Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 10 Price St
10 Price St is on a 30.5 m by 31.1 m lot on Price St in Rosedale-Moore Park. The zoning is CR. A site-specific exception, 900.11.10(1952), changes some of the usual rules for this address. The lot also fronts Scrivener Sq. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 7 records on this lot since 1999. That is more than at 97% of Toronto houses. In 2020, a building permit was filed: "Proposal to demolish 4 storey office building". Status: closed. In 2018, a development application was filed: "Site plan control application to permit a 21-storey (81.65 metre) mixed-use building with a total of 120 dwelling units, 6,336 square metres of non-residential…". Status: closed. In 2017, a development application was filed: "The city has recieved official plan amendment and zoning by-law amendment applications to allow an 8-storey (35 metre) building and a 26-storey (97.3 metre)…". Status: closed. Nothing on file is open right now.
Within 300 m, 11 development applications are open (the tallest up to 35 storeys). Summerhill station is a 4-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Site-specific exception 900.11.10(1952)Moderate
- 11 development applications open within 300 mLowFree check
- Site and Area Specific Policy 208Low
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2020-12-16 | Building permit19 155229 | Proposal to demolish 4 storey office building. | Closed | |
| 2018-12-05 | Development application18 265043 STE 11 SA | Site Plan Control application to permit a 21-storey (81.65 metre) mixed-use building with a total of 120 dwelling units, 6,336 square metres of non-residential floor area, and 160 vehicle parking spaces (118 residential spaces and 42 commercial spaces) within a below grade parking garage. Application also includes: on-site parkland dedication; privately owned publicly accessible spaces; reconfiguration of Scrivener Square; and retention of a block of heritage buildings (the Shops of Summerhill). | Closed | |
| 2017-05-29 | Development application17 168095 STE 27 OZ | The City has recieved Official Plan Amendment and Zoning By-law Amendment applications to allow an 8-storey (35 metre) building and a 26-storey (97.3 metre) building with a total of 182 rental dwelling units, 3,085 square metres of non-residential floor area, and 164 vehicle parking spaces within an underground garage. | Closed | |
| 2013-12-16 | Building permit13 277807 | Installation of one 3" premise backflow prevention device | Closed | |
| 2009-09-03 | Building permit09 163541 | Installation of two(2) electromagnetic locks on the ground floor at the South West corner of the floor. | Closed | |
| 2009-07-29 | Building permit09 148176 | Proposal for interior alterations to the 3rd and 4th floor for new offices. This proposal inlcudes HVAC. The tenant is "NIMAN ZEMANS GELGOOT". | Closed | |
| 1999-05-12 | Building permit99 013204 | ALTER HVAC SYSTEM AND RELATED DUCTWORK ON PORTION OF 2ND FLOOR IN OFFICE AREA. REFER TO APPLICATION NUMBER: 422299 /ZL | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.11.10(1952)
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(1952)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 208
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1952)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c3.0; r1.0) SS2 (x1952)
- Height limit
- 11 m
- Corner lot
- Yes, also on Scrivener Sq
- Public lane
- None
- House footprint
- 595 m²
- Back yard
- 0 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 11 development applications open within 300 m, up to 35 storeys
- In the Rosedale station area
- 8 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
11 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Break and enter: 2.6 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rosedale-Moore Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station4 min walk
- Yonge St at MacPherson AveNearest TTC stop2 min walk
- Yonge StNearest cycling route1 min walk
- Cottingham Jr Public SchoolSchool7 min walk
- The York School - Mdl and Sr CampusSchool9 min walk
- McDonald International Academy SchoolSchool11 min walk
- De Lasalle College SchoolSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.4
- Robberycity median 69.586.8
- Auto theftcity median 192.6199.6
- Theft over $5,000city median 46.165.1
- Break and entercity median 172.8455.6
- Theft from vehiclescity median 188.1182.2
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist