HousePrecheckCheck an address

1 Jefferson AveToronto · zoning, lot size and permit records

20.0 × 86.3 m1,659 m²on Jefferson Ave

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 138543 (Proposal for alternative solution regards to the Bike Storage Spatial Separation for th..., 2026); 25 268368 (Proposal for Alternative Solution for Standpipe Riser Protection at Exhibition Station, 2025); 25 124000 (Alternative Solution for the combustibility of an ETFE Roofing Material, 2025); and 5 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N20 m
20.0 m frontage86.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 138543 (Proposal for alternative solution regards to the Bike Storage Spatial Separation for th..., 2026); 25 268368 (Proposal for Alternative Solution for Standpipe Riser Protection at Exhibition Station, 2025); 25 124000 (Alternative Solution for the combustibility of an ETFE Roofing Material, 2025); and 5 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 138543Deficiency Notice Issued

    Proposal for alternative solution regards to the Bike Storage Spatial Separation for the OLS Exhibition Station.

    Apr 2, 2026 · 1 JEFFERSON AVE
  • Building permit25 268368Deficiency Notice Issued

    Proposal for Alternative Solution for Standpipe Riser Protection at Exhibition Station

    Dec 19, 2025 · 1 JEFFERSON AVE
  • Building permit25 237662Approved

    Proposal for Alternative Design Solution (ADS), which addresses the topic ETFE Roof (Structural)

    Oct 9, 2025 · 1 JEFFERSON AVE
  • Building permit23 199437Cancelled

    Conditional Permit - Part Permit - Construct new station for Ontario Line - Exhibition Station

    Sep 19, 2025 · 1 JEFFERSON AVE
  • Building permit25 227112Under Review

    Proposal for alternative solution which addresses the topic of Structural Fire Engineering Analysis

    Sep 18, 2025 · 1 JEFFERSON AVE
  • Building permit25 124000Deficiency Notice Issued

    Alternative Solution for the combustibility of an ETFE Roofing Material

    Mar 3, 2025 · 1 JEFFERSON AVE
  • Building permit25 111845Deficiency Notice Issued

    Platform Clearance

    Feb 3, 2025 · 1 JEFFERSON AVE
  • Building permit25 106701Approved

    Elevator Shaft Fire - Resistance Rating

    Jan 20, 2025 · 1 JEFFERSON AVE
Show 10 older records
  • Building permit25 106063Deficiency Notice Issued

    Egress from Service Stations

    Jan 17, 2025 · 1 JEFFERSON AVE
  • Building permit25 105911Deficiency Notice Issued

    Protected Route Separation

    Jan 17, 2025 · 1 JEFFERSON AVE
  • Building permit24 185536Approved

    Unsprinklered Elevator Truss- Exhibition Station

    Jul 22, 2024 · 1 JEFFERSON AVE
  • Zoning review23 154398 PSPClosed
    Jun 12, 2023 · 1 JEFFERSON AVE
  • Development application23 154398 STE 10 SAUnder Review

    Ontario Line Exhibition Station

    Jun 1, 2023 · 1 JEFFERSON AVE · City file
  • Building permit18 204021Closed

    Proposed construction of a 40' x 100' x 8' Certified tent. Proposed installation date; August 8, 2018 and dismantle date; August 10th, the event will take place on August 9th.

    Aug 15, 2018 · 1 JEFFERSON AVE
  • Zoning review13 257079 LPRClosed
    Oct 28, 2013 · 1 JEFFERSON AVE
  • Zoning review07 284932 ZPRClosed
    Dec 6, 2007 · 1 JEFFERSON AVE
  • Zoning review05 193077 ZSVClosed
    Oct 12, 2005 · 1 JEFFERSON AVE
  • Zoning review99 116623 000Closed
    Dec 16, 1999 · 1 JEFFERSON AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,659 m²
Frontage
20 m
Depth
86.3 m
Street
Jefferson Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    7

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 873-2024), for the phased multi-building, mixed-use redevelopment (Blocks 1-6) with a public park, Privately-Owned Publicly Accessible Spaces (POPS), and an extension of the existing public municipal road network, with respect to the phased issuance of building permit type and/or phased development on the lands provided that each phased development has frontage and access to a public highway. A related Site Plan Control application (20 23 137812 STE 10 SA) is currently under review.

      61 HANNA AVE · Aug 13, 2025 · 419 m away
    • Minor varianceApproved

      To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).

      41 FRASER AVE · Mar 5, 2025 · 291 m away
    • Minor varianceApproved

      To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).

      47 FRASER AVE · Mar 5, 2025 · 308 m away
    • Minor varianceApproved

      To alter the existing two-storey detached building by converting an office unit on the second level (Unit A02002A) into a pet service use (including dog spa, dog daycare, and dog boarding (overnight and long-term care).

      120 LYNN WILLIAMS ST · Dec 11, 2024 · 414 m away
    • Minor varianceApproved

      To alter the existing four-storey, non-residential building (including office/workshop and studio/retail and service shop/commercial school uses) by increasing the permitted floor space index and reducing the number of parking spaces to zero.

      135 LIBERTY ST · Sep 25, 2024 · 302 m away

    Latest activity nearby

    • Zoning review

      Application Acceptable

      41 FRASER AVE · Nov 26, 2026 · 291 m away
    • Building permit

      Revision to the following areas - P3 shaft wall added to drawing A010 attached..P2 wall on the north side of the Mechanical Room has been replaced with P3 shaft wall, see drawing A201, attached Details added for the rating of the existing steel beams above the Mechanical room with cementitious fire spray, refer to drawing A602, attached.Addition of entry vestibule. Refer to schedule drawing A011-2, vestibule drawings A012-2, and plans on A201Proposed interior alteration of an existing space into a reception area.

      15 FRASER AVE · Nov 24, 2026 · 221 m away
    • Building permit

      Proposal for loading dock replacement

      41 FRASER AVE · Nov 9, 2026 · 291 m away
    • Building permit

      REV 01: Fire protection planProposal for interior alterations

      2-20 FRASER AVE · Nov 5, 2026 · 268 m away
    • Building permit

      Addition of a maglock door on the third floor

      60 ATLANTIC AVE · Oct 27, 2026 · 281 m away
    • Building permit

      Proposal for interior alterations to existing Group D occupancy for Zoomermedia

      70 JEFFERSON AVE · Oct 1, 2026 · 253 m away
    • Zoning review

      Closed

      24 JEFFERSON AVE · Jun 26, 2026 · 127 m away
    • Zoning review

      Closed

      30 HANNA AVE · Jun 10, 2026 · 204 m away
    • Building permit

      Conversion of existing mezzanine level into a 2nd floor for condo unit - UNIT 632

      5 HANNA AVE · Apr 27, 2026 · 229 m away
    • Building permit

      FIFA - 2m temporary wayfinding structure installation(no SP required)

      34 HANNA AVE · Apr 8, 2026 · 232 m away

    Neighbourhood: South Parkdale

    About the area around the lot, not the lot itself.

    Nearest station
    Exhibition GO Station3 min walk
    Nearest TTC stop
    Nova Scotia Ave at Manitoba Dr - Exhibition GO Station3 min walk
    Nearest cycling route
    Nova Scotia AveBike Lane, 2 min walk
    Nearest traffic count
    4,120 vehicles in 8 hJefferson Ave / Liberty St, 260 m away, Apr 19, 2023
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    34 Hanna Avenue Park4 min walk
    Lamport Stadium Park4 min walk
    Liberty Village Park8 min walk

    2021 Census

    FigureSouth ParkdaleMedian neighbourhood
    Median household income (2020)$57,200$84,500
    Households that own their home15%54%
    Population (2021)20,49516,813
    Homes built in 1960 or before37%29%
    Homes needing major repairs11%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth ParkdaleCity median
    Assault1140.3636.3
    Robbery68.669.5
    Homicide3.85.3
    Shootings7.610.5
    Auto theft72.5192.6
    Theft over $5,00045.846.1
    Break and enter240.3172.8
    Theft from vehicles205.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.