HousePrecheckCheck an address

10 Huntley StToronto · zoning, lot size and permit records

Residential · R (d2.0) (x644)≈ 45.3 × 87.9 m3,086 m²on Huntley St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 20 storeys, 116 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: B0022/25TEY (To obtain consent to sever the property into two residential lots with a stratified sev..., 2025); 22 192523 STE 13 SA (Proposed 29-storey residential building fronting Jarvis Street including just under 15,..., 2022); 21 235167 STE 13 OZ (Official Plan and Zoning by-law amendment application to facilitate the redevelopment o..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 19 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 45.3 m frontage≈ 87.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 219654 PRS 00 IR (Property Standards, 2026); 26 115165 PRS 00 IR (Property Standards, 2026); 25 251684 HEA 00 IR (Adequate Heat, 2025); and 3 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: B0022/25TEY (To obtain consent to sever the property into two residential lots with a stratified sev..., 2025); 22 192523 STE 13 SA (Proposed 29-storey residential building fronting Jarvis Street including just under 15,..., 2022); 21 235167 STE 13 OZ (Official Plan and Zoning by-law amendment application to facilitate the redevelopment o..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 19 development applications open within 300 m

    Good to know

    19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (20 storeys, 116 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 219654 PRS 00 IRClosed

    Property Standards

    Aug 14, 2026 · 10 HUNTLEY ST
  • By-law investigation26 203269 WST 00 IRClosed

    Waste

    Jul 16, 2026 · 10 HUNTLEY ST
  • By-law investigation26 115165 PRS 00 IRClosed

    Property Standards

    Feb 9, 2026 · 10 HUNTLEY ST
  • By-law investigation25 251684 HEA 00 IRClosed

    Adequate Heat

    Nov 10, 2025 · 10 HUNTLEY ST
  • By-law investigation25 204789 LGW 00 IRClosed

    Long Grass and Weeds

    Aug 4, 2025 · 10 HUNTLEY ST
  • Building permit25 162175Closed

    Proposal for localized concrete repairs to reduce risk of rain penetration at specific wall drops.

    Jun 13, 2025 · 10 HUNTLEY ST
  • Consent (lot split)B0022/25TEYPending

    To obtain consent to sever the property into two residential lots with a stratified severance, as well as to create new easements/rights-of-ways. This is currently under the review of Site Plan Control (File Number 22 192523 STE 13 SA).

    Mar 24, 2025 · 10 HUNTLEY ST
  • By-law investigation24 250580 PRS 00 IRClosed

    Property Standards

    Dec 16, 2024 · 10 HUNTLEY ST
Show 10 older records
  • By-law investigation25 102421 PRS 00 IVClosed

    Order Issued Property Standards: Previously finished wall(s) have marks, stains.Namely:Water marks throughout bachelor unit living space.; The property has not been repaired in accordance with the standards.Namely: Water penetration throughout dwelling unit

    Dec 15, 2024 · 10 HUNTLEY ST
  • By-law investigation24 250499 PRS 00 IRClosed

    Property Standards

    Dec 15, 2024 · 10 HUNTLEY ST
  • Zoning review22 192523 PSPClosed
    Sep 9, 2022 · 10 HUNTLEY ST
  • Development application22 192523 STE 13 SAUnder Review

    Proposed 29-storey residential building fronting Jarvis Street including just under 15,000sqm of new gross floor area. In total, the maximum height of the proposed building is 99.0m, including a three-storey podium and 7m mechanical penthouse. In total, this represents a Floor Space Index of 11.70. The proposed unit mix includes 26 Studios (12%), 123 one-bedroom/one+den (58%), 42 two-bedroom/two+den (20%) and 22 three-bedroom/three+den (10%) units.

    Aug 18, 2022 · 10 HUNTLEY ST · City file
  • Zoning review21 235167 POZClosed
    Nov 16, 2021 · 10 HUNTLEY ST
  • Development application21 235167 STE 13 OZAppeal Received

    Official Plan and Zoning by-law amendment application to facilitate the redevelopment of the site for a 29-storey infill residential building having a gross floor area of 15,000 square metres and 213 new residential units. The existing 20-storey apartment building containing 117 rental units will be maintained.

    Nov 7, 2021 · 10 HUNTLEY ST · City file
  • Building permit10 101536Closed

    Installation of a 3" backflow prevention device for this apartment building.

    Jan 11, 2010 · 10 HUNTLEY ST
  • Building permit04 187739Closed

    Installation of telecommunications equipment and towers.

    Nov 5, 2004 · 10 HUNTLEY ST
  • Building permit99 110976Closed

    Alter plans as approved under file 99 - 110976 by changing construction of the walls of the enclosure of parking garage ramp on North side. (Revision #1) see c. of a. decision

    Dec 13, 2000 · 10 HUNTLEY ST
  • Building permit97 013474Closed

    MAKE ALTERATIONS TO LOBBY AREA ON GROUND FLOOR SS

    Mar 7, 1997 · 10 HUNTLEY ST

Check before you build

  • Site-specific exception 900.2.10(644)

    Needs a closer look

    2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(644)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Rule B

    The minimum front yard setback is 6.0 metres.

  3. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
3,086 m²
Frontage
45.3 mestimated, irregular lot
Depth
87.9 mestimated, irregular lot
Street
Huntley St
Corner lot
No
Public lane
None
House footprint
447 m²roof up to 59.8 m
Back yard
62.6 mhouse to rear lot line
Side yards
7.8 m and 8.4 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.0) (x644) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: spruce, colorado blue (34 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%8 of 9 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
7
Development applications
25

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    50 EARL ST · Sep 15, 2021 · 230 m away
  • Minor varianceApproved

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    92 ISABELLA ST · Jun 30, 2021 · 186 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.

    50 EARL ST · Dec 4, 2020 · 230 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.

    66 GLOUCESTER ST · Oct 8, 2020 · 329 m away
  • Minor varianceApproved

    To legalize and maintain a three-storey residential apartment building with a reconstructed front porch and canopy.

    2 GLEN RD · Dec 4, 2019 · 422 m away

Latest activity nearby

  • Building permit

    Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.

    1 MOUNT PLEASANT RD · Nov 18, 2026 · 218 m away
  • Building permit

    REV 01: Revision to permit to include two risers Proposal to replace heating riser.

    110 CHARLES ST E · Oct 20, 2026 · 234 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    37 LINDEN ST · Oct 9, 2026 · 289 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units

    29 LINDEN ST · Oct 9, 2026 · 258 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    574 SHERBOURNE ST · Oct 9, 2026 · 278 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    572 SHERBOURNE ST · Oct 9, 2026 · 274 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    570 SHERBOURNE ST · Oct 9, 2026 · 274 m away
  • Building permit

    Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.

    576 SHERBOURNE ST · Oct 9, 2026 · 283 m away
  • Building permit

    Proposal for installation of an art work on the front face of existing building. Weight 150kg

    519 CHURCH ST · Sep 25, 2026 · 294 m away
  • Building permit

    Drain - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    576 SHERBOURNE ST · Sep 1, 2026 · 283 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station7 min walk
Nearest TTC stop
Wellesley St East at Jarvis St4 min walk
Nearest cycling route
Wellesley St ECycle Track, 4 min walk
Nearest traffic count
3,488 vehicles in 8 hIsabella St / Huntley St, 80 m away, Feb 27, 2006
Serious collisions within 500 m
112021–2026, killed or seriously injured: 1 fatal, 7 with pedestrians, 3 with cyclists
Parks
Barbara Hall Park3 min walk
Wellesley - Magill Park3 min walk
Charles Street Parkette4 min walk

Schools within 1 km

  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 3 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 4 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 5 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.