HousePrecheckCheck an address

1 Vega StarwayToronto · zoning, lot size and permit records

Also 10 Corvus Starway, 10 Virgo Starway, 11 Lyra Starway, 11 Ursa Starway, 11 Vega Starway and 89 more

Residential townhouse · RT (x301)258.4 × 116.0 m25,687 m²on Vega Starway

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 2.6 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 205658 (Proposal for interior alterations to new bathroom on third floor, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 33 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • Major Transit Station Area: Don MillsThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
258.4 m frontage116.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 205658 (Proposal for interior alterations to new bathroom on third floor, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 33 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit25 205658Inspection

    Proposal for interior alterations to new bathroom on third floor

    Aug 8, 2025 · 18 VIRGO STARWAY
  • By-law investigation25 171902 WST 00 IRClosed

    Waste

    Jun 5, 2025 · 44 CORVUS STARWAY
  • Building permit24 243558Closed

    PROPOSED VEHICLE IMPACT DAMAGE RESTORATION REPAIRS.

    Nov 29, 2024 · 11 URSA STARWAY
  • Zoning review05 129465 LTOClosed
    May 5, 2005 · 46 CORVUS STARWAY
  • Building permit03 167433Closed

    New ductwork to fire-damaged single family dwelling.

    Sep 30, 2003 · 4 VIRGO STARWAY
  • Building permit03 163180Closed

    Fire damage

    Aug 5, 2003 · 4 VIRGO STARWAY

Check before you build

  • Site-specific exception 900.5.10(301)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.5.10(301)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of North York by-law 21769.

By-law 569-2013, Chapter 900

Lot facts

Area
25,687 m²
Frontage
258.4 m
Depth
116 m
Street
Vega Starway
Corner lot
No
Public lane
None
Max height
10.5 m
Max lot coverage
25%
  • Major Transit Station Area: Don Mills. The lot is inside the Don Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 731). Source
  • Sheppard East Subway Corridor Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RT (x301) (Residential Townhouse). Chapter 10, section 10.60 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
7

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for interior alterations with mechanical, electrical and plumbing work to suit new layout in suite 201 for the Terry Fox Foundation.

    2005 SHEPPARD AVE E · Nov 19, 2026 · 254 m away
  • Building permit

    Proposed one storey rear addition of a 165.2 square metre multi-purpose room.

    25 FOREST MANOR RD · Oct 1, 2026 · 281 m away
  • Building permit

    Proposal for multiple projects (relocate multiple portables, demolish an existing portable, alter site features and alter electrical services).

    25 FOREST MANOR RD · May 14, 2026 · 281 m away
  • Building permit

    Proposal for interior alterations to office

    2005 SHEPPARD AVE E · Mar 2, 2026 · 254 m away
  • Building permit

    New powder room in an existing townhouse

    15 CETUS STARWAY · Feb 26, 2026 · 188 m away
  • Building permit

    New powder room in an existing townhouse

    15 CETUS STARWAY · Feb 13, 2026 · 188 m away
  • Zoning review

    Closed

    25 FOREST MANOR RD · Aug 25, 2025 · 281 m away
  • Building permit

    Proposal for interior alterations to new bathroom on third floor

    18 VIRGO STARWAY · Aug 8, 2025 · 24 m away
  • Development application

    Site Plan application for the redevelopment of the lands with a 33-storey residential apartment building with 384 rental units, including six (6) affordable rental housing units. The existing 19-storey residential apartment building with 188 rental units will be retained. Five (5) of the ten (10) existing three (3)-storey rental townhouses will be retained and five (5) will be demolished to accommodate the proposed development.

    123 PARKWAY FOREST DR · Jul 29, 2025 · 276 m away · City file
  • Building permit

    Interior alteration of Medical Office and revised layout.

    2005 SHEPPARD AVE E · Jun 12, 2025 · 254 m away

Neighbourhood: Henry Farm

About the area around the lot, not the lot itself.

Nearest station
Don Mills Station9 min walk
Nearest TTC stop
Yorkland Blvd (North) at Yorkland Rd6 min walk
Nearest cycling route
Shaughnessy BlvdSigned Route (No Pavement Markings), 15 min walk
Nearest traffic count
9,900 vehicles in 8 hYorkland Rd / Herons Hill Way, 330 m away, Jul 16, 2012
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Parkway Forest Park1 min walk
David Caplan Park11 min walk
Betty Sutherland Trail Park12 min walk

Schools within 1 km

  • FOREST MANOR PUBLIC SCHOOL English Public 5 min walk
  • NORTH TORONTO CHRISTIAN SCHOOL Private 5 min walk
  • CESTAR HIGH SCHOOL Private 6 min walk
  • ABU HURAIRA ISLAMIC CENTRE AND ACADEMY Private 7 min walk
  • OXFORD COLLEGE OF CANADA SECONDARY SCHOOL Private 10 min walk
  • AMBERWOOD ACADEMY Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHenry FarmMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home39%54%
Population (2021)19,84016,813
Homes built in 1960 or before5%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHenry FarmCity median
Assault286.8636.3
Robbery51.169.5
Homicide3.95.3
Shootings3.910.5
Auto theft192.5192.6
Theft over $5,00027.546.1
Break and enter55172.8
Theft from vehicles94.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.