Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Ravine and natural feature protection (1% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6585 building permits open, the oldest since 2010
Needs a closer lookStill open in the City's records: 19 228255 (Proposal to temporarily remove portion of roof of building (corrugated metal sheet - 35..., 2019, status Permit Issued); 19 212291 (Proposed security monitoring network and smoke detection upgrade, 2019, status Permit Issued); 17 175906 (Construction of concrete foundations, extension of slab-on-grade, erection of steel sup..., 2017, status Permit Issued); and 2 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (10% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 91 Committee of Adjustment file on this lot
Good to know1 approved. A154/10SC (To increase the amount of oleum (fuming sulphuric acid) in the storage tank of the exis..., 2010).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
12 records on file: more than at 100% of Toronto houses (median 0).
- Building permit19 228255Permit Issued
Proposal to temporarily remove portion of roof of building (corrugated metal sheet - 35m2), install temporary tarp steel frame, then reinstall original corrugated metal sheet. Also construct platform support on exterior south-west corner of property for the use of equipment access (179m2).
Nov 4, 2019 · 10 CHEMICAL CRT - Building permit19 212291Permit Issued
Proposed security monitoring network and smoke detection upgrade.
Sep 24, 2019 · 10 CHEMICAL CRT - Building permit17 175906Permit Issued
Construction of concrete foundations, extension of slab-on-grade, erection of steel supports, cladding and roof to expand and enclose outdoor calcium dryer discharge points. Equipment enclosure is existing, is being expanded and is an unoccupied space
Jun 23, 2017 · 10 CHEMICAL CRT - Building permit17 161912Closed
interior alteration (wall and door)
Jun 1, 2017 · 10 CHEMICAL CRT - Building permit11 288703Permit Issued
To add a new cooling tower on the roof of the existing building (Product Warehouse)
Mar 9, 2012 · 10 CHEMICAL CRT - Building permit11 274028Closed
To construct an addition to the existing steel frame platform
Nov 9, 2011 · 10 CHEMICAL CRT - Minor varianceA154/10SCApproved
To increase the amount of oleum (fuming sulphuric acid) in the storage tank of the existing Industrial Chemical Plant.
Nov 2, 2010 · 10 CHEMICAL CRT - Building permit10 246178Inspection
2 backflow preventer devices
Sep 14, 2010 · 10 CHEMICAL CRT
Show 4 older records
- Building permit10 133203Closed
HVAC - Interior alteration to existing Blend Plant building, alterations to tank farm, new pre fabricated Control Building, incl. hvac and plmg.
Aug 13, 2010 · 10 CHEMICAL CRT - Building permit98 200571Closed
INSTALL SPRINKLER
Feb 21, 2000 · 10 CHEMICAL CRT - Building permit98 200728Closed
CHEM. PLANT/ADD FOR DRYER
Aug 24, 1998 · 10 CHEMICAL CRT - Building permit98 200412Closed
3RD STOREY ADDITON-CHEMIC
Mar 3, 1998 · 10 CHEMICAL CRT
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 36,053 m²
- Frontage
- 170.6 m
- Depth
- 218.7 m
- Street
- Chemical Crt
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,981 m²roof up to 14.1 m
- Back yard
- 107.1 mhouse to rear lot line
- Side yards
- 5.8 m and 129.5 mhouse to side lot lines
- Buildings on the lot
- 11house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
Proposal to relocate three storage tanks from their former location inside a building at the rear of the property to an outdoor location near the rear property line, as shown on the attached Site Plan.
15 WALLSEND DR · Jul 21, 2011 · 146 m away - Minor varianceApproved
To increase the amount of oleum (fuming sulphuric acid) in the storage tank of the existing Industrial Chemical Plant.
10 CHEMICAL CRT · Nov 2, 2010 · 23 m away - Minor varianceApproved
In March 2005 the subject property was sold. During the sale of the property a deficiency in the rear yard building setback was identified. In order to ensure this property is free and clear of all Zoning By-law deficiencies the applicant wishes to recognize the existing rear yard building setback.
500 CORONATION DR · Apr 20, 2005 · 414 m away - Minor varianceApproved
To permit one additional loading dock.
15 WALLSEND DR · Jun 6, 2001 · 146 m away
Latest activity nearby
- Building permit
7 Wall Sign1 Overhanging Sign
15 WALLSEND DR · Nov 3, 2026 · 146 m away - Zoning review
Closed
520 CORONATION DR · Jul 16, 2024 · 299 m away - Building permit
design and installation of alterations to existing sprinkler system
595 CORONATION DR · Nov 7, 2023 · 290 m away - Zoning review
Closed
530 CORONATION DR · Sep 24, 2021 · 291 m away - Building permit
Revision to clarify wall section detail as requested by inspector.Proposal for interior alterations to the staff lunch room
30 CHEMICAL CRT · Jul 16, 2021 · 129 m away - Building permit
Proposal to temporarily remove portion of roof of building (corrugated metal sheet - 35m2), install temporary tarp steel frame, then reinstall original corrugated metal sheet. Also construct platform support on exterior south-west corner of property for the use of equipment access (179m2).
10 CHEMICAL CRT · Nov 4, 2019 · 23 m away - Building permit
Proposed security monitoring network and smoke detection upgrade.
10 CHEMICAL CRT · Sep 24, 2019 · 23 m away - Building permit
Construction of concrete foundations, extension of slab-on-grade, erection of steel supports, cladding and roof to expand and enclose outdoor calcium dryer discharge points. Equipment enclosure is existing, is being expanded and is an unoccupied space
10 CHEMICAL CRT · Jun 23, 2017 · 23 m away - Building permit
interior alteration (wall and door)
10 CHEMICAL CRT · Jun 1, 2017 · 23 m away - Building permit
Proposal to install a 2 inch backflow prevention device.
520 CORONATION DR · Aug 5, 2016 · 299 m away
Neighbourhood: West Hill
About the area around the lot, not the lot itself.
- Nearest station
- Guildwood Station47 min walk
- Nearest TTC stop
- Coronation Dr at Chemical Crt5 min walk
- Nearest cycling route
- Copperfield RdSharrows - Wayfinding, 3 min walk
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- East Point Park3 min walk
- Woodgrove Ravine Park7 min walk
- Beechgrove Ravine7 min walk
Schools within 1 km
- WILLIAM G MILLER JR PUBLIC SCHOOL English Public 10 min walk
- ST MALACHY CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | West Hill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,000 | $84,500 |
| Households that own their home | 59% | 54% |
| Population (2021) | 28,140 | 16,813 |
| Homes built in 1960 or before | 21% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Hill | City median |
|---|---|---|
| Assault | 1328.2 | 636.3 |
| Robbery | 98.3 | 69.5 |
| Homicide | 6.3 | 5.3 |
| Shootings | 15.8 | 10.5 |
| Auto theft | 149 | 192.6 |
| Theft over $5,000 | 63.4 | 46.1 |
| Break and enter | 193.4 | 172.8 |
| Theft from vehicles | 389.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.