HousePrecheckCheck an address

100 College StToronto · zoning, lot size and permit records

67.9 × 42.2 m2,852 m²on College St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 1 development application open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N20 m
67.9 m frontage42.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 236517 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation25 236517 PRS 00 IRClosed

    Property Standards

    Oct 7, 2025 · 100 COLLEGE ST
  • Building permit24 216420Closeddemolition

    Abatement and demolition of 6 storey above grade and 2 storey below grade, SOG and foundationwalls to remain. Drainage holes to be made on SOG. Voids to be backfilled with recycled materialsto match surrounding grade.

    Oct 22, 2024 · 100 COLLEGE ST
  • Building permit19 160876Closed

    rev 1: revision for changes to the west elevation to be 1h noncombustible wall with noncombustible cladding with 0 m limiting distance.Minor renovations to due to building demolition next door 112 College Street. ALSO REFER TO 19 160851 DEM 00 DM

    Mar 26, 2021 · 100 COLLEGE ST
  • Building permit17 103065Closed

    Proposed interior alterations to create new office space on the ground, second anf fifth floor

    Mar 9, 2017 · 100 COLLEGE ST
  • Building permit15 171770Closed

    modify emergency lighting system

    Jun 24, 2015 · 100 COLLEGE ST
  • Building permit12 269342Closed

    Proposal for interior alterations to the basement level and 2nd floor of the Banting Institute. This permit is in a different location than #12-231051

    Nov 9, 2012 · 100 COLLEGE ST
  • Building permit12 231051Closed

    Interior alterations to basement level of university building. University of Toronto - Banting Building.

    Aug 29, 2012 · 100 COLLEGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,852 m²
Frontage
67.9 m
Depth
42.2 m
Street
College St
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    4

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

      27 GROSVENOR ST · Jul 30, 2025 · 341 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

      510 YONGE ST · Mar 19, 2025 · 476 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 621-2012(OMB), amending By-law 438-86), for the lot containing an existing three-storey vacant Heritage building (John Irwin House, municipally known as 9 Greenville Street) and the adjacent mixed-use condominium building (municipally known as 15 Grenville Street), by increasing the maximum permitted non-residential Gross Floor Area on the lot. Also, to permit medical/dental office and clinic uses that would be located on the ground, second, and third levels as well as within the basement of the existing three-storey Heritage building (John Irwin House).

      9 GRENVILLE ST · Feb 19, 2025 · 391 m away
    • Minor varianceApproved

      To alter the development standards for the 32-storey and 46-storey, two-tower mixed-use development (approved under Site Specific Zoning By-Law 1096-2021), by extending the temporary use permission for an elevator, which has already been constructed, to provide loading access to the adjacent site at 25 Grosvenor Street for a further period of three years.

      27 GROSVENOR ST · Nov 27, 2024 · 341 m away
    • Minor varianceApproved

      To permit the increase of non-residential gross floor area on the ground floor of the 38-storey mixed-use building (as approved under Site Specific By-Law 1263-2017).

      480 YONGE ST · Nov 20, 2024 · 431 m away

    Latest activity nearby

    • Building permit

      Proposal for interior fit-out of new office space in existing office space.

      700 UNIVERSITY AVE · Nov 23, 2026 · 272 m away
    • Building permit

      POST-TENSIONED CABLE REPLACEMENT, LOCALIZED CONCRETE REPAIRS, NEW WATERPROOFING INSTALLATION

      201 ELIZABETH ST · Nov 20, 2026 · 219 m away
    • Building permit

      Interior alterations for a new medical office - Toronto Endoscopy Clinic - Unit 700

      790 BAY ST · Nov 19, 2026 · 195 m away
    • Building permit

      Interior demolition to the 3rd and 4th floors.

      77 GRENVILLE ST · Nov 18, 2026 · 163 m away
    • Building permit

      Interior fit-out of new office space to existing Group D occupancy on 16th floor.

      700 UNIVERSITY AVE · Nov 6, 2026 · 272 m away
    • Building permit

      Proposal for interior alterations to install 5 phone booths, sprinkler connections and new strobe lights

      777 BAY ST · Nov 2, 2026 · 259 m away
    • Zoning review

      Application Acceptable

      112 COLLEGE ST · Oct 29, 2026 · 71 m away
    • Building permit

      New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - site services

      790 BAY ST · Oct 29, 2026 · 195 m away
    • Building permit

      New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. -Standpipe/sprinkler

      790 BAY ST · Oct 29, 2026 · 195 m away
    • Building permit

      New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - Back flow preventer

      790 BAY ST · Oct 29, 2026 · 195 m away

    Neighbourhood: Bay-Cloverhill

    About the area around the lot, not the lot itself.

    Nearest station
    Queen's Park Station3 min walk
    Nearest TTC stop
    College St at Elizabeth St1 min walk
    Nearest cycling route
    College StCycle Track, 1 min walk
    Nearest traffic count
    17,220 vehicles in 14 hCollege St / Elizabeth St / Dr. Emily Stowe Way, 100 m away, Oct 9, 2025
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 2 fatal, 5 with pedestrians, 1 with cyclists
    Parks
    College Park5 min walk
    Opera Place6 min walk
    Queen's Park6 min walk

    Schools within 1 km

    • ORDE STREET JR PUBLIC SCHOOL English Public 6 min walk
    • ST JOSEPH'S COLLEGE SCHOOL English Separate 7 min walk
    • THE YMCA ACADEMY SECONDARY SCHOOL Private 7 min walk
    • RONALD MCDONALD HOUSE Private 8 min walk
    • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 8 min walk
    • SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBay-CloverhillMedian neighbourhood
    Median household income (2020)$58,400$84,500
    Households that own their home30%54%
    Population (2021)16,67016,813
    Homes built in 1960 or before4%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBay-CloverhillCity median
    Assault601.9636.3
    Robbery74.769.5
    Auto theft16.6192.6
    Theft over $5,00087.246.1
    Break and enter286.4172.8
    Theft from vehicles145.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.