HousePrecheckCheck an address

1 Queen's ParkToronto · zoning, lot size and permit records

Also 111 Wellesley St W

≈ 194.4 × 198.8 m31,197 m²on Wellesley St Wcorner, also on Queen's Park Cres E

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 1 development application open within 300 m, up to 9 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
≈ 194.4 m frontage≈ 198.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 235221Cancelled

    Demountable stage for entertainers for performing on for event

    Sep 10, 2026 · 111 WELLESLEY ST W
  • Building permit17 178790Cancelled

    Proposal to erect 2 temporary certified tents (30' X 30' and 30' X 60'- #15-159498) at Queens Park South from June 29, 2017 to July 2, 2017. - Ministry of Citizenship for Canada Day

    Jun 13, 2017 · 111 WELLESLEY ST W
  • Development application16 221931 STE 20 OZClosed

    Official Plan Amendment application to establish a new University of Toronto St. George Campus Secondary Plan that would replace the existing University of Toronto Secondary Plan.

    Sep 13, 2016 · 1 QUEEN'S PARK · City file
  • Building permit16 179491Cancelled

    Erection of a temporary truss structure clad with banner material - "Canada Day Celebration"

    Jun 23, 2016 · 1 QUEEN'S PARK
  • Zoning review12 235980 LTOClosed
    Aug 27, 2012 · 1 QUEEN'S PARK
  • Building permit05 205334Closed

    To erect Vetran's Memorial Wall to Queen's Park

    Dec 14, 2005 · 1 QUEEN'S PARK
  • Building permit05 150657Closed

    Erect temporary stage with roof for Canada celebrations at Queen's Park. Erect from June 29- July 1, 2005.

    Jun 30, 2005 · 1 QUEEN'S PARK
  • Building permit04 154659Closed

    To install new trench drain as shown in drawings.(6 '')

    Jul 19, 2004 · 1 QUEEN'S PARK
Show 3 older records
  • Building permit04 121508Closed

    Install 1 mag. lock on 5th floor

    Apr 1, 2004 · 1 QUEEN'S PARK
  • Building permit03 194508Closed

    Make alaterations to existing duct work; install new air handling unit.

    Dec 3, 2003 · 1 QUEEN'S PARK
  • Building permit95 019904Closed

    RESTORATION TO EXTERIOR OF NORTH-WING ENTRY TO BUILDING. HOLD FOR HISTORICAL BOARD APPROVAL. LISTED: HISTORICAL EDC

    Oct 3, 1995 · 1 QUEEN'S PARK

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
31,197 m²
Frontage
194.4 mestimated, irregular lot
Depth
198.8 mestimated, irregular lot
Street
Wellesley St W
Corner lot
Yes, also on Queen's Park Cres E198.8 m along it
Public lane
None
House footprint
8,585 m²roof up to 55 m
Back yard
65.6 mhouse to rear lot line
Side yards
15.3 m and 30.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, norway (25 cm), maple, norway (25 cm), maple, norway (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1030-2022) for a new 40-storey mixed-use building, by increasing the building height, and to reduce the minimum number of vehicular parking spaces, the setback of the mechanical penthouse, and residential amenity space (indoor and outdoor).

    95 ST JOSEPH ST · Oct 16, 2024 · 398 m away
  • Minor varianceApproved

    To amend the development standards to permit the existing height of the four buildings on site (Hepburn Tower (11-storeys), Mowat Tower (24-storeys), Hearst Tower (10-storeys), and Ferguson Tower (14-storeys)) and to allow an increase in height of three of the buildings (Hepburn, Mowat, and Hearst towers) for the purpose of insulation and roof drainage.

    900 BAY ST · Oct 4, 2023 · 341 m away
  • Minor varianceApproved

    To alter the existing building by constructing a three-storey addition above the one-storey portion of the building.

    70 ST GEORGE ST · Sep 6, 2023 · 494 m away
  • Minor varianceApproved

    To alter Site Specific Zoning By-law 916-2022 to permit the construction of a development comprised of a 58-storey purpose-built rental residential building and to alter the existing 20-storey office building by constructing an additional 5 storeys.

    700 UNIVERSITY AVE · May 31, 2023 · 372 m away
  • Minor varianceApproved

    To alter the lawful non-conforming public transit use by installing a new exit/entrance structure (for Museum Station), within Queens Park, that will connect directly to the south end of the existing platform. The property has lawful non-conforming status under the Planning Act, as the Museum Station existed prior to the passing of the Zoning By-law, which does not permit the use of public transit in a G zone. Any change of use, alterations or additions to the building requires the permission of the Committee of Adjustment.

    110 WELLESLEY ST W · Dec 1, 2021 · 282 m away

Latest activity nearby

  • Building permit

    Revision 01: selective demo, new partitions, new door & frames, modification to power, lights HVAC, sprinkler & new millwork, new finishes.Selective demo, new partitions, new doors & frames, modifications to power, lights, HVAC, sprinkler, replace sink (one for one), new millwork, new finishes.

    150 COLLEGE ST · Nov 4, 2026 · 265 m away
  • Zoning review

    Application Acceptable

    112 COLLEGE ST · Oct 29, 2026 · 285 m away
  • Building permit

    Proposed wholesale removal and replacement of existing conventional BUR roof with a new two-ply cold-adhered conventional modified bitumen membrane assembly, wholesale replacement of parapet metal flashing, localized masonry repairs and mortar repointing as directed by the consultant, wholesale removal and replacement of the existing deteriorated roof deck and joists

    7 HART HOUSE CRCL · Oct 8, 2026 · 282 m away
  • Building permit

    Proposal to erect a temporary stage for Run For The Cure For CancerInstallation Date: October 03, 2026; Tear Down: October 04, 2026

    1 KING'S COLLEGE CRCL · Oct 5, 2026 · 268 m away
  • Building permit

    Interior alterations to remove demountable walls in offices on the second floor.

    150 COLLEGE ST · Oct 5, 2026 · 265 m away
  • Building permit

    Proposed interior alterations for interior renovation on part of 7th floor, Room 727 to convert a laboratory into 3 private faculty offices.

    144 COLLEGE ST · Sep 30, 2026 · 268 m away
  • Building permit

    Proposal for interior renovation of existing office suite on the second level of the building. This includes demolition of office walls, building of new office walls and ceilings, and the rework of mechanical and electrical fixtures to service the new spaces.

    150 COLLEGE ST · Sep 22, 2026 · 265 m away
  • Building permit

    Demountable stage for entertainers for performing on for event

    111 WELLESLEY ST W · Sep 10, 2026 · 88 m away
  • Building permit

    LEAP Project - U of TInstalling a single Heat Recovery Unit (HRU) located on the roof of the existing Block C of the Medical Sciences Building, located at 1 King¿s College Cir., Toronto, ON. The ducts from the HRU will penetrate the east side of the existing precast concrete clad exhaust stack enclosure and connect to existing ductwork and electrical systems.

    150 COLLEGE ST · Sep 3, 2026 · 265 m away
  • Building permit

    Add a floor drain to new ground floor mechanical room in the Research LabConvenience address is 160 College St

    150 COLLEGE ST · Aug 24, 2026 · 265 m away

Neighbourhood: Bay-Cloverhill

About the area around the lot, not the lot itself.

Nearest station
Queen's Park Station5 min walk
Nearest TTC stop
Wellesley St West at Parliament Building2 min walk
Nearest cycling route
Queen's Park CresCycle Track, 1 min walk
Nearest traffic count
15,564 vehicles in 8 hQueen's Park Trl / Queens Pr S Wellesley Ramp / Wellesley Queens Pr S Ramp / Wellesley St W, 140 m away, Jan 18, 1984
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Queen's Park2 min walk
Clover Hill Park7 min walk
Breadalbane Park8 min walk

Schools within 1 km

  • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 5 min walk
  • ST JOSEPH'S COLLEGE SCHOOL English Separate 5 min walk
  • ORDE STREET JR PUBLIC SCHOOL English Public 7 min walk
  • SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 7 min walk
  • RONALD MCDONALD HOUSE Private 8 min walk
  • MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBay-CloverhillMedian neighbourhood
Median household income (2020)$58,400$84,500
Households that own their home30%54%
Population (2021)16,67016,813
Homes built in 1960 or before4%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBay-CloverhillCity median
Assault601.9636.3
Robbery74.769.5
Auto theft16.6192.6
Theft over $5,00087.246.1
Break and enter286.4172.8
Theft from vehicles145.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.