HousePrecheckCheck an address

10 Old Mill TrlToronto · zoning, lot size and permit records

Residential apartment · RA (u45) (x71)≈ 61.4 × 78.4 m3,364 m²on Bloor St Wcorner, also on Old Mill Trl

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.3 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 2 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: Old MillThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 61.4 m frontage≈ 78.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit22 133928Closed

    Localized concrete and waterproofing repairs.

    May 17, 2022 · 10 OLD MILL TRL
  • Building permit11 114999Closed

    Installation of (1) backflow prevention device into an existing highrise condo building.

    Feb 7, 2011 · 10 OLD MILL TRL
  • Building permit97 085787Closednew building

    NEW APARTMENT BUILDING SUPERSTRUCTURE

    Jun 19, 1998 · 10 OLD MILL TRL

Check before you build

  • Exception 900.7.10(71) does not apply to this address

    Good to know

    The exception covers this area, but each of its 1 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(71)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

1 part for other addresses
  • A On 10 Humber Blvd., former City of Etobicoke by-law 1988-225.
By-law 569-2013, Chapter 900

Lot facts

Area
3,364 m²
Frontage
61.4 mestimated, irregular lot
Depth
78.4 mestimated, irregular lot
Street
Bloor St W
Corner lot
Yes, also on Old Mill Trl78.4 m along it
Public lane
None
Max height
14 m
Max lot coverage
40%
  • Major Transit Station Area: Old Mill. The lot is inside the Old Mill Major Transit Station Area approved by the Province (Site and Area Specific Policy 635). Source
  • Zone RA (u45) (x71) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 15 City trees in front of this lot. The City's street tree inventory lists 15 trees at this address: planetree, london (46 cm), planetree, london (41 cm), planetree, london (40 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct two new above and below grade station elevators that will be located along the north and south sides. This addition will accommodate the existing subway station.

    2672 BLOOR ST W · Mar 24, 2022 · 82 m away

Latest activity nearby

  • Building permit

    Interior renovations to lawfully existing dwelling unit in lawfully existing building.

    71-73 OLD MILL RD · Oct 8, 2026 · 110 m away
  • Zoning review

    Notice Sent

    2679 BLOOR ST W · Sep 30, 2026 · 153 m away
  • Zoning review

    Cancelled

    2679 BLOOR ST W · Sep 28, 2026 · 153 m away
  • Zoning review

    Notice Sent

    2679 BLOOR ST W · Sep 28, 2026 · 153 m away
  • Building permitdemolition

    Construct New Single Family Detached stucco and stone house with integral three car garage, outdoor swimming pool and associated landscaping

    76 OLD MILL RD · Jul 8, 2026 · 166 m away
  • Building permitnew building, new house

    Construct New Single Family Detached stucco and stone house with integral three car garage, outdoor swimming pool and associated landscaping

    76 OLD MILL RD · Jul 8, 2026 · 166 m away
  • Building permit

    Proposed garage ramp restoration repairs.

    40 OLD MILL RD · May 25, 2026 · 182 m away
  • Minor varianceApproved

    To construct a two-storey rear addition, a second storey rear platform and a deck in the rear yard.

    100 OLD MILL RD · May 14, 2026 · 268 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage, and a pool in the front yard.

    76 OLD MILL RD · Jan 29, 2026 · 166 m away
  • Zoning review

    Closed

    69 OLD MILL TER · Dec 11, 2025 · 230 m away

Neighbourhood: Kingsway South

About the area around the lot, not the lot itself.

Nearest station
Old Mill Station1 min walk
Nearest TTC stop
Bloor St West at Old Mill Trail1 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
17,525 vehicles in 14 hBloor St W / Old Mill Trl, 70 m away, May 13, 2026
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Home Smith Park2 min walk
King's Mill Park2 min walk
Etienne Brule Park4 min walk

Schools within 1 km

  • BLYTH ACADEMY SCHOOL - ETOBICOKE Private 13 min walk
  • ST PIUS X CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
  • SUMMIT MICRO SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKingsway SouthMedian neighbourhood
Median household income (2020)$184,000$84,500
Households that own their home81%54%
Population (2021)8,85516,813
Homes built in 1960 or before59%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKingsway SouthCity median
Assault513.1636.3
Robbery2969.5
Auto theft125.9192.6
Theft over $5,00058.146.1
Break and enter271.1172.8
Theft from vehicles48.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.