HousePrecheckCheck an address

10 Liben WayToronto · zoning, lot size and permit records

Also 145 Tapscott Rd

Residential apartment · RA (au37.6) (x611)≈ 56.7 × 69.8 m2,110 m²on Priya Lanecorner, also on Liben Way

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 1 development application open within 300 m, up to 32 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N20 m
≈ 56.7 m frontage≈ 69.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Notice Issued Prop Standards, Property Standards): 26 164893 PRS 00 IV (Notice Issued Prop Standards: Ceiling not maintained clean.; Exterior door has defectiv..., 2026); 26 150009 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 32 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation26 164893 PRS 00 IVClosed

    Notice Issued Prop Standards: Ceiling not maintained clean.; Exterior door has defective hardware.; Previously finished surface(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements.; The air conditioning system or unit is not in good repair and maintained in good working condition.

    Apr 25, 2026 · 10 LIBEN WAY
  • By-law investigation26 150009 PRS 00 IRClosed

    Property Standards

    Apr 25, 2026 · 10 LIBEN WAY

Check before you build

  • Site-specific exception 900.7.10(611)

    Needs a closer look

    4 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(611)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Amenity space must be provided at a minimum rate of 1.3 square metres for each dwelling unit

  2. Rule B

    The maximum lot coverage is 33%

  3. Rule C

    Parking spaces must be provided at the following minimum rates: (i) 1.2 for each dwelling unit and used for resident parking; and (ii) 0.2 for each dwelling unit and used for visitor parking

  4. Rule D

    The maximum height of a building is 61 metres.

  5. Older by-law A

    Schedule "C" Exception 29, of former City of Scarborough by-law 14402

By-law 569-2013, Chapter 900

Lot facts

Area
2,110 m²
Frontage
56.7 mestimated, irregular lot
Depth
69.8 mestimated, irregular lot
Street
Priya Lane
Corner lot
Yes, also on Liben Way69.8 m along it
Public lane
None
Max height
—
Max lot coverage
33%
  • Zone RA (au37.6) (x611) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Minor renovation - space demise - vanilla shell

    31 TAPSCOTT RD · Oct 23, 2026 · 273 m away
  • Zoning review

    Notice Sent

    55 NAHANNI TER · Oct 15, 2026 · 262 m away
  • Building permit

    Renovation of fire alarm system to existing builidngs, sprinkler life safety (existing and emergency light) to follow latest codes.

    78 TAPSCOTT RD · Oct 5, 2026 · 206 m away
  • Building permit

    Proposal to install fire-rated door to enter garage from inside the home.

    301 WASHBURN WAY · Mar 2, 2026 · 165 m away
  • Building permit

    Proposed interior alteration to the existing unit #43, for a restaurant, new kitchen exhaust, make up air, a/c system and plumbing.

    31 TAPSCOTT RD · Feb 17, 2026 · 273 m away
  • Zoning review

    Closed

    31 TAPSCOTT RD · Dec 24, 2025 · 273 m away
  • Building permit

    Proposal to construct a new detached garage and carport at the rear of the existing semi-detached dwelling.

    55 NAHANNI TER · Dec 8, 2025 · 262 m away
  • Zoning review

    Closed

    31 TAPSCOTT RD · Sep 15, 2025 · 273 m away
  • Building permit

    Revision 01 - Revision to include fire separation detail.-------------------------------------------------------------------Proposed interior alteration for hair salon (Personal Service Shop) Unit 61

    31 TAPSCOTT RD · Aug 12, 2025 · 273 m away
  • Building permit

    Proposed fire damage repairs

    301 WASHBURN WAY · Aug 7, 2025 · 165 m away

Neighbourhood: Malvern West

About the area around the lot, not the lot itself.

Nearest TTC stop
Tapscott Rd at Washburn Way1 min walk
Nearest traffic count
10,283 vehicles in 14 hTapscott Rd / Liben Way / Washburn Way, 50 m away, Dec 11, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Tapscott Woodlot4 min walk
McLevin Woods Park4 min walk
Major Abbas Ali Park5 min walk

Schools within 1 km

  • DR MARION HILLIARD SR PUBLIC SCHOOL English Public 2 min walk
  • LESTER B PEARSON COLLEGIATE INSTITUTE English Public 3 min walk
  • BERNER TRAIL JR PUBLIC SCHOOL English Public 8 min walk
  • MALVERN MONTESSORI SCHOOL Private 10 min walk
  • TOM LONGBOAT JR PUBLIC SCHOOL English Public 14 min walk
  • SACRED HEART CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern WestMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home74%54%
Population (2021)17,32016,813
Homes built in 1960 or before6%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern WestCity median
Assault635636.3
Robbery125.969.5
Shootings27.410.5
Auto theft366.8192.6
Theft over $5,00065.746.1
Break and enter43.8172.8
Theft from vehicles208188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.