Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2022
Needs a closer lookStill open in the City's records: 22 195841 (Sprinkler system upgrade for rack storage of an exposed Group APlastic Commodity based..., 2022, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 253900 (Proposal to install 2 backflow prevention devices, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
11 records on file: more than at 99% of Toronto houses (median 0).
- Building permit24 253128Closed
Revision 01: Revised drawings as per deficiency report. Proposal:- Install 3/4" DCVA backflow for premise isolation in warehouse northeast side.- Install 1/2" RP backflow for battery fill station by shipping office.
Jan 5, 2026 · 100 IRON ST - Building permit24 253135Closed
Revision 01: Revised drawings as per deficiencies report. Proposal:- Install 1/2" RP backflow for battery fill station by shipping office.
Nov 19, 2025 · 100 IRON ST - Building permit25 253900Inspection
Proposal to install 2 backflow prevention devices.
Nov 18, 2025 · 100 IRON ST - Building permit25 111834Closed
Proposed interior alterations for offices. And new horizontal exits between buildings (VN).
Mar 25, 2025 · 100 IRON ST - Building permit22 195841Inspection
Sprinkler system upgrade for rack storage of an exposed Group APlastic Commodity based on a Control Mode Specific Application (CMSA), sprinklerdesign approach. Including the installation of express main from existing fire pumps.
Nov 9, 2022 · 100 IRON ST - Building permit12 248004Closed
To install 1 Backflow Prevention Device to an existing warehouse, to a ground floor area by the Water Meter room.
Oct 31, 2012 · 100 IRON ST - Building permit12 247980Closed
To install 1 Backflow Prevention Device to an existing warehouse, to a ground floor area by the Water Meter room.
Oct 31, 2012 · 100 IRON ST - Building permit12 248061Closed
To install 2 Backflow Prevention Devices to an existing warehouse, to a ground floor area, to 2 separate Water Meters located at 2 separate Water Meter rooms.
Oct 31, 2012 · 100 IRON ST
Show 3 older records
- Building permit05 114487Closed
HVAC - Interior alterations to an existing warehouse facility to create a new office component. - Interior Alterations
Jul 18, 2005 · 100 IRON ST - Zoning review05 107918 LTOClosedFeb 10, 2005 · 100 IRON ST
- Building permit00 174538Closed
Mezzanine & Cafeteria Additions, Interior Alterations & Sprinklers to Industrial Building
Sep 21, 2000 · 100 IRON ST
Lot facts
- Area
- 88,620 m²
- Frontage
- 233.9 mestimated, irregular lot
- Depth
- 707.3 mestimated, irregular lot
- Street
- Iron St
- Corner lot
- No
- Public lane
- None
- House footprint
- 31,541 m²roof up to 11.8 m
- Back yard
- 186.2 mhouse to rear lot line
- Side yards
- 30 m and 53.3 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a Vehicle Sales and Vehicle Rental establishment.
145 BELFIELD RD · Jan 29, 2026 · 487 m away - Minor varianceApproved
To permit a vehicle dealership.
1040 MARTIN GROVE RD · Aug 29, 2024 · 314 m away - Minor varianceApproved
To permit a parking deficiency.
1120 MARTIN GROVE RD · Oct 24, 2019 · 357 m away - Minor varianceApproved
To construct a one-storey rear addition.
180 BELFIELD RD · Jul 5, 2018 · 474 m away - Minor varianceApproved
To construct a raised platform.
195 BELFIELD RD · May 10, 2018 · 363 m away
Latest activity nearby
- Building permit
Revision 01: Revised drawings as per deficiency report. Proposal:- Install 3/4" DCVA backflow for premise isolation in warehouse northeast side.- Install 1/2" RP backflow for battery fill station by shipping office.
100 IRON ST · Jan 5, 2026 · 46 m away - Building permit
Revision 01: Revised drawings as per deficiencies report. Proposal:- Install 1/2" RP backflow for battery fill station by shipping office.
100 IRON ST · Nov 19, 2025 · 46 m away - Building permit
Proposal to install 2 backflow prevention devices.
100 IRON ST · Nov 18, 2025 · 46 m away - Building permit
Proposed interior alterations for offices. And new horizontal exits between buildings (VN).
100 IRON ST · Mar 25, 2025 · 46 m away - Building permit
Sprinkler system upgrade for rack storage of an exposed Group APlastic Commodity based on a Control Mode Specific Application (CMSA), sprinklerdesign approach. Including the installation of express main from existing fire pumps.
100 IRON ST · Nov 9, 2022 · 46 m away - Development application
Draft Plan of Standard Condominimum to convert the existing industrial rental units into 25 condominium units.
1040 MARTIN GROVE RD · Sep 14, 2020 · 299 m away · City file - Building permit
To install 1 Backflow Prevention Device to an existing warehouse, to a ground floor area by the Water Meter room.
100 IRON ST · Oct 31, 2012 · 46 m away - Building permit
To install 1 Backflow Prevention Device to an existing warehouse, to a ground floor area by the Water Meter room.
100 IRON ST · Oct 31, 2012 · 46 m away - Building permit
To install 2 Backflow Prevention Devices to an existing warehouse, to a ground floor area, to 2 separate Water Meters located at 2 separate Water Meter rooms.
100 IRON ST · Oct 31, 2012 · 46 m away - Building permit
HVAC - Interior alterations to an existing warehouse facility to create a new office component. - Interior Alterations
100 IRON ST · Jul 18, 2005 · 46 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Etobicoke North GO Station24 min walk
- Nearest TTC stop
- Belfield Rd at Iron St7 min walk
- Nearest traffic count
- 11,832 vehicles in 8 hHwy 409 E Martin Grove Ramp / Martin Grove Rd, 410 m away, Jan 17, 2024
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Stoffel Drive Allotment Gardens14 min walk
Schools within 1 km
- QUEEN'S COLLEGIATE Private 13 min walk
- MADRESATUL BANAAT ALMUSLIMAAT SCHOOL Private 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.