HousePrecheckCheck an address

10 Wellesley PlToronto · zoning, lot size and permit records

Residential · R (d2.5) (x161)17.1 × 41.6 m707 m²on Wellesley Plcorner, also on Lourdes Lanebacks onto Lourdes Lane

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 167902 (Proposal to demolish chimney stack, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N10 m
17.1 m frontage41.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2007

    Needs a closer look

    Still open in the City's records: 04 176442 (HVAC - Change of use, renovations and additions(3floors) to an industrial building for..., 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 167902 (Proposal to demolish chimney stack, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 Committee of Adjustment files on this lot

    Good to know

    4 approved. A0415/07TEY (To convert the ground level commercial/retail unit of the six-storey, 30-unit residenti..., 2007); A0689/06TEY (The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as ame..., 2006); A0277/05TEY (In its decision of May 2003, the Committee of Adjustment approved, on condition, an app..., 2005); and 1 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 167902Inspection

    Proposal to demolish chimney stack.

    Jul 11, 2025 · 10 WELLESLEY PL
  • Building permit10 128862Closed

    Proposal to install 1 backflow prevention device in an existing apartment building.

    Mar 15, 2010 · 10 WELLESLEY PL
  • Zoning review08 169003 ZPRClosed
    Jun 11, 2008 · 10 WELLESLEY PL
  • Minor varianceA0415/07TEYApproved

    To convert the ground level commercial/retail unit of the six-storey, 30-unit residential building (still under construction) to an additional residential unit.

    Aug 8, 2007 · 10 WELLESLEY PL
  • Building permit04 176442Inspection

    HVAC - Change of use, renovations and additions(3floors) to an industrial building for 29 unit residential condominium use and reatil store and office.

    Jul 13, 2007 · 10 WELLESLEY PL
  • Building permit06 181448Closed

    To install new sprinkler system to all 6 floors

    Oct 31, 2006 · 10 WELLESLEY PL
  • Minor varianceA0689/06TEYApproved

    The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to convert the amenity space located on the ground floor of the subject mixed use building to an additional dwelling unit, thereby increasing the number of units in the building from 29 to 30. The conversion will create an additional residential floor area of 34.66 square metre to the building.

    Oct 18, 2006 · 10 WELLESLEY PL
  • Zoning review06 161344 ZPRClosed
    Jul 27, 2006 · 10 WELLESLEY PL
Show 4 older records
  • Minor varianceA0277/05TEYApproved

    In its decision of May 2003, the Committee of Adjustment approved, on condition, an application to construct an infill addition to the existing building to bring it to a three-storey height, as well as to construct a three-strey addition above the building. A number of variances from the provisions of Zoning By-law No. 438-86, as amended, were also approved, including a variance for building height---maximum permitted height being 18 metres, while proposed as 20.09 (north elevation) and 20.28 metres (east elevation). The applicant is now seeking to increase the height of the building by an additional 0.3048 metres.

    Jun 22, 2005 · 10 WELLESLEY PL
  • Minor varianceA0126/03TEYApproved

    The applicant is seeking relief from the provisions of the zoning by-law in order to make interior alterations to the existing 3-storey industrial building in order to in fill the middle portion of the building and bring it to a 3-storey height. Also proposed is the construction of a 3-storey addition above the existing 3-storey building. The resulting building would be a 6-storey, 29-unit residential dwelling building. The proposed building would have approximate dimensions of 37.36 metres by 15.44 metres (2,671.40 square metres). Included in this proposal is the construction of a roof terrace which would be located at the easterly portion of the sixth floor level of the proposed building.

    May 7, 2003 · 10 WELLESLEY PL
  • Zoning review03 125684 PSPClosed
    Apr 23, 2003 · 10 WELLESLEY PL
  • Zoning review02 195750 ZPRClosed
    Dec 12, 2002 · 10 WELLESLEY PL

Check before you build

  • Site-specific exception 900.2.10(161)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(161)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
707 m²
Frontage
17.1 m
Depth
41.6 m
Street
Wellesley Pl
Corner lot
Yes, also on Lourdes Lane41.6 m along it
Public lane
Lourdes Lane, 47.2 m along it
Max height
18 m
Max lot coverage
—
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.5) (x161) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, amur (8 cm), ginkgo (4 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
83%5 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
22

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    50 EARL ST · Sep 15, 2021 · 186 m away
  • Minor varianceApproved

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    92 ISABELLA ST · Jun 30, 2021 · 308 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.

    50 EARL ST · Dec 4, 2020 · 186 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.

    66 GLOUCESTER ST · Oct 8, 2020 · 402 m away
  • Minor varianceApproved

    To legalize and maintain a three-storey residential apartment building with a reconstructed front porch and canopy.

    2 GLEN RD · Dec 4, 2019 · 456 m away

Latest activity nearby

  • Building permitdemolition, secondary suite

    Proposal to demolish the existing detached dwelling with 2 units.See 24 216579 STE 13 SA for future development

    5 HUNTLEY ST · Aug 7, 2026 · 115 m away
  • Building permitmultiplex

    REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.

    109 GLOUCESTER ST · Jul 24, 2026 · 188 m away
  • Building permitdemolition

    Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking.

    566 SHERBOURNE ST · Jun 29, 2026 · 298 m away
  • Building permitdemolition

    Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking.

    564 SHERBOURNE ST · Jun 29, 2026 · 293 m away
  • Zoning review

    Closed

    25 LOURDES LANE · Jun 19, 2026 · 114 m away
  • Zoning review

    Closed

    10 HUNTLEY ST · Jun 2, 2026 · 124 m away
  • Building permit

    Proposal to replace existing stairwell railings.

    100 WELLESLEY ST E · Jun 1, 2026 · 195 m away
  • Zoning review

    Closed

    109 GLOUCESTER ST · May 22, 2026 · 188 m away
  • Building permit

    Proposal for interior alterations to kitchen.

    15 MAITLAND PL · Apr 28, 2026 · 278 m away
  • Consent (lot split)Approved

    To obtain consent to sever the lot into two stratified parcels for the purpose of conveying the air rights above the existing two-storey semi-detached dwelling, as per City Council¿s direction to secure the tower separation on the lands municipally known as 5 Huntley Street and 2-8 Earl Street and a Portion of 10 Earl Street.

    10 EARL ST · Apr 15, 2026 · 93 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station8 min walk
Nearest TTC stop
Wellesley St East at Jarvis St3 min walk
Nearest cycling route
Wellesley St ECycle Track, 2 min walk
Nearest traffic count
8,530 vehicles in 8 hJarvis St / Earl Pl / Gloucester St, 140 m away, Dec 10, 2022
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 2 with cyclists
Parks
Wellesley - Magill Park1 min walk
Barbara Hall Park4 min walk
St. James Town West Park5 min walk

Schools within 1 km

  • JARVIS COLLEGIATE INSTITUTE English Public 3 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 4 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 5 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 5 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.