500
    Households that own their home46%54%
    Population (2021)16,95516,813
    Homes built in 1960 or before22%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHumbermedeCity median
    Assault990.9636.3
    Robbery71.569.5
    Shootings15.310.5
    Auto theft439.2192.6
    Theft over $5,00071.546.1
    Break and enter168.5172.8
    Theft from vehicles112.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.