HousePrecheckCheck an address

1 Sumach StToronto · zoning, lot size and permit records

Commercial residential · CR SS2 (x341)≈ 29.5 × 48.3 m799 m²on Sumach Stcorner, also on Adelaide St E

Not a home

Land without a building

A demolition permit (24 196574, 2024) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 24 196574 (Proposed demolition of existing building, 2024); 26 239852 STE 13 OZ (Lift the (H), 2026); 25 242829 STE 13 SA (Site Plan Control Application to facilitate the development of the site with two mixed..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N10 m
≈ 29.5 m frontage≈ 48.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 1995

    Needs a closer look

    Still open in the City's records: 94 023098 (CONSTRUCT 3 STOREY ARTISTS STUDIOS, 1995, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 196574 (Proposed demolition of existing building, 2024); 26 239852 STE 13 OZ (Lift the (H), 2026); 25 242829 STE 13 SA (Site Plan Control Application to facilitate the development of the site with two mixed..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Development application26 239852 STE 13 OZUnder Review

    Lift the (H)

    Sep 18, 2026 · 1 SUMACH ST · City file
  • Development application25 242829 STE 13 SAUnder Review

    Site Plan Control Application to facilitate the development of the site with two mixed use buildings: 59 and 55 storeys, containing 1,284 dwelling units and 1,662 square metres of non-residential gross floor area.

    Oct 21, 2025 · 1 SUMACH ST · City file
  • Building permit24 196574Under Reviewdemolition

    Proposed demolition of existing building.

    Aug 12, 2024 · 1 SUMACH ST
  • Zoning review21 204556 POZClosed
    Sep 13, 2021 · 1 SUMACH ST
  • Development application21 204556 STE 13 OZClosed

    Official Plan and Zoning By-law Amendment Application to facilitate the development of the site with a 59-storey mixed use building and a 55-storey residential building (204 and 191 metres, including mechanical penthouse), containing 1,276 dwelling units and a minimum of 1,200 square metres of nonresidential gross floor area.

    Aug 26, 2021 · 1 SUMACH ST · City file
  • Zoning review13 274245 ZPRClosed
    Dec 5, 2013 · 1 SUMACH ST
  • Zoning review13 118100 ZPRClosed
    Feb 11, 2013 · 1 SUMACH ST
  • Zoning review08 110369 ZPRClosed
    Feb 11, 2008 · 1 SUMACH ST
Show 4 older records
  • Zoning review01 201797 000Closed
    Dec 12, 2001 · 1 SUMACH ST
  • Building permit96 012941Closed

    INSTALL ON 2ND FLOOR: 3 W.B., 3 SHOWERS, 3 W.C., 3 V.F.D. 3 WASH TUBS, SEE 367716 EDC INSTALL INTERIOR BUILDING DRAINS

    Feb 15, 1996 · 1 SUMACH ST
  • Building permit96 012542Closed

    INSTALL 1 1\2 " WATER SERVICE, 6" SANITARY AND STORM DRAINS. PLANS FROM PROPERTY LINE TO INSIDE FRONT WALL BP COST INCL 367716

    Jan 23, 1996 · 1 SUMACH ST
  • Building permit94 023098Inspection

    CONSTRUCT 3 STOREY ARTISTS STUDIOS

    Jun 9, 1995 · 1 SUMACH ST

Check before you build

  • Site-specific exception 900.11.10(341)

    Needs a closer look

    6 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(341)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900.11.10(2)

  2. Rule B

    Despite regulation 40.10.20.40(1), dwelling units are permitted in an Apartment Building , Mixed Use Building or Townhouse

  3. Rule C

    A building or structure must be set back a minimum of 5.0 metres from an elevated roadway structure

  4. Rule D

    If a lot with a building is identified as a heritage site , any portion of a building that exceeds the height of the conserved heritage building, whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres

  5. Rule E

    Despite regulation 40.10.40.10(5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less 3.7 metres

  6. Rule G

    Despite regulation 40.10.40.70(2)(G), for a lot abutting Eastern Avenue:

  7. Older by-law A

    Section 12 (2) 270 (a) of former City of Toronto By-law 438-86

1 part for other addresses
  • B On 2 Eastern Avenue and 90 Trinity Street, City of Toronto By-law 110-2010.
By-law 569-2013, Chapter 900

Lot facts

Area
799 m²
Frontage
29.5 mestimated, irregular lot
Depth
48.3 mestimated, irregular lot
Street
Sumach St
Corner lot
Yes, also on Adelaide St E48.3 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
30 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR SS2 (x341) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: elm, slippery (22 cm), tree of heaven (16 cm), tree of heaven (11 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%20 of 20 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
4
Development applications
21

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 431 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 285 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 285 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 273 m away
  • Minor varianceApproved

    To alter the existing five-storey mixed-use building containing 26 residential dwelling units and 3 artist studios (on the ground level), by constructing an additional residential dwelling unit within the mechanical penthouse, for a total of 27 residential dwelling units.

    41 RIVER ST · May 15, 2024 · 467 m away

Latest activity nearby

  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 177 m away
  • Building permit

    PROPOSED ALTERATIONS TO SECOND FLOOR

    491 QUEEN ST E · Nov 17, 2026 · 258 m away
  • Zoning review

    Not Started

    16 EASTERN AVE · Nov 6, 2026 · 268 m away
  • Zoning review

    Closed

    455 FRONT ST E · Oct 29, 2026 · 226 m away
  • Zoning review

    Closed

    10 EASTERN AVE · Oct 28, 2026 · 291 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 176 m away
  • Zoning review

    Application Acceptable

    398 KING ST E · Oct 14, 2026 · 285 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 176 m away
  • Zoning review

    Closed

    14 EASTERN AVE · Oct 5, 2026 · 273 m away
  • Minor variancePending

    To alter the existing two-storey townhouse dwelling by constructing a side (west) third storey staircase enclosure, a rooftop deck with guardrails (wooden fence), and a rooftop pergola.

    21 SACKVILLE ST · Oct 5, 2026 · 159 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station28 min walk
Nearest TTC stop
King St East at Sumach St2 min walk
Nearest cycling route
Cherry StBike Lane, 1 min walk
Nearest traffic count
10,442 vehicles in 8 hEastern Ave Diversion / Old Foundry Rd / Eastern Ave, 30 m away, Mar 24, 2022
Serious collisions within 500 m
62021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 2 with cyclists
Parks
Percy Park1 min walk
Underpass Park2 min walk
Diamond Jubilee Promenade3 min walk

Schools within 1 km

  • INGLENOOK COMMUNITY SCHOOL English Public 2 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 7 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 8 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 9 min walk
  • LIBERTY PREP SCHOOL Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.