HousePrecheckCheck an address

10 Eastern AveToronto · zoning, lot size and permit records

Also 101 Trinity St, 10A Eastern Ave, 12A Eastern Ave, 12 Eastern Ave, 14 Eastern Ave and 4 more

Commercial residential · CR SS2 (x341)≈ 58.3 × 95.1 m3,054 m²on Eastern Avecorner, also on Pemberton Stbacks onto Ln S King W Gilead Pl

Not a home

A commercial or mixed-use building

8 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 143317 (Revision 01: revision to add a rooftop playgroundProposal to construct interior alterat..., 2026); 26 194893 (Proposal to demolish the existing 1 storey commercial building, 2026); 26 145148 STE 13 SA (Site Plan Approval for a 20-storey purpose built rental residential building, containin..., 2026); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 58.3 m frontage≈ 95.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 143317 (Revision 01: revision to add a rooftop playgroundProposal to construct interior alterat..., 2026); 26 194893 (Proposal to demolish the existing 1 storey commercial building, 2026); 26 145148 STE 13 SA (Site Plan Approval for a 20-storey purpose built rental residential building, containin..., 2026); and 1 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 7 Committee of Adjustment files on this lot

    Good to know

    6 approved. B0031/26TEY (To obtain consent to sever the property into three lots, and to maintain the existing e..., 2026); A0268/26TEY (The existing undersized public parking lot will be maintained and unaltered, 2026); A0249/26TEY (The existing one-storey and two-storey commercial buildings (retail and daycare) will b..., 2026); and 4 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

36 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 266883 ZAPNot Started
    Nov 6, 2026 · 16 EASTERN AVE
  • Zoning review26 261421 ZZUClosed
    Oct 28, 2026 · 10 EASTERN AVE
  • Zoning review26 249675 LPRClosed
    Oct 5, 2026 · 14 EASTERN AVE
  • Zoning review26 246516 ZPRCancelled
    Sep 29, 2026 · 10 EASTERN AVE
  • Consent (lot split)B0031/26TEYApproved

    To obtain consent to sever the property into three lots, and to maintain the existing easement/right-of-way.

    Sep 9, 2026 · 4 GILEAD PL
  • Minor varianceA0268/26TEYApproved

    The existing undersized public parking lot will be maintained and unaltered.

    Sep 9, 2026 · 4 GILEAD PL
  • Minor varianceA0249/26TEYApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    Sep 9, 2026 · 4 GILEAD PL
  • By-law investigation26 269621 LGW 00 IVNotice Issued

    Notice Issued Long Grass

    Aug 13, 2026 · 4 GILEAD PL
Show 28 older records
  • By-law investigation26 219492 WST 00 IRClosed

    Waste

    Aug 13, 2026 · 4 GILEAD PL
  • By-law investigation26 219489 LGW 00 IRNotice Issued

    Long Grass and Weeds

    Aug 13, 2026 · 4 GILEAD PL
  • Building permit26 194893Ready for Issuancedemolition

    Proposal to demolish the existing 1 storey commercial building.

    Jul 2, 2026 · 10 EASTERN AVE
  • Building permit25 143317Revision Issued

    Revision 01: revision to add a rooftop playgroundProposal to construct interior alterations for a daycare

    Jun 18, 2026 · 14 EASTERN AVE
  • Minor varianceA0020/26TEYApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    May 6, 2026 · 14 EASTERN AVE
  • Zoning review26 141014 POZClosed
    Apr 24, 2026 · 4 GILEAD PL
  • Development application26 145148 STE 13 SAApplication Received

    Site Plan Approval for a 20-storey purpose built rental residential building, containing 297 dwelling units.

    Apr 16, 2026 · 4 GILEAD PL
  • Development application26 141014 STE 13 OZOMB Appeal

    The application proposes to amend the Official Plan and Zoning By-law to permit a 20 storey residential building containing 297 residential dwelling units.

    Apr 9, 2026 · 4 GILEAD PL · City file
  • Zoning review26 123929 ZZUClosed
    Mar 3, 2026 · 10 EASTERN AVE
  • Zoning review26 124213 ZAPNotice Sent
    Mar 3, 2026 · 10 EASTERN AVE
  • Zoning review26 124216 ZAPNotice Sent
    Mar 3, 2026 · 101 TRINITY ST
  • Zoning review26 111701 ZAPNotice Sent
    Feb 2, 2026 · 4 GILEAD PL
  • Minor varianceSYS 5757605Pending

    Proposal for rooftop playground to new daycare

    Dec 18, 2025 · 14 EASTERN AVE
  • Zoning review25 179806 ZZUClosed
    Jun 19, 2025 · 10 EASTERN AVE
  • Zoning review25 102034 ZAPApplication On Hold
    Jan 7, 2025 · 14 EASTERN AVE
  • Zoning review24 231085 ZZUClosed
    Oct 25, 2024 · 14 EASTERN AVE
  • Zoning review23 120460 ZZUClosed
    Mar 6, 2023 · 16 EASTERN AVE
  • Zoning review22 236173 ZAPCancelled
    Dec 5, 2022 · 16 EASTERN AVE
  • Zoning review22 213258 ZAPClosed
    Oct 5, 2022 · 4 GILEAD PL
  • Development application21 229569 STE 13 CDClosed

    The proposed condominium is a 12 storey residential building that contains 379 dwelling units andtwo below ground parking levels. The redevelopment proposes 25,127 sq. m of total gross floorarea (GFA), 758 sq. m of indoor amenity space and 810 sq. m of outdoor amenity space

    Oct 22, 2021 · 18 EASTERN AVE · City file
  • Development application19 264378 STE 13 SAClosed

    Site Plan Approval for new mixed-use building: 12 storeys plus mechanical penthouse, 379 dwelling units, 24671square metres of residential GFA and 890 square metres of retail.

    Dec 23, 2019 · 18 EASTERN AVE · City file
  • Building permit16 249704Closed

    Proposal to install a back water valve in existing mixed use building.

    Dec 6, 2016 · 14 EASTERN AVE
  • Development application16 216777 STE 28 OZClosed

    OMB Approved mixed-use building: 12 storeys plus mechanical penthouse, 379 dwelling units, 24,237 square metres of residential GFA and 890 square metres of retail.

    Sep 1, 2016 · 18 EASTERN AVE · City file
  • Minor varianceA0748/15TEYApproved

    To permit the existing one-storey building to be used for a commissary kitchen with associated office space.

    Oct 7, 2015 · 4 GILEAD PL
  • Building permit06 130879Closed

    Interior alterations to ground floor & basement to change use to Restaurant.

    Oct 6, 2006 · 4 GILEAD PL
  • Minor varianceA0474/06TEYApproved

    The applicant is seeking relief from the provisions of the City of Toronto Zoning By-law No. 438-86, as amended, to permit a change of use from industrial to restaurant, within the existing one-storey building. No change is proposed to the existing building size (approximately 24.38 metres by 14.94 metres).

    Jul 26, 2006 · 4 GILEAD PL
  • Zoning review97 025949 LTOClosed
    Feb 20, 1997 · 10 EASTERN AVE
  • Zoning review85 026879 LTOClosed
    Aug 19, 1985 · 4 GILEAD PL

Check before you build

  • Site-specific exception 900.11.10(341)

    Needs a closer look

    6 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(341)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900.11.10(2)

  2. Rule B

    Despite regulation 40.10.20.40(1), dwelling units are permitted in an Apartment Building , Mixed Use Building or Townhouse

  3. Rule C

    A building or structure must be set back a minimum of 5.0 metres from an elevated roadway structure

  4. Rule D

    If a lot with a building is identified as a heritage site , any portion of a building that exceeds the height of the conserved heritage building, whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres

  5. Rule E

    Despite regulation 40.10.40.10(5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less 3.7 metres

  6. Rule G

    Despite regulation 40.10.40.70(2)(G), for a lot abutting Eastern Avenue:

  7. Older by-law A

    Section 12 (2) 270 (a) of former City of Toronto By-law 438-86

1 part for other addresses
  • B On 2 Eastern Avenue and 90 Trinity Street, City of Toronto By-law 110-2010.
By-law 569-2013, Chapter 900

Lot facts

Area
3,054 m²
Frontage
58.3 mestimated, irregular lot
Depth
95.1 mestimated, irregular lot
Street
Eastern Ave
Corner lot
Yes, also on Pemberton St95.1 m along it
Public lane
Ln S King W Gilead Pl, 22.8 m along it
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR SS2 (x341) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
0
Development applications
28

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 435 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 31 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 31 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 51 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 1299-2023) for a mixed-use building (45 and 49-storeys), by increasing the total building height, the height of the podium, and mechanical penthouse vertical projections, equipment, structures and screening, and cladding encroachments of Building A. Also, to reduce the number of bicycle parking spaces and to alter the bicycle parking locations. A related Site Plan Approval application (under File Number 21 148154 STE 13 SA) is currently under review and consideration. There will be a total of 1,227 residential dwelling units (including approximately 245 affordable housing units) on this lot.

    49 ONTARIO ST · Aug 13, 2025 · 423 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for a new mixed-use development (automotive dealership at-grade with dwelling units above, as approved under Site Specific Zoning By-law 1306-2023), by increasing the maximum building height from 29-storeys (93 m) to 37-storeys (116.25 m), increasing residential and total gross floor areas, and reducing the minimum height of the first storey containing the automotive dealership. There will be a total of 303 residential dwelling units on this lot. A related Site Plan Control application (File #20 22 204774 STE 13 SA) is currently under review.

    550 ADELAIDE ST E · Dec 9, 2026 · 275 m away
  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 295 m away
  • Building permit

    2 wall signs + 1 projecting sign**PUR & SIMPLE**

    373 FRONT ST E · Nov 19, 2026 · 210 m away
  • Zoning review

    Not Started

    16 EASTERN AVE · Nov 6, 2026 · 53 m away
  • Zoning review

    Closed

    10 EASTERN AVE · Oct 28, 2026 · 25 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 267 m away
  • Zoning review

    Application Acceptable

    398 KING ST E · Oct 14, 2026 · 98 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 267 m away
  • Building permit

    2 wall signs + 1 projecting sign**PUR & SIMPLE**

    373 FRONT ST E · Oct 7, 2026 · 210 m away
  • Zoning review

    Closed

    14 EASTERN AVE · Oct 5, 2026 · 51 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
King Station24 min walk
Nearest TTC stop
King St East at Sackville St2 min walk
Nearest cycling route
Cherry StBike Lane, 3 min walk
Nearest traffic count
3,928 vehicles in 8 hKing St E / Trinity St, 90 m away, Jul 6, 2016
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
Parks
Little Trinity Church Lands1 min walk
Sackville Playground2 min walk
Orphan's Green3 min walk

Schools within 1 km

  • INGLENOOK COMMUNITY SCHOOL English Public 2 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 6 min walk
  • LIBERTY PREP SCHOOL Private 6 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 6 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.