HousePrecheckCheck an address

1 Reidmount AveToronto · zoning, lot size and permit records

Residential apartment · RA (au62.5) (x770)≈ 79.6 × 86.7 m5,001 m²on Reidmount Avecorner, also on 10 Reidmount Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.5 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 18 202629 ESC 39 SA (Construct Agincourt GO Transit station ancillary building, platforms, canopies, rail li..., 2018). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • Major Transit Station Area: AgincourtThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 79.6 m frontage≈ 86.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (22% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2017

    Needs a closer look

    Still open in the City's records: 17 220065 (Installing of EIFS cladding to the walls, replacement of sealant materials, and localiz..., 2017, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Zoning): 25 237625 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 18 202629 ESC 39 SA (Construct Agincourt GO Transit station ancillary building, platforms, canopies, rail li..., 2018).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 249989 ZZUClosed
    Oct 6, 2026 · 1 REIDMOUNT AVE
  • By-law investigation25 237625 ZON 00 IRClosed

    Zoning

    Oct 9, 2025 · 1 REIDMOUNT AVE
  • Zoning review25 204047 ZZUClosed
    Aug 1, 2025 · 1 REIDMOUNT AVE
  • Building permit21 188422Closed

    Localized concrete repairs on parking garage columns

    Aug 26, 2021 · 1 REIDMOUNT AVE
  • Development application18 202629 ESC 39 SAUnder Review

    Construct Agincourt GO Transit station ancillary building, platforms, canopies, rail lines, pedestrian tunnels, parking, landscaping

    Jul 31, 2018 · 4080 SHEPPARD AVE E · City file
  • Building permit17 220065Permit Issued

    Installing of EIFS cladding to the walls, replacement of sealant materials, and localized repairs to the garage expansion joint

    Sep 21, 2017 · 1 REIDMOUNT AVE
  • Building permit09 158129Closed

    Install one backflow preventor

    Oct 20, 2009 · 1 REIDMOUNT AVE
  • Zoning review09 163038 LPRClosed
    Aug 27, 2009 · 1 REIDMOUNT AVE
Show 4 older records
  • Building permit09 108588Closed - Dormant

    Rooftop telecommunications equipment shelter and antennas support only

    Apr 9, 2009 · 1 REIDMOUNT AVE
  • Zoning review09 118380 ZPUClosed
    Mar 19, 2009 · 1 REIDMOUNT AVE
  • Building permit08 194985Cancelled

    Constructing a condo apartment into a 4 bedroom suite

    Aug 19, 2008 · 1 REIDMOUNT AVE
  • Zoning review07 258726 ZPUClosed
    Sep 4, 2007 · 1 REIDMOUNT AVE

Check before you build

  • Site-specific exception 900.7.10(770)

    Needs a closer look

    6 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(770)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a front lot line that abuts a street is 3.0 metres

  2. Rule B

    The maximum lot coverage is 45%

  3. Rule C

    Amenity space must be provided at a minimum rate of 2.3 square metres for each dwelling unit

  4. Rule D

    The maximum building height is 43.0 metres

  5. Rule E

    The maximum height of a parking structure is 5.0 metres

  6. Rule F

    Parking space must be provided at a minimum rate of: (i) 1.0 for each dwelling unit and used for resident parking; and (ii) 0.3 for each dwelling unit and used for visitor parking.

  7. Older by-law A

    Schedule "C" Exception 70, of former City of Scarborough by-law 12360.

By-law 569-2013, Chapter 900

Lot facts

Area
5,001 m²
Frontage
79.6 mestimated, irregular lot
Depth
86.7 mestimated, irregular lot
Street
Reidmount Ave
Corner lot
Yes, also on 10 Reidmount Ave86.7 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Agincourt. The lot is inside the Agincourt Major Transit Station Area approved by the Province (Site and Area Specific Policy 694). Source
  • Zone RA (au62.5) (x770) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
86%6 of 7 decisions
Garden suite permits
7
Laneway suite permits
0
Multiplex permits
5
Development applications
1

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Not Started

    2351 KENNEDY RD · Nov 5, 2026 · 269 m away
  • Building permitmultiplex, new building, new house

    Revision 03 - Revision for changes to frontyard parking and driveway. ---------------------------------------------------------------------REV 02: Proposed Bathroom alterations, new shower Revision 01: Wall type change & stair depth alterations. Proposal for a new fourplex

    33 REIDMOUNT AVE · Nov 2, 2026 · 197 m away
  • Building permitmultiplex, new building, new house

    Revision 03 - Revision for changes to frontyard parking and driveway. ---------------------------------------------------------------------REV 02: Bathroom alterations, new shower Revision 01: Wall type change & stairs depth alterations. Proposal for a new fourplex

    33 REIDMOUNT AVE · Nov 2, 2026 · 197 m away
  • Zoning review

    Closed

    1 REIDMOUNT AVE · Oct 6, 2026 · 18 m away
  • Building permit

    Interior alterations to an existing dwelling to be converted into a dental clinic

    4142 SHEPPARD AVE E · Oct 6, 2026 · 279 m away
  • Building permit

    Interior alterations to an existing dwelling to be converted into a dental clinic

    4142 SHEPPARD AVE E · Aug 5, 2026 · 279 m away
  • Zoning review

    Closed

    2351 KENNEDY RD · Jul 6, 2026 · 269 m away
  • Building permitgarden suite

    Proposal to construct a garden suite

    33 REIDMOUNT AVE · Jul 2, 2026 · 197 m away
  • Building permitgarden suite

    Proposal to construct a garden suite

    33 REIDMOUNT AVE · Jul 2, 2026 · 197 m away
  • Building permit

    Alteration for restairant and Barrier Free Washroom

    4002 SHEPPARD AVE E · Jun 11, 2026 · 245 m away

Neighbourhood: Agincourt South-Malvern West

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station2 min walk
Nearest TTC stop
Sheppard Ave East at Reidmount Ave - Agincourt GO Station1 min walk
Nearest cycling route
Agincourt DrSharrows - Wayfinding, 6 min walk
Nearest traffic count
24,514 vehicles in 14 hSheppard Ave E / Reidmount Ave, 90 m away, Oct 20, 2026
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Collingwood Park2 min walk
Ron Watson Park7 min walk
Donalda Park8 min walk

Schools within 1 km

  • MAPLE LEAF COLLEGIATE SCHOOL Private 4 min walk
  • CANADA INTERNATIONAL COLLEGE SCHOOL Private 4 min walk
  • AGINCOURT JR PUBLIC SCHOOL English Public 8 min walk
  • AGINCOURT MONTESSORI SCHOOL Private 9 min walk
  • AGINCOURT COLLEGIATE INSTITUTE English Public 11 min walk
  • UNIQUE CHINESE SCHOOL - MIDLAND CAMPUS Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt South-Malvern WestMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home70%54%
Population (2021)24,17016,813
Homes built in 1960 or before10%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt South-Malvern WestCity median
Assault467636.3
Robbery94.869.5
Homicide75.3
Shootings21.110.5
Auto theft273.9192.6
Theft over $5,00038.646.1
Break and enter259.9172.8
Theft from vehicles242.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.