HousePrecheckCheck an address

1 McDonald's PlToronto · zoning, lot size and permit records

≈ 142.3 × 93.4 m9,522 m²on McDonald's Pl

Not a home

Parkland Initiative

The City of Toronto's real estate inventory lists Parkland Initiative here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 13 241322 (New Garage Repair/Reconstruction to Mc Donald's Restaurants of Canada commercial office..., 2013, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 52 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
≈ 142.3 m frontage≈ 93.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 13 241322 (New Garage Repair/Reconstruction to Mc Donald's Restaurants of Canada commercial office..., 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 52 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit17 190808Cancelled

    External garage ramp repairs

    Jun 30, 2017 · 1 MCDONALD'S PL
  • Building permit17 161665Closed

    Proposal for interior alterations to select areas of ground floor of an existing office building.

    Jun 9, 2017 · 1 MCDONALD'S PL
  • Building permit13 273767Closed

    Installation of backflow preventer (BFP-1 & 2) at underground level

    Oct 20, 2015 · 1 MCDONALDS PL
  • Building permit13 241322Inspection

    New Garage Repair/Reconstruction to Mc Donald's Restaurants of Canada commercial office building.

    Oct 17, 2013 · 1 MCDONALD'S PL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
9,522 m²
Frontage
142.3 mestimated, irregular lot
Depth
93.4 mestimated, irregular lot
Street
McDonald's Pl
Corner lot
No
Public lane
None
House footprint
1,863 m²roof up to 30.6 m
Back yard
18.1 mhouse to rear lot line
Side yards
28.3 m and 47.5 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    4

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      The project involves converting five (5) floors of an existing office building to self-storage. This application builds upon the previous Minor Variance application approved in July of 2025, File #A0308/24NY and an ongoing Site Plan Approval application (Site Plan Application No. 24208640NNY16SA). The previously approved Minor Variance application permitted self-storage uses on lower three levels of the building. A new Minor Variance application is being filed to permit two additional floors of self-storage uses.

      90 WYNFORD DR · May 1, 2025 · 344 m away
    • Minor varianceApproved

      Proposal to convert the first three floors of the existing office building to self-storage. Floors 3 to 5 will remain as office.

      90 WYNFORD DR · Jul 18, 2024 · 344 m away
    • Minor varianceRefused

      To seek relief from the provisions of the Zoning By-law related to number of dwelling units, dwelling width and setbacks, and parking space dimensions for the townhouse development.

      200 DAVID DUNLAP CRCL · Dec 7, 2023 · 407 m away
    • Minor varianceApproved

      To convert the vacant office space to a daycare facility.

      1 CONCORDE GT · Nov 7, 2019 · 141 m away
    • Minor varianceApproved

      This is an application to permit an increase in the number of dwelling units and a decrease in the amount of parking required for the final phase of the larger developement of the Don Greenbelt Community.

      120 DALLIMORE CRCL · Jun 23, 2010 · 390 m away

    Latest activity nearby

    • Building permit

      Proposal for restoration and protection of balcony structures

      75 WYNFORD HEIGHTS CRES · Oct 20, 2026 · 248 m away
    • Zoning review

      Closed

      1 CONCORDE GT · Aug 24, 2026 · 141 m away
    • Building permit

      Proposed installation of a 40'x160' Frame Tent for a Corporate BBQ Staff Appreciation Event. Install on July 10th and Remove on July 10th 2026

      1 CONCORDE GT · Jul 7, 2026 · 141 m away
    • Building permit

      Proposal for energency correction to existing life safety electrical in existing building.

      133 WYNFORD DR · Sep 30, 2025 · 107 m away
    • Building permit

      1 Wall Sign

      1 CONCORDE GT · Aug 15, 2025 · 141 m away
    • Building permit

      Installation of a 40'x60' Frame Tent for a Corporate Staff Appreciation Event. Date Erected - July 8, 2025 Date Removed - July 8, 2025

      1 CONCORDE GT · Jul 3, 2025 · 141 m away
    • Building permit

      Localized concrete and waterproofing repairs within the underground garage.

      5 CONCORDE PL · Jul 3, 2025 · 292 m away
    • Building permit

      Proposal for Wholesale replacement of slab waterproofing system and expansion joint seals, localized concrete repairs. Whole sale replacement of entrance ramp waterproofing and snow melt system and localized concrete repairs on ramp. Removal and replacement of floor and trench drains as needed in the parking garage. Urethane injection of structure leaking cracks. Repainting of parking lines.

      1 CONCORDE PL · Jun 26, 2025 · 159 m away
    • Building permit

      Proposal to construct interior alterations to existing office tenant for new layout.

      1 CONCORDE GT · Jun 25, 2025 · 141 m away
    • Building permit

      Proposal for Wholesale replacement of slab waterproofing system and expansion joint seals, localized concrete repairs. Whole sale replacement of entrance ramp waterproofing and snow melt system and localized concrete repairs on ramp. Removal and replacement of floor and trench drains as needed in the parking garage. Urethane injection of structure leaking cracks. Repainting of parking lines.

      3 CONCORDE PL · Jun 16, 2025 · 198 m away

    Neighbourhood: Banbury-Don Mills

    About the area around the lot, not the lot itself.

    Nearest station
    Wynford Station7 min walk
    Nearest TTC stop
    Wynford Dr at Concorde Pl West Side1 min walk
    Nearest cycling route
    East Don River TrlMulti-Use Trail, 2 min walk
    Nearest traffic count
    9,117 vehicles in 8 hConcorde Pl / Wynford Dr / Wynford Heights Cres, 100 m away, Apr 6, 2022
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 2 fatal, 1 with pedestrians, 1 with cyclists
    Parks
    Wynford Park2 min walk
    Charles Sauriol Conservation Area2 min walk
    Moccasin Trail Park6 min walk

    Schools within 1 km

    • BRIGHTON SCHOOL Private 3 min walk
    • ECOLE ELEMENTAIRE JEANNE LAJOIE French Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBanbury-Don MillsMedian neighbourhood
    Median household income (2020)$91,000$84,500
    Households that own their home60%54%
    Population (2021)27,15516,813
    Homes built in 1960 or before24%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBanbury-Don MillsCity median
    Assault404.9636.3
    Robbery101.269.5
    Shootings9.210.5
    Auto theft220.9192.6
    Theft over $5,00067.546.1
    Break and enter248.5172.8
    Theft from vehicles211.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.