Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 10 Alcorn Ave
10 Alcorn Ave is on a 65.6 m by 66.7 m lot on Alcorn Ave in Yonge-St.Clair. The zoning is R. A site-specific exception, 900.2.10(745), changes some of the usual rules for this address.
The City has 19 records on this lot since 1997. That is more than at 99% of Toronto houses. In 2020, a building permit was filed: "Rev 1: opening ceiling in areas noted on interior drawings.mechanical revised to suit.[proposal for interior alterations for existing office unit 300 ]". Status: closed. In 2020, a building permit was filed: "Proposal for interior demolition for existing office unit 300". Status: closed. In 2017, a building permit was filed: "Interior alterations to existing office space. suite 100. tenant - "the ontario teacher's foundation"". Status: closed. Nothing on file is open right now.
Within 300 m, 7 development applications are open (the tallest up to 49 storeys). Summerhill station is a 1-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Site-specific exception 900.2.10(745)Moderate
- No permit for a second unit on fileLowFree check
- 7 development applications open within 300 mLowFree check
- 10 City trees in front of this lotLowFree check
- Yonge-St. Clair Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
City files on this lot
19 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2020-07-08 | Building permit19 263723 | rev 1: Opening ceiling in areas noted on interior drawings.Mechanical revised to suit.[Proposal for interior alterations for existing office unit 300 ] | Closed | |
| 2020-01-13 | Building permit19 259505 | Proposal for interior demolition for existing office unit 300 | Closed | |
| 2017-10-23 | Building permit17 230976 | Interior alterations to existing office space. Suite 100. Tenant - "The Ontario Teacher's Foundation". | Closed | |
| 2016-04-07 | Building permit16 137386 | Proposal for structural reinforcement to roof for new cooling tower. | Cancelled | |
| 2014-05-21 | Building permit14 156818 | Construct interior alterations to offices, boardroom and kitchenette | Closed | |
| 2013-09-12 | Building permit13 232959 | Proposal to install 2" back flow preventer in existing office building. | Closed | |
| 2013-09-10 | Building permit13 221226 | Proposal for interior alterations to suite 204 - tenant is "Falconer LLP". | Closed | |
| 2012-11-20 | Building permit12 265215 | Proposal for inerior alterations in suite 200 on the second floor of existing office building | Closed | |
| 2012-11-20 | Building permit12 265182 | Proposal to partition part of existing floor area on the second floor into 3 suites (suite 200, suite 204 and suite 206) | Closed | |
| 2005-09-07 | Building permit05 173278 | Interior alterations to existing office on the 3rd floor | Closed | |
| 2003-12-22 | Building permit03 112932 | Alter plans approved under B.P;#03-112932 to relocate existing exit sign. | Closed | |
| 2002-12-19 | Building permit02 196849 | Interior alterations to existing office-Suite 101 | Closed | |
| 2001-08-30 | Building permit01 170990 | install partitions on portion of 2nd floor. tenant: Canadian Cancer Society (this property has been renamed 10 Alcorn Ave) | Closed | |
| 2001-06-27 | Building permit01 146909 | Install fixture on 2nd floor: 1 kitchen sink Tenant: Canadian Cancer Society cost incl. 01 - 146884 | Closed | |
| 2001-06-18 | Building permit01 146904 | Alter existing h.v.a.c. system on portion of the 2nd floor. Tenant: Canadian Cancer Society cost incl. 01 - 146884 | Closed | |
| 2001-06-14 | Building permit01 146884 | Install partitions on portion of the 2nd floor. Tenant: Canadian Cancer Society | Closed | |
| 1997-04-25 | Building permit97 014563 | H.V.A.C. ALTER DUCTWORK ON PORTION OF 1ST FLOOR OFFICE. SUITE 103 TENANT: WORKABLES CENTRE INC. SEE 396304 EDC | Closed | |
| 1997-04-25 | Building permit97 014505 | INSTALL FIXTURES 1ST FLOOR 1 K.S., R 1 HWT., R 1-2 W.T., 1 FD. IN CONNECTION WITH B.P.#396304 COST INCL. WITH 396304 SS | Closed | |
| 1997-04-24 | Building permit97 014813 | INSTALL FIX. 1ST FL: 1 BATHTUB, 1 W.B., 1 KIT. SINK SEE: 396233(B) LG | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(745)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(745)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
10 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(745)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: likely fits
- Laneway suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x745)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- Ln 1 W Yonge N Alcorn, 28.2 m along it
- New house permit
- None since 2000
- House footprint
- 2,357 m²
- Back yard
- 26.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 7 development applications open within 300 m, up to 49 storeys
- In the Summerhill station area
- 5 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
7 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-St.Clair neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station1 min walk
- Yonge St at Alcorn Ave - Summerhill StationNearest TTC stop1 min walk
- Yonge StNearest cycling route1 min walk
- The York School - Mdl and Sr CampusSchool4 min walk
- Cottingham Jr Public SchoolSchool5 min walk
- De Lasalle College SchoolSchool7 min walk
- The Linden SchoolSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3270.8
- Robberycity median 69.525.8
- Auto theftcity median 192.664.5
- Theft over $5,000city median 46.132.2
- Break and entercity median 172.8374
- Theft from vehiclescity median 188.1116.1
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist