HousePrecheckCheck an address

100 Haynes AveToronto · zoning, lot size and permit records

95.9 × 173.2 m15,384 m²on Haynes Avecorner, also on Assiniboine Rd

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
N50 m
95.9 m frontage173.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 132320 PRS 00 IRClosed

    Property Standards

    Mar 20, 2026 · 100 HAYNES AVE
  • By-law investigation26 127561 PRS 00 IRClosed

    Property Standards

    Mar 10, 2026 · 100 HAYNES AVE
  • Building permit24 223190Closed

    Part Permit - Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Mar 20, 2025 · 100 HAYNES AVE
  • Building permit24 253987Approved

    Combustible composite metal panel system, designated Alpolic/fr, an aluminum composite metal (ACM) panel system installed in limited areas on the exterior face of the building which exceeds 6 storeys will provide the level of performance required by 3.1.5.5.(1) & (2) of the 2012 OBC.

    Dec 27, 2024 · 100 HAYNES AVE
  • Building permit24 248922Approved

    This Alternative Solution proposes the installation of fire hose connections in the exit stairs at the main floor landings in lieu of hose stations in the corridors located within 5 m of the exits stairs. The inherent features of this design takes into consideration the provision of a safe staging area to commence firefighting with the 65 mm hose connections at the intermediate floor landings in the exit stairs, rather than using fire hose connections on another floor level. The proposed approach is consistent with NBC Division B requirement for the standpipe system to meet NFPA 14, and eliminates the need to run hoses through the exit stair from the floor level below, and reduces the number of doors to the exit stair that may be propped open during firefighting operations.The inherent building features combined with the proposed design of the standpipe system will not adversely impact Fire Department operations and allows for consistent and unhindered access to hose connections. In addition, a safe staging area is provided for firefighters that is consistent with the performance level required by the OBC. This approach is applied in jurisdictions across Canada where the NBC is adopted or amended, and is also applied within federally regulated buildings across Canada including in Ontario. As such, responding fire departments have familiarity with the proposed arrangement without requiring building specific knowledge, specialized training, or specialized tactics.The proposed Alternative Solution therefore is considered to provide a performance level that is at least equal to the performance level provided by the requirements prescribed in OBC Division B Article 3.2.9.4 and as such is compliant with the Ontario Building Code as stated in Division A Clause 1.2.1.1.(1)(b).(See attached report)

    Dec 10, 2024 · 100 HAYNES AVE
  • Development application24 171199 WET 07 SAClosed

    To permit the construction of Phase 3 of the Quad Subdivision (York University) with two eight-storey purpose built student residences comprising a total of 579 residence units. The proposed locations are at the NE and NW corner of Haynes Avenue and Assiniboine Road.

    Jun 27, 2024 · 100 HAYNES AVE · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
15,384 m²
Frontage
95.9 m
Depth
173.2 m
Street
Haynes Ave
Corner lot
Yes, also on Assiniboine Rd173.2 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    1
    Multiplex permits
    5
    Development applications
    1

    Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.

      14 BOAKE ST · May 28, 2026 · 147 m away
    • Minor varianceApproved

      To alter the existing building to contain a total of 7 dwelling rooms. The existing dwelling unit and secondary suite will be maintained.

      27 MANSUR TER · Feb 6, 2025 · 326 m away
    • Minor varianceApproved

      To permit an Crisis Care Shelter.

      26 MANSUR TER · Jul 28, 2022 · 337 m away
    • Minor varianceApproved

      To permit a secondary suite within the basement and first floor of the existing semi-detached dwelling.

      265 COOK RD · Jun 11, 2015 · 295 m away
    • Minor varianceApproved

      This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625 and Site Specific By-law 716-2003, as amended, to permit the construction of a new three storey semi detached dwelling on the above noted property (Lot #6L).

      30 KIDD TER · Oct 14, 2004 · 423 m away

    Latest activity nearby

    • Building permit

      Interior alterations to convert SFD to multi-tenant dwelling

      14 BOAKE ST · Nov 16, 2026 · 147 m away
    • Building permit

      Proposal for interior alteration of existing academic and office spaces for a new School of Medicine which includes Student Academic and Study Spaces, Clinical Simulation Rooms, and Administration and Office Suites.

      88 THE POND RD · Nov 16, 2026 · 224 m away
    • Building permitlaneway suite

      Proposal to convert the existing garage into a one storey laneway suite with no changes to building height or setbacks.

      375 ASSINIBOINE RD · Nov 2, 2026 · 261 m away
    • Building permitmultiplex

      Proposal to covert existing single family dwelling into fourplex (Unit # 4)

      332 COOK RD · Oct 21, 2026 · 194 m away
    • Building permitmultiplex

      Proposed interior alterations to convert existing SFD to 4 unit residential building

      324 COOK RD · Oct 15, 2026 · 187 m away
    • Minor varianceApproved

      To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.

      14 BOAKE ST · May 28, 2026 · 147 m away
    • Building permit

      Proposal for below grade stair.

      90 LEITCH AVE · Apr 8, 2026 · 253 m away
    • Building permitsecondary suite

      PROPOSAL FOR A SECOND UNIT IN BASEMENT, ONE(1) ENLARGED WINDOW IN BASEMENT AND ONE(1) EXISTING WINDOW REPLACE WITH SAME SIZE EGRESS WINDOW.

      301 COOK RD · Jan 22, 2026 · 232 m away
    • Building permit

      Proposal to construct a fire escape deck and ladder.

      324 COOK RD · Jan 21, 2026 · 187 m away
    • Building permitsecondary suite

      Proposal for secondary suite in basement and one new fire rated window in basement.

      20 BOAKE ST · Jan 5, 2026 · 129 m away

    Neighbourhood: York University Heights

    About the area around the lot, not the lot itself.

    Nearest station
    Sentinel Station14 min walk
    Nearest TTC stop
    Sentinel Rd at The Pond Rd South Side2 min walk
    Nearest cycling route
    Sentinel RdBike Lane, 2 min walk
    Nearest traffic count
    4,169 vehicles in 8 hAssiniboine Rd / Sentinel Rd, 110 m away, Jan 26, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Jack Evelyn Wiggins Park5 min walk
    Fred Young Park6 min walk
    175 the Pond Road Park7 min walk

    Schools within 1 km

    • SENECA COLLEGE (SENECA AT YORK CAMPUS) College 5 min walk
    • YORK U - KEELE CAMPUS University 8 min walk
    • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYork University HeightsMedian neighbourhood
    Median household income (2020)$76,000$84,500
    Households that own their home47%54%
    Population (2021)28,25516,813
    Homes built in 1960 or before14%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYork University HeightsCity median
    Assault1274.1636.3
    Robbery12869.5
    Shootings11.910.5
    Auto theft634.1192.6
    Theft over $5,000178.646.1
    Break and enter375.1172.8
    Theft from vehicles312.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.