HousePrecheckCheck an address

1 Maidenhair LaneToronto · zoning, lot size and permit records

Open space · O≈ 54.5 × 42.8 m1,169 m²on Maidenhair Lane

Not a home

Neilson Park

The City of Toronto's real estate inventory lists Neilson Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
≈ 54.5 m frontage≈ 42.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    1,169 m²
    Frontage
    54.5 mestimated, irregular lot
    Depth
    42.8 mestimated, irregular lot
    Street
    Maidenhair Lane
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permitsecondary suite

      Proposal for designing a basement as per OBC in order to register the basement as a second dwelling unit/legal basement with separate below grade entrance.

      9 HORSESHOE CRES · Oct 16, 2026 · 203 m away
    • Building permit

      supply and install backwater valve

      57 HORSESHOE CRES · Sep 29, 2026 · 149 m away
    • Building permitsecondary suite

      Proposal for designing a basement as per OBC in order to register the basement as a second dwelling unit/legal basement with separate below grade entrance.

      9 HORSESHOE CRES · Sep 25, 2026 · 203 m away
    • Building permit

      Proposal for a below grade side yard basement walkout with a side basement entrance to this existing detached SFD.

      20 HORSESHOE CRES · Aug 18, 2026 · 223 m away
    • Building permit

      Proposal for an enclosed addition structure.

      11 GLANVIL CRES · Jun 19, 2026 · 137 m away
    • Building permitsecondary suite

      Proposal to add a 2nd suite in the basement with new below grade stairs and a new egress window.

      37 RED HAWK RD · Jun 10, 2024 · 262 m away
    • Building permit

      Proposed installation of a new air conditioning units for cooling centre in gym of an existing elementary school.

      75 HUPFIELD TRL · May 22, 2024 · 267 m away
    • Building permit

      Design of a fire alarm system upgrade including but not limited to the replacement of the fire alarm system control panel and associated auxiliary devices.

      75 HUPFIELD TRL · Oct 23, 2023 · 267 m away
    • Building permit

      As-built shed and porch in rear yard.

      67 HORSESHOE CRES · Jun 5, 2023 · 179 m away
    • Building permitsecondary suite

      Proposed basement apartment (second unit), proposed below grade entrance in rear yard,And two new windows.

      20 BLACKBIRD GT · Oct 31, 2022 · 278 m away

    Neighbourhood: Malvern West

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Hupfield Trail at Horseshoe Cres (North)4 min walk
    Nearest cycling route
    Finch Ave EBike Lane, 6 min walk
    Nearest traffic count
    13,504 vehicles in 14 hNeilson Rd / Crow Trl / Neilson Park Trl, 330 m away, Oct 26, 2025
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Neilson Park - Scarborough1 min walk
    Viola Desmond Park3 min walk
    Mourning Dove Park3 min walk

    Schools within 1 km

    • SACRED HEART CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
    • MARY SHADD PUBLIC SCHOOL English Public 5 min walk
    • ST GABRIEL LALEMANT CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • WHITEFIELD CHRISTIAN SCHOOLS - BLDG 2 Private 10 min walk
    • WHITEFIELD CHRISTIAN SCHOOLS - BLDG 1 Private 10 min walk
    • ST MOTHER TERESA CATHOLIC ACADEMY English Separate 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureMalvern WestMedian neighbourhood
    Median household income (2020)$88,000$84,500
    Households that own their home74%54%
    Population (2021)17,32016,813
    Homes built in 1960 or before6%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleMalvern WestCity median
    Assault635636.3
    Robbery125.969.5
    Shootings27.410.5
    Auto theft366.8192.6
    Theft over $5,00065.746.1
    Break and enter43.8172.8
    Theft from vehicles208188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.