Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2014
Needs a closer lookStill open in the City's records: 13 266012 (Proposal to construct a new (1) storey elementary school building on the same site as a..., 2014, status Work Not Started).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit23 185080Cancelled
Installation of a temporary 40'x120' tent east of the main Place of Worship building for use August 9th 2023 to August 15th 2023
Aug 6, 2023 · 100 CLAIREVILLE DR - Building permit13 266012Work Not Started
Proposal to construct a new (1) storey elementary school building on the same site as an existing place of worship.
Apr 25, 2014 · 100 CLAIREVILLE DR - Zoning review11 277365 PSPClosedSep 19, 2011 · 100 CLAIREVILLE DR
- Development application11 267807 WET 01 SAClosed
Proposal to construct a new (1) storey elementary school building on the same site as an existing place of worship.
Sep 1, 2011 · 100 CLAIREVILLE DR - Zoning review10 118708 ZPRClosedFeb 16, 2010 · 100 CLAIREVILLE DR
- Zoning review10 118707 ZPRClosedFeb 16, 2010 · 100 CLAIREVILLE DR
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 14,852 m²
- Frontage
- 121.7 m
- Depth
- 124.3 m
- Street
- Claireville Dr
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,629 m²roof up to 8.1 m
- Back yard
- 23.9 mhouse to rear lot line
- Side yards
- 33.7 m and 48.8 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: honey locust (47 cm), honey locust (46 cm), honey locust (44 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To create 17 additional parking spaces located at the front of the existing building.
41 CLAIREVILLE DR · Aug 1, 2024 · 434 m away - Minor varianceApproved
To construct a new loading facility on the north side of the existing industrial building.
330 HUMBERLINE DR · Apr 11, 2019 · 238 m away - Minor varianceApproved
To permit a parking deficiency for a Software Development and Processing use.
310 HUMBERLINE DR · Nov 22, 2018 · 305 m away - Minor varianceApproved
To construct a temporary workers residence/dormitory and a temporary storage structure in the south portion of the property. The dormitory will house foreign stone artisans, until such time that the specialized stone work for the place of worship and cultural centre has been completed. The storage building will house the stone and equipment.
61 CLAIREVILLE DR · Feb 3, 2005 · 265 m away - Minor varianceApproved
To legalize and to maintain the existing parking area in the front yard.
46 CLAIREVILLE DR · Jan 6, 2005 · 370 m away
Latest activity nearby
- Building permit
Proposed pre-fabricated storage metal building
93 CLAIREVILLE DR · Nov 19, 2026 · 101 m away - Zoning review
Closed
93 CLAIREVILLE DR · Nov 27, 2025 · 101 m away - Building permit
Installation of one 80'x220' temporary tent for a dining tent. Tent will be staked into the ground. Installation to begin June 28th And removal is scheduled for July 28th.
61 CLAIREVILLE DR · Jul 22, 2024 · 265 m away - Building permit
1 WALL SIGN**CAMPO EQUIPMENT**
93 CLAIREVILLE DR · Jun 14, 2024 · 101 m away - Building permit
1 wall sign**CAMPO EQUIPMENT**
93 CLAIREVILLE DR · May 14, 2024 · 101 m away - Building permit
Proposal for Interior Alteration of Front Office, Change Room & Cafeteria of Existing Warehouse Building.
123 CLAIREVILLE DR · Dec 15, 2023 · 229 m away - Building permit
Proposed installation of 2 temporary tents (20m x 20m clearspan - cert #14-219337 & 30m x 35m Losberger) at BAPS Shri Swarminarayan Mandir anchored with stakes for Diwali. Installation proposed for Nov 3, 2023 and removeal will begin on Nov 16, 2023.
61 CLAIREVILLE DR · Nov 14, 2023 · 265 m away - Zoning review
Closed
61 CLAIREVILLE DR · Sep 12, 2023 · 265 m away - Building permit
Installation of a temporary 40'x120' tent east of the main Place of Worship building for use August 9th 2023 to August 15th 2023
100 CLAIREVILLE DR · Aug 6, 2023 · 10 m away - Building permit
Install various temporary tents at BAPS Shri Swaminarayan Mandir for religious ceremony from May 8th, 2023 to July 13th 2023
61 CLAIREVILLE DR · May 12, 2023 · 265 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Westmore Station33 min walk
- Nearest TTC stop
- Claireville Dr at Huddersfield Rd2 min walk
- Nearest cycling route
- West Humber TrlMulti-Use Trail, 9 min walk
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Claireville Conservation Area6 min walk
- Trca Lands ( 1)7 min walk
- Humber Arboretum11 min walk
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.