HousePrecheckCheck an address

1 Copeland StToronto · zoning, lot size and permit records

Employment · E 1.064.9 × 178.9 m10,219 m²on Copeland St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 06 190105 (Infill structure between two existing structures to create a new storage area, 2006, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
64.9 m frontage178.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2006

    Needs a closer look

    Still open in the City's records: 06 190105 (Infill structure between two existing structures to create a new storage area, 2006, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit18 270281Closed

    The upgrades include demolition of the existing valve chamber structure including all associated piping, valves, equipment and filling with engineering fill, coring concrete for new piping, replacing the existing ladder and railing with new FRP ladder and railing, installing new wet well FRP platform, new valves, piping and pipe supports, and reinstalling/replacing the pump guardrails, as required. A new 50mm dia. plumbing service complete with water meter, backflow preventer and hose station will also be installed.

    Jan 28, 2019 · 1 COPELAND ST
  • Building permit10 277663Closed

    Install one backflow preventer

    Nov 2, 2010 · 1 COPELAND ST
  • Building permit09 142190Closed

    Install backflow prevention device - House of Metals Co Ltd

    Jun 16, 2009 · 1 COPELAND ST
  • Building permit06 190105Inspection

    Infill structure between two existing structures to create a new storage area

    Nov 24, 2006 · 1 COPELAND ST
  • Zoning review06 165393 ZALClosed
    Aug 10, 2006 · 1 COPELAND ST
  • Building permit04 112196Closeddemolition

    Demoilish house/office

    Apr 16, 2004 · 1 COPELAND ST
  • Building permit97 007600Closeddemolition

    ONE STOREY BUILDINGS

    Jan 27, 1998 · 1 COPELAND ST

Lot facts

Area
10,219 m²
Frontage
64.9 m
Depth
178.9 m
Street
Copeland St
Corner lot
No
Public lane
None
House footprint
2,695 m²roof up to 14 m
Back yard
55.7 mhouse to rear lot line
Side yards
0 m and 27.7 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    The proposal is to permit the existing industrial building at 55 Research Road, no changes are proposed to the existing building. Due to the proposed technical severance, the application is to permit a reduced east side yard setback that is created as a result of the re-established lot line between 55 Research Road and 176 Wicksteed Avenue-57 Research Road. Cross-reference File No. B0040/24NY (Delegated Consent).

    55 RESEARCH RD · Apr 3, 2025 · 248 m away
  • Minor varianceApproved

    The current application ( new prospective tenant) is proposing an increase in the number of permitted storeys from 6-storeys to 7-storeys, while the overall height of the building (32.025m) will continue to maintain an overall metric height that is below 33.5m.

    154 WICKSTEED AVE · Jun 6, 2024 · 297 m away
  • Minor varianceApproved

    Proposal to construct a 6-storey laboratory and data center by requesting relief from the zoning by-law for the GFA, parking requirements and height.

    154 WICKSTEED AVE · Sep 28, 2023 · 297 m away
  • Minor varianceApproved

    To relocate 11 existing parking spaces and add 8 new parking spaces.

    225 WICKSTEED AVE · Oct 23, 2019 · 473 m away
  • Minor varianceApproved

    To construct a new three-storey self-storage warehouse.

    145 WICKSTEED AVE · May 16, 2018 · 330 m away

Latest activity nearby

  • Building permit

    Proposal for replacement of existing backflow preventer

    174 WICKSTEED AVE · Nov 6, 2026 · 214 m away
  • Building permitnew building

    Proposal to construct a 110'W*96'L storage structure.

    38 COMMERCIAL RD · Oct 5, 2026 · 221 m away
  • Building permit

    The work includes mobilization of crews and site setup with safety measures; structural inspection of existing rebar; layout of the new foundation; GPR scanning to locate utilities; identification and protection of existing column ties; saw cutting of the slab with dust control; removal and disposal of concrete; excavation and auger drilling to specified depths; and installation of reinforcing steel for new pads and piers, all in accordance with approved drawings and applicable codes.

    179 WICKSTEED AVE · Jul 10, 2026 · 218 m away
  • Building permit

    Proposal to replace existing exterior door and frame with structural changes to the existing opening. New door to match or exceed the thermal and fire rating of the existing unit.

    179 WICKSTEED AVE · Jun 5, 2026 · 218 m away
  • Building permit

    Proposal for interior alterations , change of use, and change openings between multiple units

    209 WICKSTEED AVE · Feb 4, 2026 · 271 m away
  • Zoning review

    Application On Hold

    38 COMMERCIAL RD · Dec 1, 2025 · 221 m away
  • Building permit

    2 wall signs**INTERIOR CARE IMPRESSIVE CLEAN**

    174 WICKSTEED AVE · Oct 9, 2025 · 214 m away
  • Building permit

    HVAC - Proposal for interior alterations to remove/add walls and separate/join units.

    201 WICKSTEED AVE · Sep 16, 2025 · 212 m away
  • Building permit

    2 Wall Signs

    174 WICKSTEED AVE · Sep 5, 2025 · 214 m away
  • Building permit

    2 Wall Signs

    174 WICKSTEED AVE · Aug 8, 2025 · 214 m away

Neighbourhood: Thorncliffe Park

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station12 min walk
Nearest TTC stop
Wicksteed Ave at Copeland St3 min walk
Nearest cycling route
Eglinton Ave EBike Lane, 9 min walk
Nearest traffic count
932 vehicles in 8 hCommercial Rd / Industrial St, 220 m away, Oct 5, 2005
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Leonard Linton Park4 min walk
E.T. Seton Park6 min walk
Serena Gundy Park10 min walk

Schools within 1 km

  • OVERLEA LINC English Public 13 min walk
  • FRASER MUSTARD EARLY LEARNING ACADEMY English Public 15 min walk
  • THORNCLIFFE PARK PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThorncliffe ParkMedian neighbourhood
Median household income (2020)$67,000$84,500
Households that own their home14%54%
Population (2021)20,40016,813
Homes built in 1960 or before21%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThorncliffe ParkCity median
Assault638636.3
Robbery83.969.5
Auto theft377.7192.6
Theft over $5,00054.646.1
Break and enter104.9172.8
Theft from vehicles226.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.