HousePrecheckCheck an address

1 Thorncliffe Park DrToronto · zoning, lot size and permit records

Employment · EO 2.0 (e0.75; o2.0) (x20)41.7 × 56.4 m2,348 m²on Thorncliffe Park Drcorner, also on Banigan Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 24 243040 (Proposal to install 3 site trailers with a total GFA of 602m2 too support construction..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • Major Transit Station Area: Thorncliffe ParkThe City plans more homes around the station: good for transit, and more building over time.
N20 m
41.7 m frontage56.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 243040 (Proposal to install 3 site trailers with a total GFA of 602m2 too support construction..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit24 243040Permit Issuednew building

    Proposal to install 3 site trailers with a total GFA of 602m2 too support construction of Metrolinx's Ontario Line project

    Sep 22, 2025 · 1 THORNCLIFFE PARK DR
  • Building permit24 229755Cancelled

    Proposal to Supply & Install the Wet Utilities for 1 Thorncliffe Site Office Trailers, Including Plumbing, Inspection, Engineering Fees, and Water Sanitary & Storm.

    Oct 22, 2024 · 1 THORNCLIFFE PARK DR
  • Building permit24 144764Closeddemolition

    Demolish existing office building for future OMSF site related to Metrolinx Ontario Line RSSOM project

    May 8, 2024 · 1 THORNCLIFFE PARK DR
  • Zoning review21 205794 LTOClosed
    Aug 30, 2021 · 1 THORNCLIFFE PARK DR
  • Building permit16 184643Closed

    Proposal to install a 1/2 inch backflow prevention device.

    Jul 28, 2016 · 1 THORNCLIFFE PARK DR
  • Zoning review12 255452 000Cancelled
    Sep 28, 2012 · 1 THORNCLIFFE PARK DR
  • Building permit10 260386Closed

    Plumbing - Yoga Studio on the ground floor unit 1

    Jan 7, 2011 · 1 THORNCLIFFE PARK DR

Check before you build

  • Site-specific exception 900.24.10(20)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.24.10(20)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Regulations 60.40.40.10(1) and (2) do not apply to a transportation use

  2. Rule B

    Regulations 60.40.40.70(1), (2), and (3) do not apply to a transportation use

  3. Rule C

    Despite Clause 60.40.50.10(1), any lot line abutting a street for lots with a transportation use must have a minimum 1.0 metre wide strip of soft landscaping along the entire length of the lot line , exclusive of driveways and walkways

  4. Rule D

    Regulation 60.40.30.20(1) does not apply to a transportation use

  5. Rule E

    None of the provisions of By-law 569-2013 will apply to prevent the erection or use of a construction office for the purpose of constructing a transportation use

  6. Rule F

    The maximum permitted floor space index for a transportation use in a building is 2.0 times the area of the lot . Prevailing By-laws and Prevailing Sections: (A) Section 8.4.1(c), Section 8.4.1(d) and Section 8.4.1(e), former Town of Leaside By-law 1916. .

  7. Older by-law A

    Regulations 60.40.40.10(1) and (2) do not apply to a transportation use

  8. Older by-law B

    Regulations 60.40.40.70(1), (2), and (3) do not apply to a transportation use

  9. Older by-law C

    Despite Clause 60.40.50.10(1), any lot line abutting a street for lots with a transportation use must have a minimum 1.0 metre wide strip of soft landscaping along the entire length of the lot line , exclusive of driveways and walkways

  10. Older by-law D

    Regulation 60.40.30.20(1) does not apply to a transportation use

  11. Older by-law E

    None of the provisions of By-law 569-2013 will apply to prevent the erection or use of a construction office for the purpose of constructing a transportation use

  12. Older by-law F

    The maximum permitted floor space index for a transportation use in a building is 2.0 times the area of the lot . Prevailing By-laws and Prevailing Sections: (A) Section 8.4.1(c), Section 8.4.1(d) and Section 8.4.1(e), former Town of Leaside By-law 1916. .

By-law 569-2013, Chapter 900

Lot facts

Area
2,348 m²
Frontage
41.7 m
Depth
56.4 m
Street
Thorncliffe Park Dr
Corner lot
Yes, also on Banigan Dr56.4 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Thorncliffe Park. The lot is inside the Thorncliffe Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 767). Source
  • Zone EO 2.0 (e0.75; o2.0) (x20) (Employment Office). Chapter 60, section 60.40 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: honey locust skyline (13 cm), honey locust skyline (13 cm), honey locust skyline (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved with conditions

    To permit the reconfiguration of the existing parking spaces for the commercial office building. Please note, this application was previously deferred Thursday, August 20, 2020, in order to allow the applicant an opportunity to meet the statutory notification requirements.

    14-16 OVERLEA BLVD · Aug 19, 2019 · 192 m away

Latest activity nearby

  • Building permit

    Proposed installation of a temporary water connection to provide a water supply required to support the approved construction activities associated with the guideway piers.

    10 OVERLEA BLVD · Oct 28, 2026 · 231 m away
  • Building permit

    The proposed Site Services Permit involves realigning the existing storm infrastructure to avoid conflictswith the new guideway piers, while maintaining the current drainage capacity. The work includes therelocation of a storm catch basin and associated connections.

    20 OVERLEA BLVD · May 28, 2026 · 85 m away
  • Building permit

    Proposal for alternative solution to code compliance for stations related to the application of emergency power.

    26 OVERLEA BLVD · Mar 18, 2026 · 80 m away
  • Building permit

    Proposal for removal for fire damage of compressed wood fibre boards, sandwiched in the 25mm interstitial space between the perimeter shear walls of 11 Thorncliffe Park Drive and 21 Overlea. See also 26 126986 BLD 00 BA

    11 THORNCLIFFE PARK DR · Mar 13, 2026 · 253 m away
  • Building permit

    Proposal for removal for fire damage of compressed wood fibre boards, sandwiched in the 25mm interstitial space between the perimeter shear walls of 11 Thorncliffe Park Drive and 21 Overlea. See also 26 126976 BLD 00 BA

    21 OVERLEA BLVD · Mar 12, 2026 · 254 m away
  • Building permitdemolition

    Proposal to demolish existing building for future OMSF area related to the Ontario Line RSSOM project

    4 THORNCLIFFE PARK DR · Nov 27, 2025 · 87 m away
  • Building permit

    1 ground sign + 1 wall sign**MASJID DARUSSALAM**

    20 OVERLEA BLVD · Oct 23, 2025 · 85 m away
  • Building permit

    Proposal for backflow preventer device installation

    28 OVERLEA BLVD · Oct 17, 2025 · 115 m away
  • Building permit

    It is proposed to provide an alternative solution approach to code compliance for stations related to the application of spatial separation for exterior walls of the station of prescriptions of OBC Subsection 3.2.3.

    28 OVERLEA BLVD · Oct 6, 2025 · 115 m away
  • Zoning review

    Closed

    25 OVERLEA BLVD · Sep 30, 2025 · 181 m away

Neighbourhood: Thorncliffe Park

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station21 min walk
Nearest TTC stop
Overlea Blvd at Thorncliffe Park Dr (West)2 min walk
Nearest cycling route
Thorncliffe Park DrCycle Track, 2 min walk
Nearest traffic count
15,268 vehicles in 8 hOverlea Blvd / Thorncliffe Park Dr (West), 140 m away, Apr 22, 2023
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
Leaside Park5 min walk
R.V. Burgess Park7 min walk
E.T. Seton Park8 min walk

Schools within 1 km

  • OVERLEA LINC English Public 3 min walk
  • FRASER MUSTARD EARLY LEARNING ACADEMY English Public 10 min walk
  • THORNCLIFFE PARK PUBLIC SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThorncliffe ParkMedian neighbourhood
Median household income (2020)$67,000$84,500
Households that own their home14%54%
Population (2021)20,40016,813
Homes built in 1960 or before21%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThorncliffe ParkCity median
Assault638636.3
Robbery83.969.5
Auto theft377.7192.6
Theft over $5,00054.646.1
Break and enter104.9172.8
Theft from vehicles226.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.