HousePrecheckCheck an address

10 York StToronto · zoning, lot size and permit records

Also 10 York St, 120 Harbour St, 130 Harbour St, 130 Harbour St

≈ 41.4 × 113.5 m2,418 m²on York Stcorner, also on Lake Shore Blvd W

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 3 development applications open within 300 m, up to 59 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 41.4 m frontage≈ 113.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 191559 PRS 00 IR (Property Standards, 2026); 25 115979 PRS 00 IR (Property Standards, 2025); 25 103874 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0662/13TEY (To amend Site Specific By-law 634-2013 and former City of Toronto By-law 438-86, to fac..., 2013).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 59 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

32 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 191559 PRS 00 IRClosed

    Property Standards

    Jun 25, 2026 · 130 HARBOUR ST
  • By-law investigation25 115979 PRS 00 IRClosed

    Property Standards

    Feb 11, 2025 · 130 HARBOUR ST
  • By-law investigation25 103874 PRS 00 IRClosed

    Property Standards

    Jan 13, 2025 · 130 HARBOUR ST
  • Building permit20 215807Closed

    Proposal to install 2 maglocks on the 68th municipal level.

    Nov 12, 2020 · 130 HARBOUR ST
  • Building permit20 139680Closed

    To erect and display one wall sign and one projecting sign, both illuminated and displaying static copy. Erected on the first storey of the south elevation of the building.****TIM HORTONS****

    Sep 30, 2020 · 10 YORK ST
  • Building permit19 257978Closed

    Proposed interior alterations in Unit 110 for 'Tim Hortons'Barrier-free washroom is existing and will remain.

    Dec 18, 2019 · 130 HARBOUR ST
  • Building permit13 195531Closednew building

    Proposal to construct a 66 sty + mechanical condo bulding with 5 levels of below grade parking, 694 residential units, and commercial. New Address - 10 York St (additional addresses 120, 130 Harbour Street and 10 York Street).

    Jun 20, 2018 · 130 HARBOUR ST
  • Building permit18 129678Closed

    Proposal for the installation of maglocks (9 single and 2 double)Municipal Parking Level B,Municipal Parking Level A,Grnd Shuttle parking Elevator lobby,Municipal flr 8 (5TH Flr pool), municipal Flr 63-65

    Apr 24, 2018 · 10 YORK ST
Show 24 older records
  • Building permit17 155307Approved

    Proposal that protection using 3M duct wrap be permitted to maintain the service shaft rating. Proposal to protect selected vertical and horizontal portions of standpipe risers with a fire rated wrap assembly having a 2H fire-resistance rating to provide the required 1 H fire separation, where they are not located within a stair or fire rated service space.

    May 6, 2017 · 10 YORK ST
  • Development application17 118568 STE 20 CDClosed

    Draft Plan of Condominium for newly-constructed mixed use building: 694 dwelling units, 296 parking spaces. Site Plan Application: 13 142067 STE 20 SA

    Feb 17, 2017 · 10 YORK ST · City file
  • Building permit16 142448Cancelled

    Revision 1 - Alternative Solution to replace copper piping with stainless steel (in connection to 13 195531 BLD).

    Sep 22, 2016 · 130 HARBOUR ST
  • Building permit16 227254Cancelled

    Alternative Solution to replace copper piping with stainless steel (in connection to 13 195531 BLD).

    Sep 22, 2016 · 130 HARBOUR ST
  • Building permit14 243766Approved

    Alternative solution for sprinklers and stand pipe systems.

    Oct 27, 2014 · 130 HARBOUR ST
  • Minor varianceA0662/13TEYApproved with conditions

    To amend Site Specific By-law 634-2013 and former City of Toronto By-law 438-86, to facilitate the construction of the approved development consisting of a 67-storey residential tower with a 4-storey podium containing 725 residential units and retail space on the ground floor.

    Oct 9, 2013 · 10 YORK ST
  • Zoning review13 206166 ZPRClosed
    Jul 18, 2013 · 130 HARBOUR ST
  • Zoning review13 145821 PSPClosed
    Apr 8, 2013 · 130 HARBOUR ST
  • Development application13 142067 STE 20 SAClosed

    Site Plan Approval for a mixed use development at 120, 130 Harbour Street and 10 York Street. The application is for a residential tower for 66 storeys wit a total of 694 dwelling units, retail at grade and a total of 289 parking spaces. This file is associated with the rezoning application under file 11-329885 STE 20 OZ and the City Initiated Official Plan Amendment under file 12-286844 STE 20 OZ.

    Mar 28, 2013 · 130 HARBOUR ST · City file
  • Zoning review12 266762 PRZClosed
    Oct 23, 2012 · 130 HARBOUR ST
  • Zoning review12 261293 ZSVClosed
    Oct 11, 2012 · 120 HARBOUR ST
  • Development application12 256067 STE 20 OZClosed

    Official Plan Amendment to reduce the right-of-way of Lake Shore Boulevard to less than 45 metres along the frontage of the site. This application is associated with file 11-329885 STE 20 OZ which is a rezoning application to construct a mixed use development at 120 and 130 Harbour Street and 10 York Street. The application is for a residential tower with a 4 storey podium and a proposed tower of approximately 65 storeys or 224 metres including mechanical (originally 75 storeys or 253.4 metres including mechanical penthouse) with a total of 725 dwelling units (originally 783 dwelling units) and retail at grade. There is also 4 levels of below grade parking (originally above grade in Floors 2 to 4 of the podium). The podium is to contain storage, mechanical and indoor and outdoor amenity space.

    Oct 1, 2012 · 130 HARBOUR ST
  • Zoning review12 106349 PRZClosed
    Aug 17, 2012 · 130 HARBOUR ST
  • Development application11 329885 STE 20 OZClosed

    Rezoning application to construct a mixed use development at 120 and 130 Harbour Street and 10 York Street. The application is for a residential tower with a 4 storey podium and a proposed tower of approximately 65 storeys or 224 metres including mechanical (originally 75 storeys or 253.4 metres including mechanical penthouse) with a total of 725 dwelling units (originally 783 dwelling units) and retail at grade. There is also 6 levels of below grade parking (originally above grade in Floors 2 to 4 of the podium). The podium is to contain storage, mechanical and indoor and outdoor amenity space.

    Dec 22, 2011 · 120 HARBOUR ST
  • Building permit11 308215Cancelled

    To erect and display one non-illuminated ground sign with static copy, at the easterly frontage of the premises and in conjunction with the sales and marketing of a new residenital condominium to be constructed.**Tridel**

    Nov 10, 2011 · 120 HARBOUR ST
  • Zoning review10 246261 ZPRClosed
    Aug 24, 2010 · 120 HARBOUR ST
  • Zoning review05 159813 ZSVClosed
    Jul 14, 2005 · 130 HARBOUR ST
  • Zoning review03 170723 ZPRClosed
    Aug 29, 2003 · 130 HARBOUR ST
  • Zoning review99 022024 LTOClosed
    Mar 1, 1999 · 10 YORK ST
  • Zoning review97 026298 LTOClosed
    May 7, 1997 · 10 YORK ST
  • Zoning review97 026297 LTOClosed
    May 7, 1997 · 10 YORK ST
  • Zoning review91 026731 LTOClosed
    Jul 12, 1991 · 10 YORK ST
  • Zoning review86 028164 LTOClosed
    Jun 2, 1986 · 10 YORK ST
  • Zoning review81 030556 LTOClosed
    Jul 31, 1981 · 10 YORK ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,418 m²
Frontage
41.4 mestimated, irregular lot
Depth
113.5 mestimated, irregular lot
Street
York St
Corner lot
Yes, also on Lake Shore Blvd W113.5 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.

    200 QUEENS QUAY W · Nov 12, 2025 · 77 m away
  • Minor varianceApproved

    To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.

    20 BAY ST · Jan 15, 2025 · 283 m away
  • Minor varianceApproved

    To permit the permanent operation of an outdoor patio (including the canopy) on the ground floor of the existing 54-storey mixed-use building.

    15 YORK ST · Dec 6, 2023 · 143 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.

    200 QUEENS QUAY W · Dec 6, 2023 · 77 m away
  • Minor varianceApproved

    To permit the increase of gaming machines within the existing entertainment complex building (The Rec Room).

    255 BREMNER BLVD · Nov 22, 2023 · 341 m away

Latest activity nearby

  • Building permit

    PROPOSED INTERIOR ALTERATION TO EXISTING OFFICE UNIT FOR INSURANCE OFFICE FITOUT - 11TH FLOOR

    25 YORK ST · Nov 24, 2026 · 260 m away
  • Building permit

    Proposal to construct a canopy at ground floor Galleria Entrance.

    25 YORK ST · Nov 24, 2026 · 260 m away
  • Building permit

    Rev 01: Revision to permitProposal to alter existing fire protection sprinkler system for new interior fit up on level 24 & 28 of an existing building.

    120 BREMNER BLVD · Nov 23, 2026 · 246 m away
  • Building permit

    REV03: Addition of new partition and door to enclose Cafe / Lunch Room area on east side of floor plan. REV02: Proposed revision of office layout scope of work as shown on submitted drawings. Interior Alterations: Extensive Renovation, demolition of all existing interior buildout, construction of new full floor office layout.Rev 01 - Office layout revisions throughout scope of work as shown on submitted drawingsProposal for interior alterations to existing office space on the 8th floor - Healthcare of Ontario Pension Plan

    1 YORK ST · Nov 23, 2026 · 60 m away
  • Building permit

    Proposal for interior alterations to fit out new office space

    88 QUEENS QUAY W · Nov 19, 2026 · 207 m away
  • Building permit

    Truss structure for outdoor lighting and sound equipment. - Install November 17, 2026 and Dismantle March 1, 2027

    235 QUEENS QUAY W · Nov 18, 2026 · 254 m away
  • Building permit

    Proposal for interior alterations within an existing office

    88 QUEENS QUAY W · Nov 18, 2026 · 207 m away
  • Building permit

    Proposed Interior alterations and partial change of use to convert a portion of existing office space into a coffee bar.

    18 YORK ST · Nov 18, 2026 · 250 m away
  • Building permit

    Proposal for interior alterations for a new layout for 2 office units

    20 BAY ST · Nov 16, 2026 · 283 m away
  • Building permit

    REVISION - HVAC REVISION AS PER SITE CONDITIONS AND INSPECTORS REQUESTHVAC - Proposal for interior alterations to existing offices on the third level.

    100 HARBOUR ST · Nov 9, 2026 · 167 m away

Neighbourhood: Harbourfront-CityPlace

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station5 min walk
Nearest TTC stop
Queens Quay West at Harbourfront Centre2 min walk
Nearest cycling route
Harbour StMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
27,167 vehicles in 14 hYork St / Harbour St, 50 m away, Jan 20, 2026
Serious collisions within 500 m
122021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 1 with cyclists
Parks
Love Park1 min walk
Toronto Waterfront Park3 min walk
Roundhouse Park3 min walk

2021 Census

FigureHarbourfront-CityPlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home40%54%
Population (2021)28,13516,813
Homes built in 1960 or before0%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHarbourfront-CityPlaceCity median
Assault883.3636.3
Robbery48.169.5
Homicide2.85.3
Shootings8.510.5
Auto theft56.6192.6
Theft over $5,00056.646.1
Break and enter141.6172.8
Theft from vehicles121.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.