HousePrecheckCheck an address

100 Edward StToronto · zoning, lot size and permit records

29.3 × 49.5 m1,435 m²on Elizabeth Stcorner, also on Edward Stbacks onto Barnaby Pl

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 16 136299 STE 27 SA (Site Plan Approval for mixed -use development plan consisting of two buildings over a c..., 2016). Larger work can mean noise and trucks next door; read what each one is for.
  • 17 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
29.3 m frontage49.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 16 136299 STE 27 SA (Site Plan Approval for mixed -use development plan consisting of two buildings over a c..., 2016).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    1 approved. A0454/18TEY (To construct a new 19-storey (Building 'A' - 100 Edward Street) and 22-storey (Building..., 2019); A0275/15TEY (To construct a new 22-storey and 19-storey mixed use condominium building located on se..., 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 17 development applications open within 300 m

    Good to know

    17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation25 134091 WST 00 IRClosed

    Waste

    Mar 24, 2025 · 100 EDWARD ST
  • Minor varianceA0454/18TEYRefused

    To construct a new 19-storey (Building 'A' - 100 Edward Street) and 22-storey (Building 'B' - 70 Edward Street & 636 Bay Street) mixed use condominium building located on seven-storey podiums connected at the second storey with five levels of below grade parking.

    Apr 17, 2019 · 100 EDWARD ST
  • Zoning review18 196484 ZPRClosed
    Jul 19, 2018 · 100 EDWARD ST
  • Zoning review16 136299 PSPClosed
    May 16, 2018 · 100 EDWARD ST
  • Development application16 136299 STE 27 SAAppeal Received

    Site Plan Approval for mixed -use development plan consisting of two buildings over a common underground garage.

    Apr 6, 2016 · 100 EDWARD ST · City file
  • Minor varianceA0275/15TEYApproved

    To construct a new 22-storey and 19-storey mixed use condominium building located on seven-storey podiums with four levels of below grade parking.

    May 13, 2015 · 100 EDWARD ST
  • Zoning review14 113115 ZPRClosed
    Feb 4, 2014 · 100 EDWARD ST
  • Building permit99 017361Closed

    SUPPLY AND INSTALL HVAC. REFER TO 414163 FOR PLANS.

    Jun 4, 1999 · 100 EDWARD ST
Show 1 older records
  • Building permit98 018569Closed

    CONSTRUCT 15 STOREY MIXED USE BUILBING CONTAINING 165 DWELLING UNITS. HOLD FOR SURVEY, SERVICES, ETC.. FEE $ 134220

    Jul 3, 1998 · 100 EDWARD ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,435 m²
Frontage
29.3 m
Depth
49.5 m
Street
Elizabeth St
Corner lot
Yes, also on Edward St49.5 m along it
Public lane
Barnaby Pl, 36.1 m along it
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    93%13 of 14 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    30

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

      332 YONGE ST · Oct 14, 2026 · 295 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

      130 ELIZABETH ST · Jan 14, 2026 · 81 m away
    • Minor varianceApproved

      To permit a place of amusement (arcade) use on this subject lot.

      247 YONGE ST · Jan 8, 2025 · 447 m away
    • Minor varianceApproved

      To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.

      203 DUNDAS ST W · Oct 16, 2024 · 250 m away
    • Minor varianceApproved

      To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)).

      363 YONGE ST · Nov 8, 2023 · 364 m away

    Latest activity nearby

    • Consent (lot split)Pending

      To obtain consent to sever the property into two lots and to create new easements/rights-of-way.

      123 EDWARD ST · Oct 2, 2027 · 158 m away
    • Building permit

      Proposal for replacement of existing windows of office floors from Level 2-24.

      700 BAY ST · Nov 24, 2026 · 200 m away
    • Building permit

      Proposal for interior demolition of existing office floors from Level 2 - 24.

      700 BAY ST · Nov 23, 2026 · 200 m away
    • Building permit

      Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

      655 BAY ST · Nov 19, 2026 · 179 m away
    • Building permit

      Proposed an interior alteration

      595 BAY ST · Nov 19, 2026 · 152 m away
    • Building permit

      Proposal for interior alterations for Suite 2105 &2103

      180 DUNDAS ST W · Nov 18, 2026 · 175 m away
    • Building permit

      Revision No.1: To change Occupancy Type to B1, No new constructionProposal for interior renovation to room 7A refresh mental health pod - 2hr rating and door/hardware replacement, 1 new toilet and 1 fire damper

      170 ELIZABETH ST · Nov 18, 2026 · 168 m away
    • Building permit

      INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO

      121 DUNDAS ST W · Nov 17, 2026 · 132 m away
    • Building permit

      Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

      686 BAY ST · Nov 17, 2026 · 119 m away
    • Building permit

      Mechanical retrofit to improve building energy efficiency including working in various building Mechanical rooms and roofs. Work will be done on the chilled water, heating water and glycol piping networks. Equipment will be updated and replaced including rooftop air-source heat pumps, heat recovery chillers, updated air handling equipment, and steam network modifications.

      124 EDWARD ST · Nov 9, 2026 · 150 m away

    Neighbourhood: Yonge-Bay Corridor

    About the area around the lot, not the lot itself.

    Nearest station
    St Patrick Station4 min walk
    Nearest TTC stop
    Bay St at Elm St2 min walk
    Nearest cycling route
    Bay StBike Lane, 1 min walk
    Nearest traffic count
    7,026 vehicles in 14 hEdward St / Elizabeth St, 40 m away, Jun 25, 2024
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
    Parks
    Larry Sefton Park4 min walk
    Trinity Square4 min walk
    College Park5 min walk

    Schools within 1 km

    • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 4 min walk
    • TMU - HEASLIP HOUSE University 7 min walk
    • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 8 min walk
    • CONTACT ALTERNATIVE SCHOOL English Public 8 min walk
    • OCAD UNIVERSITY - THE LEARNING ZONE University 8 min walk
    • OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-Bay CorridorMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home32%54%
    Population (2021)12,64516,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-Bay CorridorCity median
    Assault3361.1636.3
    Robbery300.169.5
    Homicide125.3
    Shootings1210.5
    Auto theft162.1192.6
    Theft over $5,000210.146.1
    Break and enter552.2172.8
    Theft from vehicles402.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.