HousePrecheckCheck an address

10 Eva RdToronto · zoning, lot size and permit records

72.4 × 66.0 m4,653 m²on Eva Rd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 3 development applications open within 300 m, up to 44 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
72.4 m frontage66.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 197598 ZON 00 IR (Zoning, 2026); 26 114641 PRS 00 IR (Property Standards, 2026); 25 253703 PRS 00 IR (Property Standards, 2025); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 44 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 197598 ZON 00 IRClosed

    Zoning

    Jul 7, 2026 · 10 EVA RD
  • By-law investigation26 114641 PRS 00 IRClosed

    Property Standards

    Feb 8, 2026 · 10 EVA RD
  • By-law investigation25 253703 PRS 00 IRClosed

    Property Standards

    Nov 13, 2025 · 10 EVA RD
  • By-law investigation25 179730 PRS 00 IRClosed

    Property Standards

    Jun 18, 2025 · 10 EVA RD
  • Building permit19 257605Closednew building

    REV02: Changes to the interior layout to add a storage room at level 1.REV 01: Revision to proposed green roof system associated with the construction of a 28-storey residential condominium with 212 units and three levels of undeground parking

    Jul 6, 2023 · 10 EVA RD
  • Building permit22 217985Closed

    Proposal to construct 5 mag locks

    Nov 17, 2022 · 10 EVA RD
  • Building permit22 130780Approved

    Alternative Solution to use grade TP304 SCH 10 stainless steel pipe as an alternative to Type L Copper for domestic water main risers

    Apr 5, 2022 · 10 EVA RD
  • Development application22 105435 WET 02 CDClosed

    Draft Plan of Condominium application for a 28 storey residential building with 211 condominium units (Building C of Phase 2).

    Jan 19, 2022 · 10 EVA RD · City file
Show 7 older records
  • Building permit19 258169Closed

    Site sercives - Proposed construction of 28-storey residential condominium with 212 units and three levels of underground parking.

    Oct 28, 2020 · 10 EVA RD
  • Building permit20 116934Approved

    Alternative Solution Application to provide 65 mm standpipe system hose valve connections in exit stairs in lieu of 38mm and 65mm hose stations.

    Feb 19, 2020 · 10 EVA RD
  • Zoning review18 181277 ZPRClosed
    Jun 20, 2018 · 10 EVA RD
  • Zoning review17 232921 PSPClosed
    May 30, 2018 · 10 EVA RD
  • Zoning review17 232906 PRZClosed
    Sep 21, 2017 · 10 EVA RD
  • Development application17 232906 WET 03 OZClosed

    The application proposes a partial lifting of the H symbol for the northeast portion of the lands in Phase 2 to accommodate 28 storey residential building with 212 units (Building C).

    Sep 14, 2017 · 10 EVA RD · City file
  • Development application08 112855 WET 03 OZClosed

    Demolish existing 3 office buildings and construct residential towers with heights ranging up to 31 storeys.

    Feb 21, 2008 · 10 EVA RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,653 m²
Frontage
72.4 m
Depth
66 m
Street
Eva Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    1
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    5

    Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To reduce the number of lawful parking spaces in order to accomodate electric vehicle charging stations with a battery storage enclosure.

      380 THE EAST MALL · May 14, 2026 · 395 m away
    • Minor varianceApproved

      To construct a 40-storey building (Building D) and a 44-storey building (Building E) both above a 4 -storey podium (Phase 2 of the mixed use development).

      2 GIBBS RD · May 25, 2023 · 477 m away
    • Minor varianceApproved

      To construct a second storey addition above the existing dwelling and a one-storey south side addition which will be the new attached garage. The existing attached garage will be converted into habitable space.

      47 ROSSBURN DR · Nov 30, 2021 · 431 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      40 ROSSBURN DR · Dec 5, 2019 · 484 m away
    • Minor varianceApproved

      To construct a two-storey north side addtition that will include an attached garage, a second storey addition above the existing dwelling, a new front porch, a rear yard deck, and a second storey front balcony.

      49 ROSSBURN DR · Jan 11, 2018 · 433 m away

    Latest activity nearby

    • Consent (lot split)Approved

      To obtain consent to sever the lot into two lots and to create various easements/ right-of-ways.

      375-385 THE WEST MALL · Nov 19, 2026 · 205 m away
    • Zoning review

      Cancelled

      2 CIVIC CENTRE CRT · Sep 10, 2026 · 256 m away
    • Building permit

      Demolition and recasting of entrance stairs and replacement of roof assembly above the main entrance podium structural slab.

      1 CIVIC CENTRE CRT · Jul 8, 2026 · 166 m away
    • Building permit

      Test - New House

      2 CIVIC CENTRE CRT · Jun 17, 2026 · 256 m away
    • Zoning review

      Closed

      1 EVA RD · Feb 12, 2026 · 191 m away
    • Zoning review

      Closed

      385 THE WEST MALL · Jul 21, 2025 · 238 m away
    • Building permit

      Proposed localized garage repairs.

      1 VALHALLA INN RD · Jul 9, 2025 · 223 m away
    • Building permit

      Proposal for slab replacement.

      361 THE WEST MALL · Jul 7, 2025 · 172 m away
    • Building permitgarden suite

      PRODUCTION TESTING OF PORTAL

      2 CIVIC CENTRE CRT · Jun 24, 2025 · 256 m away
    • Zoning review

      Closed

      375-385 THE WEST MALL · May 27, 2025 · 219 m away

    Neighbourhood: Etobicoke West Mall

    About the area around the lot, not the lot itself.

    Nearest station
    Kipling Station36 min walk
    Nearest TTC stop
    361 The West Mall3 min walk
    Nearest cycling route
    Renforth DrBike Lane, 9 min walk
    Nearest traffic count
    9,300 vehicles in 8 hEva Rd / The West Mall, 270 m away, Dec 8, 2009
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Dennis Flynn Park4 min walk
    East Mall Park7 min walk
    Broadacres Park10 min walk

    Schools within 1 km

    • TORONTO DISTRICT SCHOOL BOARD - WEST EDUCATION OFFICE English Public 3 min walk
    • EATONVILLE JR SCHOOL English Public 8 min walk
    • BLOORLEA MDL SCHOOL English Public 11 min walk
    • BLOORDALE MDL SCHOOL English Public 13 min walk
    • ST ELIZABETH CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
    • QUO VADIS ELEMENTARY SCHOOL Private 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureEtobicoke West MallMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home56%54%
    Population (2021)11,86516,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleEtobicoke West MallCity median
    Assault468.6636.3
    Robbery27.669.5
    Auto theft199.8192.6
    Theft over $5,00013.846.1
    Break and enter110.3172.8
    Theft from vehicles179.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.