HousePrecheckCheck an address

100 Harrison Garden BlvdToronto · zoning, lot size and permit records

146.1 × 66.8 m9,442 m²on Harrison Garden Blvd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.9 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 10 298396 (Installation of four electromagnetic locks on main floor, 2010, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 18 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
146.1 m frontage66.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2010

    Needs a closer look

    Still open in the City's records: 10 298396 (Installation of four electromagnetic locks on main floor, 2010, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 241665 ZON 00 IR (Zoning, 2026); 25 232734 ZON 00 IR (Zoning, 2025); 25 219613 ZON 00 IR (Zoning, 2025); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 18 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 241665 ZON 00 IRClosed

    Zoning

    Sep 22, 2026 · 100 HARRISON GARDEN BLVD
  • By-law investigation25 232734 ZON 00 IRClosed

    Zoning

    Sep 30, 2025 · 100 HARRISON GARDEN BLVD
  • By-law investigation25 219613 ZON 00 IRClosed

    Zoning

    Sep 3, 2025 · 100 HARRISON GARDEN BLVD
  • By-law investigation25 218897 ZON 00 IRClosed

    Zoning

    Sep 2, 2025 · 100 HARRISON GARDEN BLVD
  • By-law investigation25 162918 PRS 00 IRClosed

    Property Standards

    May 21, 2025 · 100 HARRISON GARDEN BLVD
  • By-law investigation25 131514 ZON 00 IRClosed

    Zoning

    Mar 19, 2025 · 100 HARRISON GARDEN BLVD
  • Zoning review24 100175 ZZUCancelled
    Jan 2, 2024 · 100 HARRISON GARDEN BLVD
  • Zoning review11 234857 ZSVClosed
    Jul 8, 2011 · 100 HARRISON GARDEN BLVD
Show 1 older records
  • Building permit10 298396Inspection

    Installation of four electromagnetic locks on main floor.

    Dec 15, 2010 · 100 HARRISON GARDEN BLVD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
9,442 m²
Frontage
146.1 m
Depth
66.8 m
Street
Harrison Garden Blvd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: maple, freeman armstrong (21 cm), maple, freeman armstrong (15 cm), maple, freeman armstrong (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%6 of 7 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing detached dwelling by constructing a new front porch in conjunction with alterations to the front yard landscaping.

    41 ANNDALE DR · Sep 17, 2026 · 427 m away
  • Minor varianceApproved

    The Revised proposal consists of a series of minor changes to Building B of the Oakburn North Development. Increased height of Building B, an increase in number of units and GFA, and reduced visitor parking. Please note, the application was deferred, on February 5, 2026, to allow the applicant to update materials and discuss w/ neighbours.

    12 OAKBURN CRES · Mar 26, 2026 · 210 m away
  • Minor varianceApproved

    To modify the existing convenience store through interior alterations and permit a restaurant use.

    4630 YONGE ST · Aug 28, 2025 · 499 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a detached garage.

    135 GLENDORA AVE · Mar 20, 2025 · 429 m away
  • Minor varianceRefused

    Proposal to construct a new dwelling.

    75 GLENDORA AVE · Aug 15, 2024 · 336 m away

Latest activity nearby

  • Building permit

    Proposal for fire alarm panel replacement

    3 EVERSON DR · Nov 5, 2026 · 195 m away
  • Building permit

    Proposal for fire alarm panel replacement

    5 EVERSON DR · Nov 3, 2026 · 220 m away
  • Building permit

    Proposal for extending an attached garage.

    122 UPPER CANADA DR · Sep 24, 2026 · 271 m away
  • Minor varianceApproved

    The Revised proposal consists of a series of minor changes to Building B of the Oakburn North Development. Increased height of Building B, an increase in number of units and GFA, and reduced visitor parking. Please note, the application was deferred, on February 5, 2026, to allow the applicant to update materials and discuss w/ neighbours.

    12 OAKBURN CRES · Mar 26, 2026 · 210 m away
  • Building permit

    Proposal for structural and fire damage restoration.

    3 EVERSON DR · Mar 2, 2026 · 195 m away
  • Building permit

    Proposed interior alterations in basement including adding washroom

    11 EVERSON DR · Feb 24, 2026 · 272 m away
  • Building permit

    Plumbing - Proposal for interior alterations to an existing SFD-detached dwelling.

    114 UPPER CANADA DR · Feb 6, 2026 · 223 m away
  • Building permit

    Proposed interior alterations to existing single family dwelling

    114 UPPER CANADA DR · Jan 13, 2026 · 223 m away
  • Building permit

    Proposed Balcony Repairs - Deck waterproofing and guard rail repairs: Units affected: #677, #667, #651, #645, #635, #629, #619, #6131, #603, #344, #334, #328, #318, #204, #214, #220, #230, #236, 246, #252, #262

    3 EVERSON DR · Dec 18, 2025 · 195 m away
  • Building permitnew building, new house

    REV01: Proposed revision for extending the recessed second-floor wall to flush with the main façade.Proposal to demolish existing dwelling and construct a two storey dwelling with rear deck, rear basement walk-out and integral garage.See also 23-190712 ZAP & 23-229838 NNY 15 MV

    85 UPPER CANADA DR · Dec 8, 2025 · 240 m away

Neighbourhood: Avondale

About the area around the lot, not the lot itself.

Nearest station
Sheppard-Yonge Station11 min walk
Nearest TTC stop
89 Upper Canada Dr3 min walk
Nearest cycling route
Glendora Park TrlMulti-Use Trail - Existing Connector, 8 min walk
Nearest traffic count
1,694 vehicles in 14 hHumberstone Dr / Everson Dr / Avondale Park Trl, 260 m away, Oct 1, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Avonshire Park1 min walk
Avonshire Parkette3 min walk
Avondale Park4 min walk

Schools within 1 km

  • TORONTO DISTRICT SCHOOL BOARD - OAKBURN CENTRE English Public 4 min walk
  • AVONDALE PUBLIC & AVONDALE ALTERNATIVE ELEMENTARY SCHOOL English Public 7 min walk
  • DON VALLEY ACADEMY SECONDARY SCHOOL Private 8 min walk
  • DUKE ACADEMY SECONDARY SCHOOL Private 8 min walk
  • FAIRMEADOW CENTRE English Public 10 min walk
  • RUTHERFORD PRIVATE SCHOOL AND DAYCARE Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAvondaleMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home58%54%
Population (2021)13,79016,813
Homes built in 1960 or before6%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAvondaleCity median
Assault508.3636.3
Robbery30.369.5
Auto theft66.6192.6
Theft over $5,00018.246.1
Break and enter108.9172.8
Theft from vehicles108.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.