HousePrecheckCheck an address

1 Davenport RdToronto · zoning, lot size and permit records

Open space · O (x135)≈ 15.7 × 37.6 m398 m²on Yonge Stcorner, also on Davenport Rd

Not a home

Frank Stollery Parkette

The City of Toronto's real estate inventory lists Frank Stollery Parkette here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 15 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
≈ 15.7 m frontage≈ 37.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 Committee of Adjustment files on this lot

    Good to know

    3 approved. A0112/06TEY (The applicant is seeking relief from the provisions of the Zoning By-law No.438-86, as..., 2006); A0350/04TEY (The applicant is seeking relief from the provisions of the Zoning By-law No.438-86, as..., 2004); A0197/03TEY (The applicant is seeking relief from the provisions of the zoning by-law in order to co..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Minor varianceA0112/06TEYApproved

    The applicant is seeking relief from the provisions of the Zoning By-law No.438-86, as amended, in order to extend the use of the Frank Stollery Parkette for the purposes of a sales pavilion, a construction office, a shoring and construction staging area and crane swing due to the anticipated crane swing movements over the Park during the construction of the 16 storey residential condominium for an additional one year period from August 31, 2006 to August 31, 2007. The extension to use the Park is being requested due to the unexpected and unpredictable market fluctuations, construction timing and significant design revisions. The previous application (No. A0350/04TEY) was for a period of 36 months or until August 31, 2006 to use the Park for a one-storey sales office, construction office as well as shoring, construction staging and the swinging of the crane during construction. This extension is only for one year period expiring August 31, 2007. There are no other changes or uses being requested of the Park.

    Apr 5, 2006 · 1 DAVENPORT RD
  • Minor varianceA0350/04TEYApproved

    The applicant is seeking relief from the provisions of the Zoning By-law No.438-86, as amended, in order extend the use of the Park for the purposes of a sales paveilion, a construction office, a shoring and construction staging area and crane swing due to the anticipated crane swing movements over the Park during construction for an additional three years. Note: Application No. A0197/03TEY approved, on condition for a period of 18 months or until November 30, 2004, an appliction to construct a one-storey sales office onto the grounds of the existing Frank Stollery Parkette for a period of three years. The proposed sales office would be located at the South-west corner of the Parkette and would house the sales office for the previously approved 117-unit, 16-storey, residential condominium project at 8-10 Scollard Street, adjacent to the Frank Stollery Parkette (File No. A0573/01 TO). The site will also be used for shoring, construction staging and the swinging of the crane during construction. The sales office would have a frontage on Scollard Street of approximately 21.0 metres and a depth of 13.2 metres. The total floor area of the proposed sales pavilion would be approximately 220.0 square metres.

    Sep 8, 2004 · 1 DAVENPORT RD
  • Building permit03 155267Closed

    Alter plans as approved under file 03 - 155267 by changing construction of sales pavilion/office using trailors on foundation.

    May 10, 2004 · 1 DAVENPORT RD
  • Zoning review03 158417 PRZClosed
    Jul 21, 2003 · 1 DAVENPORT RD
  • Minor varianceA0197/03TEYApproved

    The applicant is seeking relief from the provisions of the zoning by-law in order to construct a one-storey sales office onto the grounds of the existing Frank Stollery Parkette for a period of three years. The proposed sales office would be located at the South-west corner of the Parkette and would house the sales office for the previously approved 117-unit, 16-storey, residential condominium project at 8-10 Scollard Street, adjacent to the Frank Stollery Parkette (File No. A0573/01 TO). The site will also be used for shoring, construction staging and the swinging of the crane during construction. The sales office would have a frontage on Scollard Street of approximately 21.0 metres and a depth of 13.2 metres. The total floor area of the proposed sales pavilion would be approximately 220.0 square metres.

    May 28, 2003 · 1 DAVENPORT RD
  • Zoning review03 124138 ZPRClosed
    Apr 15, 2003 · 1 DAVENPORT RD

Check before you build

  • Site-specific exception 900.40.10(135)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.40.10(135)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    On the lands municipally known as 1 Davenport Rd. in 2002, Section 12(1) 459 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
398 m²
Frontage
15.7 mestimated, irregular lot
Depth
37.6 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Davenport Rd37.6 m along it
Public lane
None
Max height
18 m
Max lot coverage
—
  • Site and Area Specific Policy 211, 225, 256. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone O (x135) (Open Space). Chapter 90, section 90.10 of the by-law. Source
  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: pear chanticleer (12 cm), pear chanticleer (12 cm), pear chanticleer (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%24 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
36

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Application Acceptable

    12 CUMBERLAND ST · Nov 24, 2026 · 173 m away
  • Building permit

    1 wall sign + 1 projecting sign***HELLO NORI***

    1250 BAY ST · Nov 24, 2026 · 267 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 267 m away
  • Building permit

    6 overhanging structure signs**AEVUM**

    11 YORKVILLE AVE · Nov 19, 2026 · 120 m away
  • Building permit

    Proposal for new Sprinklers System on the 3rd floor public corridor.

    60 BLOOR ST W · Nov 19, 2026 · 297 m away
  • Building permit

    INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802

    50 YORKVILLE AVE · Nov 16, 2026 · 124 m away
  • Zoning review

    Not Started

    12 CUMBERLAND ST · Nov 12, 2026 · 173 m away
  • Building permit

    Proposal for ground floor sprinkler alteration for the bicycle storage and associated office/corridor

    877 YONGE ST · Nov 10, 2026 · 178 m away
  • Building permit

    Proposal to install one (1) maglock.

    717 CHURCH ST · Nov 6, 2026 · 234 m away
  • Building permit

    2 OVERHANGING STRUCTURE SIGNS + 1 WALL SIGN**SWEAT AND TONIC**

    11 YORKVILLE AVE · Nov 3, 2026 · 120 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Yonge Station4 min walk
Nearest TTC stop
Yonge St at Davenport Rd1 min walk
Nearest cycling route
Davenport RdCycle Track, 1 min walk
Nearest traffic count
15,444 vehicles in 14 hDavenport Rd / Yonge St / Church St, 40 m away, Nov 9, 2025
Serious collisions within 500 m
72021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 3 with cyclists
Parks
Frank Stollery Parkette1 min walk
Town Hall Square1 min walk
Harold Town Park2 min walk

Schools within 1 km

  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 3 min walk
  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 5 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 8 min walk
  • CAREER QUEST - TORONTO Private 8 min walk
  • ROSEDALE DAY SCHOOL Private 9 min walk
  • BRANKSOME HALL GIRLS SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.