HousePrecheckCheck an address

100 Carlton StToronto · zoning, lot size and permit records

28.7 × 50.4 m1,356 m²on Carlton Stcorner, also on Mutual St

Not a home

Le College Francais - Carlton Campus

The City's school locations place Le College Francais - Carlton Campus on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 18 139104 (Proposed replacement of sprinklers, backflow preventer and sprinkler riser with supervi..., 2018, status Permit Issued); 18 139125 (Proposed backflow preventors and domestic water entrance, 2018, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N20 m
28.7 m frontage50.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 18 139104 (Proposed replacement of sprinklers, backflow preventer and sprinkler riser with supervi..., 2018, status Permit Issued); 18 139125 (Proposed backflow preventors and domestic water entrance, 2018, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0019/04T (The applicant is seeking the consent of the Committee of Adjustment in order to create..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 128561Closed

    Proposal for interior alterations to existing changerooms to include additional private changing facilities & upgraded showers.

    Mar 27, 2026 · 100 CARLTON ST
  • By-law investigation25 211223 GRA 00 IVClosed

    Notice Issued Graffiti

    Jul 14, 2025 · 100 CARLTON ST
  • By-law investigation25 193761 GRA 00 IRClosed

    Graffiti

    Jul 14, 2025 · 100 CARLTON ST
  • Building permit22 133415Closed

    Proposal for interior & exterior alterations. Work includes:- ground, 2nd & 3rd floor level washroom renovations, - exterior window renovations to all windows, - level P1, P2 & P3 parking garage structural repairs &- boiler room upgrades, ventilator room & roof upgrades.

    May 24, 2022 · 100 CARLTON ST
  • Building permit18 139104Permit Issued

    Proposed replacement of sprinklers, backflow preventer and sprinkler riser with supervised valves.

    May 3, 2018 · 100 CARLTON ST
  • Building permit18 139125Inspection

    Proposed backflow preventors and domestic water entrance.

    May 1, 2018 · 100 CARLTON ST
  • Building permit15 180706Closed

    In conjunction with a school on the premises, proposal to erect and display one illuminated wall sign displaying static copy and readograph copy displayed electronically, on the first storey of the southerly elevation. The proposed sign is to measure 2.29 metres horizontally by 1.22 metres vertically at a height of 5. 49 metres. The portion of the sign displaying readograph copy is to measure 2.16 metres horizontally by 0.45 metres vertically. **COLLEGE FRANCAIS**

    Aug 14, 2015 · 100 CARLTON ST
  • Building permit15 137629Closed

    Minor interior alterations and upgrades to existing mechanical system.

    May 1, 2015 · 100 CARLTON ST
Show 5 older records
  • Building permit12 174626Closed

    Proposal to reinforce portion of roof for replacement of mechanical unit and new duct work in existing french school. "Le College Francais".

    Jun 27, 2012 · 100 CARLTON ST
  • Building permit11 230578Closed

    Plumbing stand alone permit to replace fixtures in existing elementry school

    Jul 7, 2011 · 100 CARLTON ST
  • Consent (lot split)B0019/04TApproved

    The applicant is seeking the consent of the Committee of Adjustment in order to create an easement over the a portion of the subject lands in favour of the adjacent site to the north know municipally as No. 281 Mutual Street. The new easement has a width of approimately 0.05 metres at the northwest corner of the property and relates to a wall of the parking garage at 281 Mutual Street which slightly encroaches onto 100 Carlton Street, and will permit maintenance of said encroachment.

    Nov 10, 2004 · 100 CARLTON ST
  • Zoning review03 159775 000Closed
    Jul 24, 2003 · 100 CARLTON ST
  • Building permit98 016172Closed

    REPLACE CONDENSING UNITS TO EXISTING ROOF-TOP AIR CONDITIONING UNITS. /LM

    May 6, 1998 · 100 CARLTON ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,356 m²
Frontage
28.7 m
Depth
50.4 m
Street
Carlton St
Corner lot
Yes, also on Mutual St50.4 m along it
Public lane
None
House footprint
1,278 m²roof up to 16 m
Back yard
4.6 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    94%15 of 16 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    17

    Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.

      185 GERRARD ST E · Oct 14, 2026 · 446 m away
    • Minor varianceApproved

      To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

      508 CHURCH ST · Sep 9, 2026 · 290 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

      311 SHERBOURNE ST · Jun 3, 2026 · 499 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

      20 MAITLAND ST · Apr 1, 2026 · 464 m away
    • Minor varianceApproved

      To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

      97 GRANBY ST · Oct 15, 2025 · 146 m away

    Latest activity nearby

    • Building permit

      1 Wall Sign***** T-DOT DENTAL*****

      306 JARVIS ST · Nov 17, 2026 · 126 m away
    • Zoning review

      Closed

      66 GERRARD ST E · Nov 9, 2026 · 291 m away
    • Zoning review

      Not Started

      66 GERRARD ST E · Nov 4, 2026 · 291 m away
    • Building permit

      REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

      355 CHURCH ST · Oct 30, 2026 · 242 m away
    • Building permit

      Proposal to install a maglock in existing office space.

      355 CHURCH ST · Oct 28, 2026 · 242 m away
    • Zoning review

      Closed

      140 CARLTON ST · Oct 27, 2026 · 229 m away
    • Building permit

      Layout changes + addition of a bathroom in units1A, 12, 24 & 25.

      134 CARLTON ST · Oct 23, 2026 · 203 m away
    • Zoning review

      Closed

      30 CARLTON ST · Oct 20, 2026 · 273 m away
    • Building permit

      Proposed storage addition on the parking area in the building

      105 CARLTON ST · Oct 15, 2026 · 65 m away
    • Building permit

      Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

      330 JARVIS ST · Oct 13, 2026 · 64 m away

    Neighbourhood: Church-Wellesley

    About the area around the lot, not the lot itself.

    Nearest station
    College Station8 min walk
    Nearest TTC stop
    Carlton St at Jarvis St1 min walk
    Nearest cycling route
    Gerrard St ECycle Track, 4 min walk
    Nearest traffic count
    16,597 vehicles in 14 hCarlton St / Jarvis St, 90 m away, Aug 22, 2026
    Serious collisions within 500 m
    132021–2026, killed or seriously injured: 1 fatal, 8 with pedestrians, 4 with cyclists
    Parks
    Allan Gardens2 min walk
    Montague Parkette3 min walk
    Joseph Sheard Parkette6 min walk

    Schools within 1 km

    • LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 1 min walk
    • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 1 min walk
    • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 2 min walk
    • NATIONAL BALLET SCHOOL Private 2 min walk
    • CHURCH ST JR & NATIVE LEARNING CTR English Public 3 min walk
    • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 3 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureChurch-WellesleyMedian neighbourhood
    Median household income (2020)$60,400$84,500
    Households that own their home24%54%
    Population (2021)22,32016,813
    Homes built in 1960 or before15%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleChurch-WellesleyCity median
    Assault1264.6636.3
    Robbery93.269.5
    Homicide3.35.3
    Auto theft46.6192.6
    Theft over $5,000106.546.1
    Break and enter146.4172.8
    Theft from vehicles206.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.